States › Massachusetts

Connecticut River Walk and Bikeway

Greenway in Massachusetts · OpenStreetMap relation

Runs through Springfield · Hampden County

Conditions now

Loading the weather near Springfield…

Forecast by the National Weather Service for Springfield · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.7 mi 6.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Hanover Street mile 0.6 directions to trailhead 1
  2. Parking at West Street mile 2.5 directions to trailhead 2
  3. Parking at Riverside Road mile 2.6 directions to trailhead 3
  4. Parking at Riverside Road mile 2.7 directions to trailhead 4
  5. Parking at Sanderson Street mile 3.1 directions to trailhead 5

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Connecticut River Walk and Bikeway, West Springfield MA.jpg (opens in a new tab)
Connecticut River Walk and Bikeway, West Springfield MA.jpg · Photo: John Phelan · CC BY 4.0 · Wikimedia Commons

About this trail

The Connecticut River Walk and Bikeway is a paved path of 3.7 miles along the east bank of the Connecticut River in Springfield, Massachusetts, running from the South End Bridge north to Plainfield Street near the Chicopee line. It is the Springfield section of a planned 20-mile riverside corridor linking Agawam, Chicopee, Springfield, Holyoke and West Springfield; a 1.7-mile section in Agawam, from Borgatti Park north to School Street, is also open. The route runs through city-owned floodplain, cut off from most of the city by Interstate 91, an elevated highway built in the 1960s. It is not a rail trail, though it runs beside an active rail line.

The path was about 15 years old in 2018, when its full length reopened after a two-year closure while the Springfield Water and Sewer Commission repaired sewer pipes, manholes and outfall structures along the riverbank. Responsibility is divided: the city parks department mows the grass, the public works department maintains the paved path and a bridge over the railroad tracks, and the U.S. Army Corps of Engineers also has a role.

From the Riverfront Park entrance the path runs both north and south along the river's edge. Northward it passes the North End Bridge, the flood control dike beside the Brightwood neighborhood and the Baystate Medical facilities on Wason Street and Birnie Avenue; southward it passes Memorial Bridge, the Naismith Memorial Basketball Hall of Fame, reached by a footbridge, and the South End. City rules limit use to daylight hours, bar motorized vehicles, require pets on leashes of 6 feet or less and direct users to obey the pedestrian signal when crossing Route 20.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

31% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Westfield Barnes Municipal Airport, 11.2 km from the trail's middle, 64 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353847607280858375635140
Low °F161726354655615951393022
Precipitation, in2.82.63.44.13.74.44.23.74.64.73.53.6
Old maps

USGS topographic maps of the trail's middle go back to the 1886 Springfield sheet (1:62,500); the 1958 Springfield South sheet (1:24,000) shows the area at mid-century. Browse all 25 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9710644, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Connecticut River Walk and Bikeway, Springfield Section (brochure, September 2014) — City of Springfield Parks · government source · checked Oct 13, 2026
    Supports: 3.7 miles from the South End Bridge to Plainfield Street, Agawam section 1.7 miles from Borgatti Park to School Street, planned 20-mile corridor and towns, Riverfront Park entrance, North End Bridge, flood control dike, Brightwood, Baystate Medical, Memorial Bridge, Basketball Hall of Fame, rules (daylight hours, no motor vehicles, 6-foot leash, Route 20 crossing)
  3. Connecticut River Walk Park — Wikipedia · organization · checked Oct 13, 2026
    Supports: city-owned floodplain, I-91 built in the 1960s as a barrier, rail-with-trail beside an active line, footbridge at the Basketball Hall of Fame complex, 20-mile plan
  4. Connecticut River Walk and Bikeway reopens — WAMC (April 5, 2018) · organization · checked Oct 13, 2026
    Supports: path about 15 years old, two-year closure for Springfield Water and Sewer Commission work, reopening, divided responsibility among the parks department, public works and the Army Corps of Engineers

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.