Clam River Greenway
Greenway in Michigan
Runs through Cadillac · Wexford County
Conditions now
Loading the weather near Cadillac…
Forecast by the National Weather Service for Cadillac · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Plett Road mile 0 directions to trailhead 1
- Parking at Plett Road mile 0 directions to trailhead 2
- Parking at East 13th Street mile 0 directions to trailhead 3
- Parking at Plett Road mile 0 directions to trailhead 4
- Parking at Wheeler Street mile 0.9 directions to trailhead 5
- Parking at North Mitchell Street mile 1 directions to trailhead 6
- Parking at West River Street mile 1.1 directions to trailhead 7
- Parking at Haynes Street mile 1.5 directions to trailhead 8
- Parking at Chestnut Street mile 1.5 directions to trailhead 9
(opens in a new tab) About this trail
Clam River Greenway is a paved multi-use path of about 1.6 miles through Cadillac, Michigan, in Wexford County. It was built by the city over roughly a decade, led by a citizen committee, to turn a channelized, neglected river corridor into a connected path. It is not a rail-trail.
The greenway runs north to south through residential neighborhoods and links the Cadillac All-Sports Association soccer and baseball fields, Lincoln Elementary School, shopping along Mitchell Street, and the junior and senior high schools. Its southern end connects to the Keith McKellop walkway on the northeast shore of Lake Cadillac, which leads to the in-city spur of the White Pine Trail. The committee has discussed linking it to the 11.3-mile Cadillac Pathway.
Construction came in three phases. The first two used land the city already controlled, such as platted alley rights-of-way and school property; the third needed 16 private easements. Engineering and construction cost about $800,000, mostly from one Michigan Department of Transportation grant and two Department of Natural Resources grants. The path is 8 to 10 feet wide and has more than 1,600 feet of boardwalk. The city received a 2009 state fitness-council award for the project. In July 2023 the city's Department of Public Works carried out a full cleanup after litter and vandalism.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cadillac, 0.9 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 27 30 40 53 66 76 80 78 70 56 43 32 Low °F 12 12 20 31 43 53 58 55 48 37 28 20 Precipitation, in 2 1.5 2.1 3.6 3.6 3.6 3.5 3.5 3.2 3.9 2.7 2 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Traverse City sheet (1:250,000); the 1956 Cadillac North sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- White Pine Trail State Park 0.7 mi away · 96.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- The Clam River Greenway is Connecting People in Cadillac, Michigan - Michigan Municipal League · organization · checked Oct 18, 2026 Supports: 1.6 miles, width, connections, three phases, 16 easements, $800,000 and grants, 1,600 feet of boardwalk, 2009 award, Cadillac Pathway plan, KM walkway and White Pine spur
- Clam River Greenway trail finally gets a full cleanup - 9&10 News · press · checked Oct 18, 2026 Supports: July 2023 city DPW cleanup, litter and vandalism
- OpenStreetMap · web · checked Oct 18, 2026 Supports: paved surface (record data)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.