States › Ohio

Cleveland Lakefront Bikeway

Greenway in Ohio · OpenStreetMap relation

Runs through Cleveland and Bratenahl · Cuyahoga County

Conditions now

Loading the weather near Cleveland…

Forecast by the National Weather Service for Cleveland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.8 mi 9.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Harborview Drive mile 0 directions to trailhead 1
  2. Parking at Upper Edgewater Drive mile 1.2 · restrooms directions to trailhead 2
  3. Parking at Upper Edgewater Drive mile 1.3 · restrooms · water directions to trailhead 3
  4. Parking at Upper Edgewater Drive mile 1.3 · restrooms directions to trailhead 4
  5. Parking mile 1.4 · restrooms · water directions to trailhead 5
  6. Parking at Ed Hauser Way mile 2 directions to trailhead 6
  7. Parking mile 2 directions to trailhead 7
  8. Parking at Breakwater Avenue mile 2.5 directions to trailhead 8
  9. Parking at Stone Avenue mile 2.6 directions to trailhead 9
  10. Parking at Stone Avenue mile 2.6 directions to trailhead 10
  11. Parking at Breakwater Avenue mile 2.6 directions to trailhead 11
  12. Parking at Breakwater Avenue mile 2.6 directions to trailhead 12
  13. Parking at Cass Avenue mile 2.7 directions to trailhead 13
  14. Parking at Stone Avenue mile 2.7 directions to trailhead 14
  15. Parking at Stone Avenue mile 2.7 directions to trailhead 15
  16. Parking at Detroit Avenue mile 3.1 directions to trailhead 16
  17. Parking at West 45th Street mile 3.1 directions to trailhead 17
  18. Parking at Wheat Court mile 3.2 directions to trailhead 18
  19. Parking at Church Avenue mile 3.3 directions to trailhead 19
  20. Parking at West 33rd Street mile 3.3 directions to trailhead 20
  21. Parking at Wheat Court mile 3.3 directions to trailhead 21
  22. Parking at West 28th Street mile 3.6 directions to trailhead 22
  23. Parking at Vermont Avenue mile 3.6 directions to trailhead 23
  24. Parking at Washington Avenue mile 3.6 directions to trailhead 24
  25. Parking at Detroit Avenue mile 3.6 directions to trailhead 25
  26. Parking at Detroit Avenue mile 3.6 directions to trailhead 26
  27. Parking at West 26th Street mile 3.7 directions to trailhead 27
  28. Parking at Frankfort Avenue mile 4.3 directions to trailhead 28
  29. Parking at West Huron Road mile 4.3 directions to trailhead 29
  30. Parking at Frankfort Avenue mile 4.3 directions to trailhead 30
  31. Parking at West 10th Street mile 4.4 directions to trailhead 31
  32. Parking at Frankfort Avenue mile 4.5 directions to trailhead 32
  33. Parking at West 9th Street mile 4.5 directions to trailhead 33
  34. Parking at West Saint Clair Avenue mile 4.6 directions to trailhead 34
  35. Parking at West 4th Street mile 4.6 directions to trailhead 35
  36. Parking at West 4th Street mile 4.7 directions to trailhead 36
  37. Parking at West 4th Street mile 4.7 directions to trailhead 37
  38. Parking at Summit Street mile 4.8 directions to trailhead 38
  39. Parking at West 4th Street mile 4.8 directions to trailhead 39
  40. Parking at Port of Cleveland mile 5 directions to trailhead 40
  41. Parking mile 5.2 directions to trailhead 41
  42. Parking at Erieside Avenue mile 5.3 directions to trailhead 42
  43. Parking at Corps of Engineers Access mile 5.7 · restrooms directions to trailhead 43
  44. Parking at Coast Guard Access mile 5.7 directions to trailhead 44
  45. Parking at Coast Guard Access mile 5.9 directions to trailhead 45
  46. Muni Lot mile 6 directions to Muni Lot
  47. Muni Lot mile 6.3 directions to Muni Lot
  48. Parking at North Marginal Road mile 8.6 directions to trailhead 48
  49. Parking at North Marginal Road mile 8.7 directions to trailhead 49
  50. Parking at North Marginal Road mile 8.8 directions to trailhead 50
  51. Parking at North Marginal Road mile 8.9 directions to trailhead 51
  52. Parking mile 9.3 directions to trailhead 52
  53. Parking mile 9.4 directions to trailhead 53
  54. Parking at East 72nd Street mile 9.4 directions to trailhead 54
  55. Parking at East 72nd Street mile 9.4 directions to trailhead 55
  56. Boat Trailer Parking mile 9.7 · restrooms directions to Boat Trailer Parking
  57. Boat Trailer Parking mile 9.7 · restrooms directions to Boat Trailer Parking
  58. Parking at North Marginal Road mile 9.7 · restrooms directions to trailhead 58
  59. Parking at Lakeshore Boulevard mile 10 · restrooms · water directions to trailhead 59
  60. Parking at Lakeshore Boulevard mile 10 · restrooms · water directions to trailhead 60
  61. Parking at Holden Lane mile 10.3 directions to trailhead 61
  62. Parking at Holden Lane mile 10.3 directions to trailhead 62
  63. Parking at Lake Shore Boulevard mile 14.5 directions to trailhead 63
  64. Parking at Lake Shore Boulevard mile 14.6 directions to trailhead 64
  65. Parking at Viola Avenue mile 14.7 directions to trailhead 65
  66. Parking at Viola Avenue mile 14.7 directions to trailhead 66
  67. Parking at Wildwood Drive mile 15.2 · restrooms · water directions to trailhead 67
  68. Parking at Wildwood Drive mile 15.3 · restrooms · water directions to trailhead 68
  69. Parking at Wildwood Drive mile 15.3 · restrooms · water directions to trailhead 69
  70. Parking at Neff Road mile 15.4 directions to trailhead 70
  71. Parking at Neff Road mile 15.4 · restrooms · water directions to trailhead 71
  72. Parking at Neff Road mile 15.4 · restrooms · water directions to trailhead 72

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Cleveland Lakefront Bikeway.png (opens in a new tab)
Cleveland Lakefront Bikeway.png · Photo: Cards84664 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Cleveland Lakefront Bikeway is a signed bicycle route of about 15 miles along the Lake Erie shoreline of Cleveland, Ohio, from Edgewater Park on the west side to Wildwood Park on the east side. It mixes paved off-road trail with on-road sections. This record maps about 4.3 miles of off-road path in two pieces: one on the west side between Edgewater Park and the Detroit Avenue area, and one on the east side along North Marginal Road from near East 55th Street to Gordon Park and Martin Luther King Jr. Boulevard.

On the east side, the Mandel Community Trail closed a long gap in the route. Its new 2.7-mile off-road paved segment along the north side of North Marginal Road, built by the Cuyahoga County Department of Public Works with the City of Cleveland and Cleveland Metroparks, links East 9th Street, near North Coast Harbor and the Rock and Roll Hall of Fame, to the existing bikeway at East 55th Street. Before it was built, people on foot on that part of North Marginal Road had to share the roadway with cars. Metroparks added lighting, surface repairs, crosswalks and wayfinding on the existing 1.3 miles between East 55th Street and Martin Luther King Jr. Boulevard. The full lighted, paved connection from East 9th Street to MLK Jr. Boulevard opened on September 22, 2026.

The Mandel Community Trail was funded by a $5 million gift from the Jack, Joseph and Morton Mandel Foundation and $5.6 million from the Northeast Ohio Areawide Coordinating Agency through the federal Carbon Reduction Program, with local matching funds. At Gordon Park the bikeway connects with the Harrison Dillard Bikeway, which runs south to University Circle, and downtown it connects to the Cleveland Foundation Centennial Lake Link Trail.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cleveland Burke Airport, 1.6 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353745576877818074625040
Low °F242431415363686760493830
Precipitation, in1.81.52.43.13.52.83.73.52.93.22.92
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1901 Euclid sheet (1:62,500); the 1953 Cleveland North sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 13620723, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. New trail increases access to Cleveland's east side lakefront — Spectrum News 1 (September 24, 2026) · press · checked Oct 14, 2026
    Supports: trail along the north side of North Marginal Road; access to North Coast Harbor and the Rock and Roll Hall of Fame; pedestrians previously shared the roadway with cars; officials call it a critical missing link in the Cleveland Lakefront Bikeway
  3. Mandel Community Trail — Cleveland Metroparks · web · checked Oct 14, 2026
    Supports: Mandel Community Trail is a portion of the Cleveland Lakefront Bikeway between E. 9th St and MLK Jr. Blvd along North Marginal Road; new 2.7-mile off-road paved segment E. 9th to E. 55th managed by Cuyahoga County Department of Public Works with the City of Cleveland and Metroparks; connects to existing bikeway E. 55th to MLK Jr. Blvd; 1.3 miles of improvements (lighting, surface repairs, ADA crosswalks, wayfinding) by Metroparks; opened September 22, 2026 as a continuous lighted, paved connection; $5 million Mandel Foundation gift and $5.6 million NOACA Carbon Reduction Program funds plus local match; Harrison Dillard Bikeway runs south from Gordon Park to University Circle
  4. Cleveland Lakefront Bikeway — TrailLink · web · checked Oct 14, 2026
    Supports: 15.13 miles; endpoints Edgewater Park and Wildwood Park; on-road sections with a signed route; connection to the Cleveland Foundation Centennial Lake Link Trail downtown

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.