States › Florida

Clear Lake Trail

Greenway in Florida

Runs through West Palm Beach · Palm Beach County

Conditions now

Loading the weather near West Palm Beach…

Forecast by the National Weather Service for West Palm Beach · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.6 mi 2.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Clear Lake Trail drawn on the 1950 USGS topographic map of Palm Beach, Florida
Then: the 1950 USGS Palm Beach sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Clear Lake Trail is a 1.5-mile path for cyclists and pedestrians along Clear Lake in West Palm Beach, Florida, built by the City of West Palm Beach between Palm Beach Lakes Boulevard and downtown. The city opened it with a ribbon cutting on August 17, 2024. WLRN put the cost at about $2.5 million, paid largely by $1.38 million from the Florida Department of Transportation through the Palm Beach Transportation Planning Agency, with $600,000 in federal Community Development Block Grant money, city funds, and $75,000 from the Florida Department of Agriculture and Consumer Services for trees. The project planted 148 native trees, chosen because Clear Lake supplies drinking water to a nearby treatment plant.

The trail entrance is at 360 Presidio Place. OpenStreetMap maps the path as paved and concrete, with a boardwalk at its southern end. The mayor said in 2024 that plans call for a boardwalk from Okeechobee Boulevard to Australian Avenue, and the city intends to seek funding to extend the trail along other parts of Clear Lake and Lake Mangonia.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
West Palm Beach International Airport, 3.9 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F757779828688909088858076
Low °F586063687275767676736662
Precipitation, in3.52.63.33.74.98.55.68.785.93.63.5
Old maps

USGS topographic maps of the trail's middle go back to the 1946 Palm Beach sheet (1:24,000); the 1950 Palm Beach sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Fighting climate change? City offers safe, green passage — WLRN (August 27, 2024) · organization · checked Oct 17, 2026
    Supports: 1.5 miles; City of West Palm Beach; Palm Beach Lakes Blvd to downtown along Clear Lake; August 17, 2024 ribbon cutting; about $2.5 million; $1.38M FDOT via Palm Beach TPA, $600,000 CDBG, city contributions, $75,000 FDACS for trees; 148 native trees; Clear Lake supplies drinking water to nearby treatment plant; planned boardwalk Okeechobee Blvd to Australian Ave; plans to extend along Clear Lake and Lake Mangonia
  3. West Palm Beach Debuts Clear Lake Trail Expansion with Ribbon-Cutting Event and Festivities — Hoodline · web · checked Oct 17, 2026
    Supports: entrance at 360 Presidio Pl.; ribbon cutting Saturday, August 17, 2024
  4. OpenStreetMap way 1287452579 (Clear Lake Trail) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: concrete boardwalk at the southern end; paved and concrete surfaces on ways 586711556 and 1287452004

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.