Chesapeake Beach Railroad Trail
Rail-trail in Maryland
Runs through Brown Station and Marlboro Village · Prince George's County
Conditions now
Loading the weather near Marlboro Village…
Forecast by the National Weather Service for Marlboro Village · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Penzance Place mile 0 directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Chesapeake Beach Railroad Trail is a paved path in central Prince George's County, Maryland, on part of the old Chesapeake Beach Railway corridor. The Maryland-National Capital Park and Planning Commission (M-NCPPC) lists it among its Prince George's parks and trails with an Upper Marlboro address, 31.54 acres of parkland and dawn-to-dusk hours. It is one of the short built pieces of the Chesapeake Beach Rail Trail, a planned corridor that M-NCPPC has acquired in portions through the subdivision process and will own and maintain; plans call for about 11 miles in Prince George's County and 28 miles of greenway through Calvert and Anne Arundel counties.
The railway ran 27.6 miles from Washington, D.C., through Upper Marlboro and Maryland farm country to a resort at Chesapeake Beach on the bay. Its construction was overseen by the Colorado railroad builder Otto Mears. It operated from 1898 until it closed amid the Great Depression and the rise of the automobile; the last train left on April 15, 1935.
As mapped, the trail runs about 1.3 miles southeast from the Largo area toward Marlboro Village, with trailhead parking off Penzance Place. Elsewhere in the county, the town of Upper Marlboro obtained planning-assistance funding in June 2023 for a feasibility and design study of another segment of the rail trail, between MD 725 (Marlboro Pike) and the county's equestrian center. At the bay end, a separate Chesapeake Beach Railway Trail in Calvert County was dedicated on September 30, 2011.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former Chesapeake Beach RR (STB docket FD-10739). From MDOT SHA Railroad Centerline Routes.
- Shade
63% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Upper Marlboro 3 NNW, 2.5 km from the trail's middle, 12 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 44 47 55 66 75 84 88 86 80 69 58 48 Low °F 25 26 33 44 54 63 67 65 58 46 36 29 Precipitation, in 3 2.7 3.9 3.4 4.1 4.2 4.2 4.1 4.5 4.1 3.2 3.5 Snow, in 5.7 6.3 1.7 0 0 0 0 0 0 0 0 2.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1899 Patuxent sheet (1:125,000); the 1957 Upper Marlboro sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesChesapeake Beach Railroad Trail (Prince George's Parks)
Nearby trails
- Back Branch Trail 1.1 mi away · 1.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Chesapeake Beach Rail Trail Segment Feasibility and Design Study — Prince George's County Planning Department · organization · checked Oct 14, 2026 Supports: Upper Marlboro segment study, PAMC funding approved June 22, 2023
- Chesapeake Beach Rail Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: planned rail trail, M-NCPPC acquisition through subdivision and future ownership, 11 miles in Prince George's and 28 miles in Calvert and Anne Arundel, study segment between MD 725 and the equestrian center, Calvert section dedicated September 30, 2011
- Chesapeake Beach Railway — Wikipedia · organization · checked Oct 14, 2026 Supports: 27.6-mile route from Washington through Upper Marlboro to Chesapeake Beach, Otto Mears, operation from 1898, closure and last train April 15, 1935
- Chesapeake Beach Railroad Trail — Prince George's County Parks and Recreation (M-NCPPC) · web · checked Oct 14, 2026 Supports: trail name, M-NCPPC listing, Upper Marlboro address, 31.54 acres, dawn-to-dusk hours
- Chesapeake Beach Railroad Trail (way 640385259) — OpenStreetMap · web · checked Oct 14, 2026 Supports: mapped route between the Largo area and Marlboro Village, paved cycleway on the abandoned railbed, Penzance Place parking
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.