Cowboy Trail
Rail-trail in Nebraska · OpenStreetMap relation
Runs through Rushville, Valentine, Ainsworth, Bassett, O'Neill, Ewing, Neligh, Norfolk and 16 more · Dawes, Sheridan, Cherry, Brown, Rock, Holt, Antelope and Madison counties
All 24 towns and places
Hay Springs, Rushville, Clinton, Gordon, Valentine, Wood Lake, Johnstown, Ainsworth, Long Pine, Bassett, Newport, Stuart, Atkinson, Emmet, O'Neill, Inman, Ewing, Clearwater, Neligh, Oakdale, Tilden, Meadow Grove, Battle Creek and Norfolk
Partly closed: Sections closed: Hohman St in Oakdale to 525th Ave in Neligh, and Neligh to Clearwater, because the bridge over the Elkhorn is out. Use the HWY 275 detour. An alternate route along HWY 275 is also listed for 516.5 Ave to 519 Ave. From outdoornebraska.gov, checked Nov 25.
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Cowboy Trail is a rail trail in northern Nebraska. It is a multi-use recreational trail suitable for bicycling, walking and horseback riding. It occupies an abandoned Chicago and North Western Railway corridor. When complete, the trail will run from Chadron to Norfolk, a length of 321 miles (517 km), making it the longest rails-to-trails conversion in the United States. It is Nebraska's first state recreational trail. The trail runs across the Outback area of Nebraska.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 3.9 directions to trailhead 1
- Parking at East 2nd Street mile 153 directions to trailhead 2
- Parking at South 49th Street mile 184 directions to trailhead 3
- Parking mile 187.5 · restrooms directions to trailhead 4
Plan your visit
- National Recreation TrailDesignated in 2001 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Cowboy Trail, formally the Cowboy Recreation and Nature Trail, is a rail-trail across northern Nebraska for bicycling, walking and horseback riding. It was Nebraska's first state recreational trail, and the Nebraska Game and Parks Commission develops and maintains it. The trail follows the "Cowboy Line", built by the Fremont, Elkhorn and Missouri Valley Railroad, a predecessor of the Chicago and North Western, in the late 1870s and early 1880s. The Chicago and North Western abandoned the line west of Norfolk in 1992. In 1993 the Rails-to-Trails Conservancy bought the right-of-way for $6.2 million under federal railbanking law and donated it to the state. The planned route from Norfolk to Chadron is about 321 miles.
The main section runs 195 miles from Norfolk west to Valentine. Its last segment was finished in the summer of 2009. Towns along it include Norfolk, Neligh, O'Neill, Atkinson, Bassett, Long Pine, Ainsworth and Valentine. The trail is part of the Great American Rail-Trail. About 90 miles west of Valentine, a separate 15-mile section is open between Gordon and Rushville. The corridor between Valentine and Gordon has not been developed, and the BikeCowboyTrail.com guide points riders to U.S. Highway 20 for that stretch. As of April 2026, Game and Parks planned to finish surfacing from Rushville west to Redfern Road, about 6 miles east of Chadron, by the end of 2026 or early 2027. The Northwest Nebraska Trails Association has surfaced the first mile of a Cowboy Trail Connection out of Chadron and cut a dirt singletrack toward the state trail.
The finished sections are crushed limestone. The line has 221 bridges, all converted for trail use. The bridge over the Niobrara River near Valentine is a quarter-mile long and 148 feet high, and the Long Pine Creek bridge at Long Pine is 595 feet long and 145 feet high. U.S. Highways 20 and 275 run beside the trail for most of its length.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 64% of this route as a trail on former railroad right-of-way.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Ainsworth, 12.8 km from the trail's middle, 33 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 40 51 61 71 81 88 86 78 64 50 38 Low °F 15 18 26 36 47 57 63 61 52 39 27 18 Precipitation, in 0.4 0.6 1.2 2.6 3.8 3.8 3 2.8 2.6 1.7 0.6 0.6 Snow, in 4.2 7.3 6 6.6 0.3 0 0 0 0 1.8 4.1 5.5 - On the National Register
- Neligh Mill (Boundary Increase), Neligh · historic district, listed 2010 · nomination file for Neligh Mill (Boundary Increase)
- Neligh Mill, Neligh · building, listed 1969 · nomination file for Neligh Mill
- Neligh Mill Elevators (Boundary Increase), Neligh · building, listed 1983 · nomination file for Neligh Mill Elevators (Boundary Increase)
- Kester Planing Mill, Neligh · building, listed 2014
- Downtown Neligh Historic District, Neligh · historic district, listed 2017
- Old maps
USGS topographic maps of the trail's middle go back to the 1954 Long Pine sheet (1:24,000); the 1955 O'Neill sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders posting in 2024 and 2026 reported goathead punctures, one replacing both tires; a rider on tubeless tires said three seasons passed without flats, and advised staying off the trail edges. r/Nebraska, Nov 2024 · r/Nebraska, Oct 2026
- Riders in 2025 and 2026 said much of the trail runs beside the highway; some preferred the parallel road's wide shoulder to the trail, and one called parts of it unrideable. r/bikepacking, Feb 2025 · r/bicycletouring, Nov 2025 · r/Nebraska, Oct 2026
- In October 2026, two people praised a bar in Stuart for food; a rider covering about 110 miles reported few water refills, little shade near Valentine and limited small-town food. r/Nebraska, Oct 2026
- Visitors in 2024 described the Niobrara River bridge as an easy outing from Valentine: two rented bikes at kiosks in town, and another suggested parking east of the bridge and walking out. r/Nebraska, Mar 2024 · r/Nebraska, Jun 2024
10 Reddit threads about this trail, Mar 2024 to Oct 2026
- Rode the cowboy trail r/Nebraska · Oct 2026 · 28 comments
- Someday, We’ll Bike on a Path Across America. But First, Nebraska. r/Nebraska · Nov 2024 · 10 comments
- OR->DE or DE->OR? (Which direction to choose?) r/bicycletouring · Nov 2025 · 54 comments
- Across United States of America, Coast to coast, this summer of 2025 r/bikepacking · Feb 2025 · 23 comments
- Valentine, NE on the 4th of July r/Nebraska · Jun 2024 · 28 comments
- Road trip from Denver to Fargo, should we stop in Valentine or elsewhere? r/Nebraska · Mar 2024 · 46 comments
- What is the most hostile city for bikers/pedestrians you have ever been? r/fuckcars · Jan 2026 · 110 comments
- First Test! r/bicycletouring · Sep 2025 · 5 comments
- Moving To Norfolk, What do I need to know? r/Nebraska · Nov 2024 · 36 comments
- How many people on gravel bikes actually ride on gravel? r/cycling · Sep 2024 · 159 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1912616, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Cowboy Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q5179558, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Cowboy Trail — Wikipedia · organization · checked Oct 18, 2026 Supports: uses (bicycling, walking, horseback riding); Nebraska's first state recreational trail; Game and Parks develops and maintains it; Fremont, Elkhorn and Missouri Valley construction late 1870s and early 1880s; abandoned west of Norfolk in 1992; 1993 Rails-to-Trails Conservancy purchase for $6.2 million under railbanking and donation to the state; planned Chadron-Norfolk length of 321 miles; Valentine-Norfolk segment finished summer 2009 for 195 continuous miles; Norfolk, Neligh, O'Neill, Ainsworth, Valentine; crushed limestone; 221 bridges converted; Niobrara and Long Pine Creek bridge dimensions; parallel US 20 and US 275
- Cowboy Trail — The Cowboy Trail of Nebraska (BikeCowboyTrail.com) · web · checked Oct 18, 2026 Supports: 195 miles Norfolk to Valentine; "Cowboy Line" name; separate 15-mile Gordon-Rushville section about 90 miles west of Valentine; Valentine-Gordon connection not developed, Highway 20 as the option; part of the Great American Rail-Trail; horseback riding allowed
- Cowboy Trail Forum — BikeCowboyTrail.com · web · checked Oct 18, 2026 Supports: towns with listed services along the trail: Ainsworth, Atkinson, Bassett
- Community celebrates new trail in Chadron — Sandhills News Channel Nebraska (April 29, 2026) · web · checked Oct 18, 2026 Supports: formal name Cowboy Recreation and Nature Trail; Game and Parks plan to finish surfacing from Rushville to Redfern Road, about 6 miles east of Chadron, by end of 2026 or early 2027; Northwest Nebraska Trails Association's first surfaced mile of the Cowboy Trail Connection and dirt singletrack toward the state trail; part of the Great American Rail-Trail
- Cowboy Trail — OpenStreetMap relation 1912616 · web · checked Oct 18, 2026 Supports: map record includes unopened, unimproved corridor west of Valentine and the improved section near Gordon (route note)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.