Clinton River Park Main Trail
Greenway in Michigan
Runs through Sterling Heights · Macomb County
Conditions now
Loading the weather near Sterling Heights…
Forecast by the National Weather Service for Sterling Heights · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Clinton River Park Main Trail is a mapped section of about 1.5 miles of paved path in Macomb County, Michigan, in the corridor of the Clinton River Park Trail. TrailLink describes that parent trail as 10.2 miles of asphalt along the east bank of the Clinton River, from River Bends Park at 5700 22 Mile Road in Shelby Township to 39850 Edison Street in Sterling Heights. Macomb County lists the trails at Dodge Park in Sterling Heights as asphalt and natural, and says the Clinton River Trail there runs parallel to the waterway. The name "Main Trail" appears in OpenStreetMap; no manager page fetched uses it.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
70% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Mt Clemens Ang Base, 15.4 km from the trail's middle, 6 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 34 44 56 68 78 82 80 73 60 48 36 Low °F 18 18 26 36 47 57 62 61 53 42 32 24 Precipitation, in 2.2 1.8 2.5 3.4 3.6 3.3 3.8 3.7 3.2 2.8 2.6 2.2 Snow, in 10.6 8.5 5.2 0.7 0 0 0 0 0 0 1.3 5.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1908 Rochester sheet (1:62,500); the 1952 Warren sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Stony to MetroBeach Trail within 0.2 mi · 16.1 mi, paved
- Clinton River Hike and Bike Trail 2.4 mi away · 2.6 mi, paved
- River Bends South Trail 4.2 mi away · 2.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Dodge Park - Macomb County · organization · checked Oct 18, 2026 Supports: Dodge Park in Sterling Heights; asphalt and natural trails; Clinton River Trail runs parallel to the waterway
- Clinton River Park Trail - Macomb County | Michigan Trails | TrailLink · web · checked Oct 18, 2026 Supports: 10.2 miles, asphalt, east bank, end points River Bends Park and 39850 Edison St
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.