States › New Hampshire

Cotton Valley Rail Trail

Rail-trail in New Hampshire · OpenStreetMap relation

Runs through Wolfeboro, Brookfield, Wakefield and Sanbornville · Carroll County

Conditions now

Loading the weather near Wolfeboro…

Forecast by the National Weather Service for Wolfeboro · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
12.0 mi 19.3 km1
On former railbed
2.9 mi 24%
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Railroad Avenue mile 0 directions to trailhead 1
  2. Parking at Central Avenue mile 0 directions to trailhead 2
  3. Parking at Railroad Avenue mile 0 directions to trailhead 3
  4. Parking at Railroad Avenue mile 0.1 directions to trailhead 4
  5. Parking at Railroad Avenue mile 0.2 directions to trailhead 5
  6. Parking at Silver Street mile 0.8 directions to trailhead 6
  7. Cotton Valley Rail Trail Parking mile 3.3 directions to Cotton Valley Rail Trail Parking
  8. Parking at Windy Hollow Road mile 11.1 directions to trailhead 8
  9. Parking at Meadow Street mile 12 directions to trailhead 9
  10. Parking at High Street mile 12 directions to trailhead 10

Plan your visit

Links checked Oct 18, 2026. Sources: New Hampshire State Parks.

Cotton Valley Rail Trail, Brookfield NH.jpg (opens in a new tab)
Cotton Valley Rail Trail, Brookfield NH.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Cotton Valley Rail Trail is a 12-mile rail trail in eastern New Hampshire, running from Wolfeboro through Brookfield to Sanbornville in Wakefield on a state-owned railroad right-of-way. The state Bureau of Trails maintains it with the Cotton Valley Trail Committee, the Cotton Valley Rail Trail Club, the Wolfeboro Snowmobile Club and the Seven Lakes Snowmobile Club. It follows the Wolfeboro Railroad, a company founded on July 1, 1868, whose 12-mile line from the Portsmouth, Great Falls and Conway Railroad at Sanbornville opened on August 19, 1872. Passenger-only trains ended in 1936 and mixed trains about 1950; after freight ceased, tourist trains ran from 1972 to 1985, when the State of New Hampshire bought the line. The trail committee and the rail club formed in the early 1990s, and the full 12-mile trail was completed in 2017.

The trail starts at the former railroad depot on Depot Street in Wolfeboro, near the Back Bay of Lake Winnipesaukee, and ends at Turntable Park in Sanbornville, which keeps a restored railroad turntable. It crosses two causeways along Lake Wentworth and Crescent Lake. Fernald Station, where the trail meets Route 109 about 3 miles out, is the rail club's headquarters, and a renovated station house stands at Cotton Valley, near the 6-mile mark. Parking is at the Wolfeboro depot, Fernald Station, Cotton Valley Road, Clark Road in Brookfield and Turntable Park.

The rails remain in place: it is one of three state-managed trails where rail car clubs run motorcars on the track. Bicyclists must walk across the rails, ties and transition platforms. The surface is mostly hard-packed, with dirt and gravel stretches. In April 2024 a storm brought down more than 1,000 trees across the trail, which the Bureau of Trails cleared within a week, and in June 2024 the state began building a 500-foot section to replace one washed out in 2023.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 62% of this route as an abandoned rail line and 25% as a trail on former railroad right-of-way.

Wolfeboro Branch. From New Hampshire Railroads (NH GRANIT / NHDOT).

Shade

66% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lakeport 2, 29.4 km from the trail's middle, 49 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303442566877828173604736
Low °F121221334455605952403020
Precipitation, in3.12.93.43.63.54.44.63.93.84.83.73.9
Snow, in18.816.99.41.6000000.32.112.8
Old maps

USGS topographic maps of the trail's middle go back to the 1928 Wolfeboro sheet (1:62,500); the 1958 Wolfeboro sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Wolfeboro, c. 1907–1915: Cotton Valley station and track
Wolfeboro, c. 1907–1915: Cotton Valley station and trackPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

  • One rider in 2025 reported minor road crossings early on and at least one roughly four-mile stretch free of them, naming the Route 16 crossing near Wakefield as the one real annoyance. r/newhampshire, Jun 2025
  • One rider in 2025 called the surface from downtown Wolfeboro out past Crescent and Wentworth lakes flat, packed gravel that suits a stroller. r/newhampshire, Sep 2025
2 Reddit threads about this trail, Jun 2025 to Sep 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9740543, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Cotton Valley Rail Trail — New Hampshire State Parks · government source · checked Oct 13, 2026
    Supports: 12 mi from Depot Street (Wolfeboro) to Turntable Park (Wakefield), towns, causeways along Lake Wentworth and Crescent Lake, parking areas, Bureau of Trails and partner groups, rails intact and one of three DNCR trails used by rail car clubs, walk bikes across rails, ties and transition platforms, permitted uses
  3. Wolfeboro Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: company founded July 1, 1868; 12-mile line from the Portsmouth, Great Falls and Conway at Sanbornville opened August 19, 1872; passenger-only trains ended 1936, mixed trains until about 1950; tourist operations 1972–1985; state purchase 1985; right-of-way became the Cotton Valley Rail Trail with rails in place
  4. Cotton Valley Rail Trail — Cotton Valley Trail Committee · organization · checked Oct 13, 2026
    Supports: trail within a state rail right-of-way, committee and rail club formed in the early 1990s, 12-mile trail completed 2017, Cotton Valley Station House at the 6-mile mark renovated 2024, April 2024 storm downing over 1,000 trees cleared within a week, June 2024 construction of a 500-foot section replacing a 2023 washout
  5. Outdoor adventures: Chugging along between Wolfeboro and Wakefield — Concord Monitor (Aug. 15, 2018) · press · checked Oct 13, 2026
    Supports: Wolfeboro depot across from Back Bay, restored turntable at Sanbornville's Turntable Park, Fernald Station on Route 109 about 3 miles in as rail club headquarters, mostly hard-packed surface with dirt and gravel stretches, motorcars

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.