Clinton River Spillway Trail
Greenway in Michigan · OpenStreetMap relation
Runs through Clinton Township (Macomb County) and Harrison Township · Macomb County
Conditions now
Loading the weather near Mount Clemens…
Forecast by the National Weather Service for Mount Clemens · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Ballard Street mile 2.2 · restrooms directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Clinton River Spillway Trail, also called the Clinton River Spillway Bike Path, is a paved path beside the Clinton River Spillway in Macomb County, Michigan, between Shady Side Park near Mount Clemens and Lake St. Clair near Velger Boat Harbor in Harrison Township. TrailLink lists it as 2 miles of asphalt; the route mapped here is about 2.5 miles. The spillway is a 2.5-mile, 80-foot-wide channel that the U.S. Army Corps of Engineers built in 1950 to control flooding in Mount Clemens and Clinton and Harrison townships. It runs southeast from an overflow weir at Gratiot Avenue to the lake, and the Macomb County Public Works Office completed habitat work in the channel in 2019.
The trail runs through a mostly wooded corridor above and parallel to the spillway. At the east end it follows the north bank; at the west end it follows the south bank before crossing again at Shady Side Park. It passes under Interstate 94 and 16 Mile Road. Macomb County lists the path among the connections of the Freedom Trail, which runs nearly 10 miles beside 16 Mile Road and Metro Parkway to Lake St. Clair Metropark. Parking is available at Shady Side Park, at Barbara Street and Shadyside Drive, and at a small park at 26784 Ballard Street.
The Macomb County Department of Roads' list of planned 2026 projects includes pathway improvements on the Clinton River Spillway Trail at Shady Side Park in Clinton Township, estimated at $728,635, and a Jefferson Avenue Spillway Pedestrian Bridge in Harrison Township, estimated at $3,977,917.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Mt Clemens Ang Base, 5.6 km from the trail's middle, 1 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 34 44 56 68 78 82 80 73 60 48 36 Low °F 18 18 26 36 47 57 62 61 53 42 32 24 Precipitation, in 2.2 1.8 2.5 3.4 3.6 3.3 3.8 3.7 3.2 2.8 2.6 2.2 Snow, in 10.6 8.5 5.2 0.7 0 0 0 0 0 0 1.3 5.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1912 Mt Clemens sheet (1:62,500); the 1952 Mt Clemens East sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Stony to MetroBeach Trail within 0.2 mi · 16.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 2738458, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Remediation and Restoration Projects for Clinton River AOC | US EPA · government source · checked Oct 15, 2026 Supports: spillway 2.5 miles long and 80 feet wide, built by the Army Corps of Engineers in 1950 for flood control in Mount Clemens and Clinton and Harrison townships; runs southeast from the overflow weir at Gratiot Avenue to Lake St. Clair; Macomb County Public Works habitat work completed in 2019
- Macomb Work Zone - Macomb County · organization · checked Oct 15, 2026 Supports: 2026 planned projects: Clinton River Spillway Trail (Shady Side Park) Pathway Improvements, Clinton Township, $728,635; Jefferson Avenue Spillway Pedestrian Bridge, Harrison Township, $3,977,917
- Freedom Trail - Macomb County · organization · checked Oct 15, 2026 Supports: Freedom Trail, nearly 10 miles parallel to 16 Mile Road/Metro Parkway to Lake St. Clair Metropark, connects to the Clinton River Spillway Bike Path
- #MITrailsWeek: Clinton River Spillway Path — A Healthier Michigan · organization · checked Oct 15, 2026 Supports: path passes under 16 Mile Road in Harrison Township
- Clinton River Spillway Bike Path | Michigan Trails | TrailLink · web · checked Oct 15, 2026 Supports: 2 miles, asphalt; end points Shady Side Park (Mt. Clemens) and Lake St. Clair near Velger Boat Harbor; wooded corridor above and parallel to the spillway; north bank at east end, south bank at west end, crossing at Shady Side Park; passes under I-94; parking at Shady Side Park (Barbara St. and Shadyside Dr.) and 26784 Ballard Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.