States › Pennsylvania

Cresheim Rail Trail

Rail-trail in Pennsylvania

Runs through Philadelphia · Philadelphia County

Conditions now

Loading the weather near Philadelphia…

Forecast by the National Weather Service for Philadelphia · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.7 mi 1.1 km1
On former railbed
0.6 mi 84%
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Cresheim Valley Drive mile 0 directions to trailhead 1
  2. Parking mile 0 directions to trailhead 2
  3. Parking at Cresheim Valley Drive mile 0 directions to trailhead 3
  4. Parking at Cresheim Valley Drive mile 0 directions to trailhead 4
  5. Parking at Germantown Avenue mile 0.1 directions to trailhead 5
Pennsylvania School for the Deaf, beside the trail (opens in a new tab)
Pennsylvania School for the Deaf, beside the trail · Photo: Smallbones · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Cresheim Rail Trail is the rail-trail section of the Cresheim Trail in Philadelphia, between Germantown and Stenton Avenues. It follows the Pennsylvania Railroad's Fort Washington, or Cresheim, Branch, opened in 1891 and last used for passenger service in the 1950s. PECO owns the corridor; in 2018 this section was brought into an agreement between PECO and the City of Philadelphia, through legislation from Councilmember Cindy Bass, with the Friends of the Cresheim Trail as stewardship partner. The Friends, who have built natural-surface trails for hiking and mountain biking since 2012, are working on a 5-mile rail trail, mostly within two former railroad rights-of-way, to link Wissahickon Valley Park with Fort Washington State Park in Montgomery County as part of the Circuit Trails.

Volunteers opened the corridor in March 2024 as a rough first version, with a parallel natural-surface earthen trail, connecting the existing trail network at Germantown Avenue with Stenton Avenue. The route starts at a ramp at Germantown Avenue, has a side connection into Wissahickon East, and passes through a tunnel under SEPTA's Chestnut Hill East Line built by the Reading Railroad in the 1930s; at Stenton Avenue a turnaround loops back through woods beside Cresheim Valley Drive.

Formal planning and design of roughly one mile of rail bed began in 2025, backed by a $100,000 DCNR grant matching a DVRPC grant and by a William Penn Foundation capacity-building grant. The finished trail is to be 10 feet wide, accessible and surfaced with crushed gravel; a tunnel under Stenton Avenue is not yet included. SEPTA plans to rehabilitate the 1890s railroad bridge over Germantown Avenue for shared use by its equipment and trail users, on a timeline still to be set, and a water department project may close the trail's upper end for three to six months.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

Shade

56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Phila Franklin Inst, 12.4 km from the trail's middle, 80 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F424554667685898780685646
Low °F283036465666717063514133
Precipitation, in3.63.34.544.14.84.854.94.23.44.3
Snow, in6.4420.10000000.13.5
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Germantown sheet (1:62,500); the 1952 Germantown sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Big Volunteer Workday Sat 3/16 — The Friends of the Cresheim Trail (February 29, 2024) · organization · checked Oct 14, 2026
    Supports: Fort Washington (Cresheim) Branch alignment, opened 1891, passenger service to the 1950s, 2018 PECO–City agreement with FOCT as stewardship partner via Councilmember Cindy Bass, ramp at Germantown Avenue, side connection to Wissahickon East, Reading Railroad tunnel under the Chestnut Hill East Line (1930s), Stenton turnaround and loop beside Cresheim Valley Drive
  3. Philadelphia and Montgomery County Communities Unite to Extend Cresheim Trail — The Friends of the Cresheim Trail (March 18, 2024) · organization · checked Oct 14, 2026
    Supports: corridor opened with a parallel natural-surface earthen trail connecting Germantown Avenue with Stenton Avenue; multi-use trail sections
  4. Cresheim Trail: A rewarding 2024, a promising 2025 — The Friends of the Cresheim Trail (December 31, 2024) · organization · checked Oct 14, 2026
    Supports: opened March 2024 as a 'rough draft', planning and design of roughly one mile from just south of Germantown Avenue to Stenton Avenue beginning 2025, $100K DCNR grant matching a DVRPC grant
  5. Cresheim Trail: 2025 in review, 2026 in preview — The Friends of the Cresheim Trail (December 31, 2025) · organization · checked Oct 14, 2026
    Supports: William Penn Foundation capacity-building grant, Circuit Trails standards (10 feet wide, accessible, crushed gravel), no Stenton Avenue tunnel in current planning, SEPTA rehabilitation of the 1890s Germantown Avenue bridge for shared use with timeline to be determined, PECO owns the corridor, possible 3–6 month closure of the upper end for a water department project
  6. The Friends of the Cresheim Trail · organization · checked Oct 14, 2026
    Supports: 5-mile rail trail mostly within two former railroad rights-of-way, Wissahickon Valley Park to Fort Washington State Park, natural-surface trails for hiking and mountain biking since 2012, Circuit Trails

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.