County Highway CB Trail
Greenway in Wisconsin · OpenStreetMap relation
Runs through Greenville, Grand Chute, Fox Crossing, Neenah and Town of Neenah · Outagamie and Winnebago counties
Conditions now
Loading the weather near Fox Crossing…
Forecast by the National Weather Service for Fox Crossing · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at County Road CB mile 0.3 directions to trailhead 1
- Parking at Wally Way mile 0.3 directions to trailhead 2
- Parking at Wally Way mile 0.4 directions to trailhead 3
- Parking at Design Drive mile 0.7 directions to trailhead 4
- Parking at Atlantis Drive mile 1.6 directions to trailhead 5
- Parking at County Road CB mile 1.7 directions to trailhead 6
- Cell Phone Lot mile 2 directions to Cell Phone Lot
- Taxi/Rideshare Staging mile 2.2 directions to Taxi/Rideshare Staging
- Parking at Greenville Center Drive mile 2.6 directions to trailhead 9
- Parking at South Mayflower Drive mile 3 directions to trailhead 10
- Parking at Municipal Drive mile 4.5 directions to trailhead 11
- Parking at Municipal Drive mile 4.5 directions to trailhead 12
- Parking at Municipal Drive mile 4.5 directions to trailhead 13
- Parking at County Road CB mile 6.6 directions to trailhead 14
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The County Highway CB Trail, known locally as the CB Trail, is a paved path of about 8.9 miles beside County Road CB on the western side of the Fox Cities in Wisconsin. It runs from the Highway 15 area in the Town of Greenville in Outagamie County south through the Village of Fox Crossing toward Neenah in Winnebago County. It is a roadside path, not a rail-trail.
In December 2018 Greenville's town administrator, Joel Gregozeski, said a new segment from Highway 96 north to Highway 15 would extend the trail so that it ran from Highway 15 south to Winneconne Avenue in Neenah. Work on that stretch began in August 2019. It joined a short segment north of Highway 15 to the longer main trail, which already ran from Highway 96 south into the Neenah area. The town received a federal grant toward the cost and hoped to finish by mid-October 2019.
Fox Crossing's trail chart lists about 3 miles of the County CB trail within the village, between County Road BB and County Road II, with an asphalt and concrete surface. The Friendship Trail reaches County Road CB from both sides: the village lists 2.5 miles from the Trestle Trail to County Road CB and 1.5 miles from County Road CB to Clayton Avenue. The village calls the Fox Cities Trestle–Friendship Trail the backbone of its trail system and says it will eventually connect Manitowoc with Stevens Point. The village clears snow from its trails after snowfalls of 2 inches or more, usually within 24 hours, but does not salt them.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Appleton, 7 km from the trail's middle, 1 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 29 41 54 67 77 82 79 72 58 43 31 Low °F 10 12 22 34 46 57 61 60 51 39 28 17 Precipitation, in 1.4 1.1 1.9 3.2 3.6 4.7 3.8 3.6 3.2 2.8 2.1 1.8 Snow, in 12.6 11.2 7.2 4 0.1 0 0 0 0 0.3 2.4 11.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1911 Neenah sheet (1:62,500); the 1955 Neenah sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesFox Crossing Trail System — Village of Fox Crossing
- RedditSearch Reddit: r/wisconsin
Nearby trails
- Fox Cities Paper Trail within 0.2 mi · 10.7 mi, paved
- County CA Trail within 0.2 mi · 1.8 mi, paved
- American Drive Trail within 0.2 mi · 4.4 mi, paved
- Friendship State Trail within 0.2 mi · 16.1 mi, paved
- Shady Lane Trail within 0.2 mi · 1.4 mi, paved
- Cold Spring Road Trail 0.5 mi away · 1.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 5760721, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Fox Crossing Trail Information (trail chart) — Village of Fox Crossing · government source · checked Oct 15, 2026 Supports: County CB trail, CTH BB to CTH II, 3.0 miles, asphalt/concrete; Friendship Trail segments Trestle Trail to CTH CB (2.5 miles) and CTH CB to Clayton Ave. (1.5 miles)
- Fox Crossing Trail System — Village of Fox Crossing · government source · checked Oct 15, 2026 Supports: Fox Cities Trestle–Friendship Trail as the backbone of the village system, to connect Manitowoc with Stevens Point; snow removal after 2 inches, generally within 24 hours; trails not salted
- CB Trail could be extended in 2019 — WHBY (December 20, 2018) · web · checked Oct 15, 2026 Supports: CB Trail name; Town of Greenville administrator Joel Gregozeski; new segment from Highway 96 north to Highway 15; trail to stretch from Highway 15 south to Winneconne Avenue in Neenah
- Work starts on CB Trail expansion — WHBY (August 19, 2019) · web · checked Oct 15, 2026 Supports: work began August 2019 on the stretch from Highway 96 north to the Highway 15 area; it connects a segment north of Highway 15 with the main trail from Highway 96 south into the Neenah area; federal grant; mid-October completion hoped for
- County Highway CB Trail — OpenStreetMap relation 5760721 · web · checked Oct 15, 2026 Supports: about 8.9 miles mapped along County Road CB; Greenville (Outagamie County), Fox Crossing and Neenah (Winnebago County) locations by reverse geocoding of the mapped line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.