States › Georgia

Clayton Connects Trail

Greenway in Georgia · OpenStreetMap relation

In Clayton County

Conditions now

Loading the weather near Stockbridge…

Forecast by the National Weather Service for Stockbridge · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.4 mi 7.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Clayton Connects Trail drawn on the 1954 USGS topographic map of Jonesboro, Georgia
Then: the 1954 USGS Jonesboro sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Clayton Connects Trail is a 4.4-mile greenway in Clayton County, Georgia, that runs through Clayton County International Park to the Lake Spivey Golf Club. The PATH Foundation, which designed it, describes a relatively flat trail that connects a senior citizens center with a new recreation center. Its name comes from Clayton Connects, the county's greenway trail system master plan, completed in February 2015, which identifies 112 miles of linear parks and trails across the county.

Clayton County's SPLOST program lists a Lake Spivey Trail System between the same two centers: a 5.4-mile trail linking the J. Charley Griswell Senior Center with the new Lake Spivey Recreation Center, designed by the PATH Foundation, with a budget of $3,959,729; the program's page shows construction under way in March 2025. KAIZEN Collaborative, which prepared the master plan, reports an earlier 2.3-mile loop around International Park and Lake Spivey Golf Course as completed. The trail has four bridges, two across lakes, one over a ravine on the golf course and one over the park's entrance. PATH lists the Lake Spivey Trailhead as the main parking and access point.

Our map record follows OpenStreetMap's Clayton Connects Trail route for about 4.4 miles as one continuous path, mapped as concrete with a wooden boardwalk and several bridges. Clayton County Parks and Recreation publishes maps of the Clayton Connects segments and the International Park trails.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Jonesboro, 4.2 km from the trail's middle, 25 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F535665738087908983736255
Low °F323542495966706963524135
Precipitation, in54.954.23.54.65.14.43.63.64.25
Snow, in0.500.1000000000.2
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Jonesboro sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 19796149, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Clayton Connects — PATH Foundation · organization · checked Oct 16, 2026
    Supports: 4.4 miles, greenway through International Park to Spivey Golf Club, relatively flat, senior center to new recreation center, four bridges, Lake Spivey Trailhead parking
  3. Lake Spivey Trail System — Clayton County SPLOST · web · checked Oct 16, 2026
    Supports: 5.4-mile trail connecting the J. Charley Griswell Senior Center to the new Lake Spivey Recreation Center, PATH Foundation as design firm, budget $3,959,729, construction photo dated March 2025
  4. Trail Development Plan — Clayton County Parks and Recreation · web · checked Oct 16, 2026
    Supports: county maps of Clayton Connects District 4 trail segments and International Park trails
  5. Clayton Connects Greenway Trail System Master Plan — KAIZEN Collaborative · web · checked Oct 16, 2026
    Supports: countywide master plan completed February 2015, 112 miles of linear parks and trails, 2.3-mile completed loop around International Park and Lake Spivey Golf Course
  6. Clayton Connects Trail — OpenStreetMap relation 19796149 · web · checked Oct 16, 2026
    Supports: mapped length, continuous route, concrete surface, wooden boardwalk, bridges

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.