States › Iowa

Chavenelle Trail

Greenway in Iowa

Runs through Dubuque · Dubuque County

Conditions now

Loading the weather near Dubuque…

Forecast by the National Weather Service for Dubuque · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.4 mi 3.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Chavenelle Road mile 0.1 directions to trailhead 1
  2. Parking at Chavenelle Road mile 0.4 directions to trailhead 2
  3. Parking at Futuro Court mile 0.4 directions to trailhead 3
  4. Parking at Chavenelle Road mile 0.4 directions to trailhead 4
  5. Parking at Chavenelle Road mile 1.7 directions to trailhead 5
  6. Parking at Chavenelle Road mile 2.1 · restrooms directions to trailhead 6
  7. Parking at Chavenelle Road mile 2.3 directions to trailhead 7
Dunleith and Dubuque Bridge (opens in a new tab)
Dunleith and Dubuque Bridge · Photo: Kevin Schuchmann · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Chavenelle Trail is a 10-foot-wide multi-use path of a little over 2 miles along the north side of Chavenelle Road on the west side of Dubuque, Iowa, connecting the Northwest Arterial at Chavenelle Road with Seippel Road. The City of Dubuque planned it as part of its overall trail plan, with the longer-term aim of reaching the Southwest Arterial.

In 2019 the city put the cost at $1.1 million, with the city paying 20 percent and the rest coming from a federal earmark tied to the Southwest Arterial in a 2009 federal highway bill. The first phase, about 8,000 feet from Seippel Road to Radford Road, was expected to be finished between fall 2019 and March 2020, with a second phase covering the rest of the route east to the Northwest Arterial to follow in 2020.

At its east end the trail meets the Northwest Arterial Trail, a 4.8-mile asphalt path that follows the Northwest Arterial north to the Heritage Trail. At the west end, Chavenelle Road passes the Bergfeld Recreation Area, a 30-acre park with playgrounds and fishing on Bergfeld Pond, where the 1.8-mile asphalt Bergfeld Recreation Trail begins just east of Seippel Road and runs north to Pennsylvania Avenue. The recreation area has parking off Chavenelle Road.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Dubuque L&D 11, 10.8 km from the trail's middle, 67 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283245587181848275614633
Low °F101325384960646254422918
Precipitation, in1.31.42.13.84.45.65.33.83.93.12.41.7
Snow, in11.78.63.70.9000000.11.29.9
Old maps

USGS topographic maps of the trail's middle go back to the 1901 Peosta sheet (1:125,000); the 1966 Peosta sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. New bike/hike trail planned for Dubuque — BIKEIOWA (from the Telegraph Herald, 2019) · web · checked Oct 15, 2026
    Supports: route from the Northwest Arterial at Chavenelle Road to Seippel Road, north side of Chavenelle, 10-foot width, a little over 2 miles, trail plan and Southwest Arterial goal, cost and funding split, 2009 federal earmark, phase 1 extent and timing, phase 2 the following year
  3. Northwest Arterial Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 15, 2026
    Supports: 4.8-mile asphalt trail ending at NW Arterial and Chavenelle Road, link to the Heritage Trail
  4. Bergfeld Recreation Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 15, 2026
    Supports: 30-acre Bergfeld Recreation Area, playgrounds and pond fishing, 1.8-mile asphalt trail from Chavenelle Road east of Seippel Road to Pennsylvania Avenue, parking off Chavenelle Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.