Channing and Ontonagon
Rail-trail in Michigan
Runs through Ontonagon, Ontonagon Township and Rockland Township · Ontonagon County
Conditions now
Loading the weather near Ontonagon…
Forecast by the National Weather Service for Ontonagon · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Michigan DNR Parks and Recreation Division.2
- Length
- 12.5 mi 20.1 km1
- Last checked
- Oct 31, 2026
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The trail on this page is the Ontonagon to Rockland railroad corridor, a state trail on a former rail line in Ontonagon County in Michigan's western Upper Peninsula. It runs about 13 miles southeast from the village of Ontonagon to Rockland. The Michigan Department of Natural Resources Parks and Recreation Division owns and administers it as part of its Western Upper Peninsula trails.
The Escanaba & Lake Superior Railroad Co. of Wells owned the inactive line. In June 2014 DNR Director Keith Creagh approved buying the 13-mile, 160.6-acre corridor from the railroad for $516,715, together with a railroad bridge over the Ontonagon River, a junction and half a mile of spur within Ontonagon. The sale was not to close before September 1, 2014, so that Highland Copper Co. could finish a study of rail service on the line. The purchase was meant to provide a designated off-road vehicle route and a trail from the village to a marina, and the land was to be designated a Michigan Trailway once the legal requirements were met.
The DNR lists the corridor as open, with a natural dirt surface at least 12 feet wide that is not accessible to wheelchairs. Hiking, mountain biking, horseback riding, cross-country skiing and snowshoeing are permitted. It is also part of the DNR's OR off-road vehicle route, open to vehicles up to 72 inches wide, and carries snowmobile trails 12 and 137, so bicyclists share it with motorized traffic.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 96% of this route as an abandoned rail line, naming the line Channing-Ontonagon.
- Shade
62% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Ontonagon 6 SE, 5.6 km from the trail's middle, 31 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 30 40 52 66 75 79 78 70 56 41 30 Low °F 9 9 18 30 41 50 55 54 48 38 27 16 Precipitation, in 2.9 1.6 1.7 2.4 3.1 2.9 3.2 3 3 3.6 2.7 2.9 Snow, in 53.1 27 17.6 6.9 1 0 0 0 0.1 2.5 21.4 48.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1955 Ontonagon sheet (1:62,500); the 1958 Iron River sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 2
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026 “managing_org from Michigan DNR Statewide Railtrails”
- Statewide Railtrails layer, Ontonagon To Rockland Railroad Corridor — Michigan DNR open data · government source · checked Oct 15, 2026 Supports: rail grade name Ontonagon To Rockland Railroad Corridor; state trail, rail-trail on railroad grade; Ontonagon County; Western Upper Peninsula Trails unit; owned and administered by DNR Parks and Recreation; open; dirt natural surface, 12 feet and over, not ADA accessible; hiking, mountain biking, equestrian, skiing and snowshoe permissible; ORV Route 72 inch, OR Route; snowmobile trails UP 12 and UP 137; segments total about 12.6 miles
- State plans to buy U.P. railroad grade for trail — The Mining Gazette (June 20, 2014) · press · checked Oct 15, 2026 Supports: Director Keith Creagh approved purchase; 13 miles, 160.6 acres of inactive railway line in Ontonagon County from the village of Ontonagon southeast to Rockland; seller Escanaba & Lake Superior Railroad Co. of Wells; $516,715; Ontonagon River railroad bridge, junction and 0.5 mile of spur; closing not before Sept. 1 for a Highland Copper rail feasibility study; ORV route and village-to-marina trail; to be designated a Michigan Trailway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.

