Cleveland Lakefront Bikeway
Greenway in Ohio · OpenStreetMap relation
Runs through Cleveland and Bratenahl · Cuyahoga County
Conditions now
Loading the weather near Cleveland…
Forecast by the National Weather Service for Cleveland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Harborview Drive mile 0 directions to trailhead 1
- Parking at Upper Edgewater Drive mile 1.2 · restrooms directions to trailhead 2
- Parking at Upper Edgewater Drive mile 1.3 · restrooms · water directions to trailhead 3
- Parking at Upper Edgewater Drive mile 1.3 · restrooms directions to trailhead 4
- Parking mile 1.4 · restrooms · water directions to trailhead 5
- Parking at Ed Hauser Way mile 2 directions to trailhead 6
- Parking mile 2 directions to trailhead 7
- Parking at Breakwater Avenue mile 2.5 directions to trailhead 8
- Parking at Stone Avenue mile 2.6 directions to trailhead 9
- Parking at Stone Avenue mile 2.6 directions to trailhead 10
- Parking at Breakwater Avenue mile 2.6 directions to trailhead 11
- Parking at Breakwater Avenue mile 2.6 directions to trailhead 12
- Parking at Cass Avenue mile 2.7 directions to trailhead 13
- Parking at Stone Avenue mile 2.7 directions to trailhead 14
- Parking at Stone Avenue mile 2.7 directions to trailhead 15
- Parking at Detroit Avenue mile 3.1 directions to trailhead 16
- Parking at West 45th Street mile 3.1 directions to trailhead 17
- Parking at Wheat Court mile 3.2 directions to trailhead 18
- Parking at Church Avenue mile 3.3 directions to trailhead 19
- Parking at West 33rd Street mile 3.3 directions to trailhead 20
- Parking at Wheat Court mile 3.3 directions to trailhead 21
- Parking at West 28th Street mile 3.6 directions to trailhead 22
- Parking at Vermont Avenue mile 3.6 directions to trailhead 23
- Parking at Washington Avenue mile 3.6 directions to trailhead 24
- Parking at Detroit Avenue mile 3.6 directions to trailhead 25
- Parking at Detroit Avenue mile 3.6 directions to trailhead 26
- Parking at West 26th Street mile 3.7 directions to trailhead 27
- Parking at Frankfort Avenue mile 4.3 directions to trailhead 28
- Parking at West Huron Road mile 4.3 directions to trailhead 29
- Parking at Frankfort Avenue mile 4.3 directions to trailhead 30
- Parking at West 10th Street mile 4.4 directions to trailhead 31
- Parking at Frankfort Avenue mile 4.5 directions to trailhead 32
- Parking at West 9th Street mile 4.5 directions to trailhead 33
- Parking at West Saint Clair Avenue mile 4.6 directions to trailhead 34
- Parking at West 4th Street mile 4.6 directions to trailhead 35
- Parking at West 4th Street mile 4.7 directions to trailhead 36
- Parking at West 4th Street mile 4.7 directions to trailhead 37
- Parking at Summit Street mile 4.8 directions to trailhead 38
- Parking at West 4th Street mile 4.8 directions to trailhead 39
- Parking at Port of Cleveland mile 5 directions to trailhead 40
- Parking mile 5.2 directions to trailhead 41
- Parking at Erieside Avenue mile 5.3 directions to trailhead 42
- Parking at Corps of Engineers Access mile 5.7 · restrooms directions to trailhead 43
- Parking at Coast Guard Access mile 5.7 directions to trailhead 44
- Parking at Coast Guard Access mile 5.9 directions to trailhead 45
- Muni Lot mile 6 directions to Muni Lot
- Muni Lot mile 6.3 directions to Muni Lot
- Parking at North Marginal Road mile 8.6 directions to trailhead 48
- Parking at North Marginal Road mile 8.7 directions to trailhead 49
- Parking at North Marginal Road mile 8.8 directions to trailhead 50
- Parking at North Marginal Road mile 8.9 directions to trailhead 51
- Parking mile 9.3 directions to trailhead 52
- Parking mile 9.4 directions to trailhead 53
- Parking at East 72nd Street mile 9.4 directions to trailhead 54
- Parking at East 72nd Street mile 9.4 directions to trailhead 55
- Boat Trailer Parking mile 9.7 · restrooms directions to Boat Trailer Parking
- Boat Trailer Parking mile 9.7 · restrooms directions to Boat Trailer Parking
- Parking at North Marginal Road mile 9.7 · restrooms directions to trailhead 58
- Parking at Lakeshore Boulevard mile 10 · restrooms · water directions to trailhead 59
- Parking at Lakeshore Boulevard mile 10 · restrooms · water directions to trailhead 60
- Parking at Holden Lane mile 10.3 directions to trailhead 61
- Parking at Holden Lane mile 10.3 directions to trailhead 62
- Parking at Lake Shore Boulevard mile 14.5 directions to trailhead 63
- Parking at Lake Shore Boulevard mile 14.6 directions to trailhead 64
- Parking at Viola Avenue mile 14.7 directions to trailhead 65
- Parking at Viola Avenue mile 14.7 directions to trailhead 66
- Parking at Wildwood Drive mile 15.2 · restrooms · water directions to trailhead 67
- Parking at Wildwood Drive mile 15.3 · restrooms · water directions to trailhead 68
- Parking at Wildwood Drive mile 15.3 · restrooms · water directions to trailhead 69
- Parking at Neff Road mile 15.4 directions to trailhead 70
- Parking at Neff Road mile 15.4 · restrooms · water directions to trailhead 71
- Parking at Neff Road mile 15.4 · restrooms · water directions to trailhead 72
Plan your visit
- By trainAmtrak: Cleveland, OH (CLE) 0.2 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Cleveland Lakefront Bikeway is a signed bicycle route of about 15 miles along the Lake Erie shoreline of Cleveland, Ohio, from Edgewater Park on the west side to Wildwood Park on the east side. It mixes paved off-road trail with on-road sections. This record maps about 4.3 miles of off-road path in two pieces: one on the west side between Edgewater Park and the Detroit Avenue area, and one on the east side along North Marginal Road from near East 55th Street to Gordon Park and Martin Luther King Jr. Boulevard.
On the east side, the Mandel Community Trail closed a long gap in the route. Its new 2.7-mile off-road paved segment along the north side of North Marginal Road, built by the Cuyahoga County Department of Public Works with the City of Cleveland and Cleveland Metroparks, links East 9th Street, near North Coast Harbor and the Rock and Roll Hall of Fame, to the existing bikeway at East 55th Street. Before it was built, people on foot on that part of North Marginal Road had to share the roadway with cars. Metroparks added lighting, surface repairs, crosswalks and wayfinding on the existing 1.3 miles between East 55th Street and Martin Luther King Jr. Boulevard. The full lighted, paved connection from East 9th Street to MLK Jr. Boulevard opened on September 22, 2026.
The Mandel Community Trail was funded by a $5 million gift from the Jack, Joseph and Morton Mandel Foundation and $5.6 million from the Northeast Ohio Areawide Coordinating Agency through the federal Carbon Reduction Program, with local matching funds. At Gordon Park the bikeway connects with the Harrison Dillard Bikeway, which runs south to University Circle, and downtown it connects to the Cleveland Foundation Centennial Lake Link Trail.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cleveland Burke Airport, 1.6 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 37 45 57 68 77 81 80 74 62 50 40 Low °F 24 24 31 41 53 63 68 67 60 49 38 30 Precipitation, in 1.8 1.5 2.4 3.1 3.5 2.8 3.7 3.5 2.9 3.2 2.9 2 - On the National Register
- Hoyt Block, Cleveland · building, listed 1974 · nomination file for Hoyt Block
- Federal Knitting Mills Building, Cleveland · building, listed 2001 · nomination file for Federal Knitting Mills Building
- Cleveland Municipal Stadium, Cleveland · structure, listed 1987 · nomination file for Cleveland Municipal Stadium
- USS COD (submarine), Cleveland · structure, listed 1986 · nomination file for USS COD (submarine)
- Cleveland Warehouse District, Cleveland · historic district, listed 1982 · nomination file for Cleveland Warehouse District
- Euclid Avenue Historic District, Cleveland · historic district, listed 2002 · nomination file for Euclid Avenue Historic District
- Cleveland Centre Historic District, Cleveland · historic district, listed 2014
- Cleveland Mall, Cleveland · historic district, listed 1975 · nomination file for Cleveland Mall
- Rockefeller Park and Cleveland Cultural Gardens Historic District, Cleveland · historic district, listed 2005 · nomination file for Rockefeller Park and Cleveland Cultural Gardens Historic District
- Ohio City Preservation District, Cleveland · historic district, listed 1974 · nomination file for Ohio City Preservation District
- Old maps
USGS topographic maps of the trail's middle go back to the 1901 Euclid sheet (1:62,500); the 1953 Cleveland North sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesMandel Community Trail — Cleveland Metroparks
- RedditSearch Reddit: r/Ohio
Nearby trails
- Whiskey Island Connector Trail within 0.2 mi · 1.4 mi, paved
- Harrison Dillard Bikeway within 0.2 mi · 3.1 mi, paved
- Ohio & Erie Canal Towpath Trail within 0.2 mi · 85.4 mi, paved
- Cleveland Foundation Centennial Trail within 0.2 mi · 0.8 mi, paved
- Red Line Greenway 0.4 mi away · 1.9 mi, paved
- Euclid Creek Greenway 1.5 mi away · 3.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13620723, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- New trail increases access to Cleveland's east side lakefront — Spectrum News 1 (September 24, 2026) · press · checked Oct 14, 2026 Supports: trail along the north side of North Marginal Road; access to North Coast Harbor and the Rock and Roll Hall of Fame; pedestrians previously shared the roadway with cars; officials call it a critical missing link in the Cleveland Lakefront Bikeway
- Mandel Community Trail — Cleveland Metroparks · web · checked Oct 14, 2026 Supports: Mandel Community Trail is a portion of the Cleveland Lakefront Bikeway between E. 9th St and MLK Jr. Blvd along North Marginal Road; new 2.7-mile off-road paved segment E. 9th to E. 55th managed by Cuyahoga County Department of Public Works with the City of Cleveland and Metroparks; connects to existing bikeway E. 55th to MLK Jr. Blvd; 1.3 miles of improvements (lighting, surface repairs, ADA crosswalks, wayfinding) by Metroparks; opened September 22, 2026 as a continuous lighted, paved connection; $5 million Mandel Foundation gift and $5.6 million NOACA Carbon Reduction Program funds plus local match; Harrison Dillard Bikeway runs south from Gordon Park to University Circle
- Cleveland Lakefront Bikeway — TrailLink · web · checked Oct 14, 2026 Supports: 15.13 miles; endpoints Edgewater Park and Wildwood Park; on-road sections with a signed route; connection to the Cleveland Foundation Centennial Lake Link Trail downtown
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.