States › California

Cross-Alameda Trail

Greenway in California · OpenStreetMap relation

Runs through Alameda · Alameda County

Conditions now

Loading the weather near Alameda…

Forecast by the National Weather Service for Alameda · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
3.9 mi 6.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Ferry Point mile 0.1 · water directions to trailhead 1
  2. Parking at West Atlantic Avenue mile 0.4 directions to trailhead 2
  3. Parking at Skyhawk Street mile 0.6 directions to trailhead 3
  4. Parking at Ralph Appezzato Memorial Parkway mile 0.6 directions to trailhead 4
  5. Parking at Main Street mile 0.6 directions to trailhead 5
  6. Parking at Poggi Street mile 1 directions to trailhead 6
  7. Parking at Ralph Appezzato Memorial Parkway mile 1.1 directions to trailhead 7
  8. Parking at Eagle Avenue mile 1.4 directions to trailhead 8
  9. Parking at Eagle Avenue mile 1.4 directions to trailhead 9
  10. Parking at Atlantic Avenue mile 1.5 directions to trailhead 10
  11. Parking at Atlantic Avenue mile 1.5 directions to trailhead 11
  12. Parking at Webster Street mile 1.5 directions to trailhead 12
  13. Parking at Atlantic Avenue mile 1.5 directions to trailhead 13
  14. Parking at Atlantic Avenue mile 1.7 directions to trailhead 14
  15. Parking at Eagle Avenue mile 2.3 directions to trailhead 15
  16. Parking at Clement Aveue mile 2.3 directions to trailhead 16
  17. Parking at Clement Avenue mile 2.8 directions to trailhead 17
  18. Parking at Schiller Street mile 3 directions to trailhead 18
  19. Parking at Clement Avenue mile 3.4 directions to trailhead 19
  20. Parking at Clement Avenue mile 3.4 directions to trailhead 20
  21. Parking at Clement Avenue mile 3.7 directions to trailhead 21
  22. Salvation Army Family Store Parking mile 3.8 directions to Salvation Army Family Store Parking
  23. Parking at Blanding Avenue mile 3.8 directions to trailhead 23
  24. Parking at Clement Avenue mile 3.8 directions to trailhead 24
  25. Parking at Eagle Avenue mile 3.8 directions to trailhead 25
  26. Parking at Broadway mile 3.9 directions to trailhead 26

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Cross-Alameda Trail (opens in a new tab)
Photo: avimentor · CC BY-SA 4.0 · Mapillary

About this trail

The Cross Alameda Trail is an east-west bikeway across the island city of Alameda, California, planned by the city as a continuous route of separated two-way bike lanes and paved paths from Seaplane Lagoon at Alameda Point to the Miller-Sweeney (Fruitvale) Bridge to Oakland. A local advocate described it in 2019 as more than four miles of protected route. Along Clement Avenue it follows the former Alameda Belt Line, a railroad incorporated in 1925 to take over track the city had laid on Clement Avenue in 1918. Jointly owned by the Western Pacific and the Santa Fe, the line last ran regular service in 1998, carried Union Pacific trains to one shipper until late 2001, and was formally abandoned in 2012; after its land was sold to a developer in 1999, the city won the right in court to buy it back for a public park.

The trail has opened in stages. A path through Jean Sweeney Open Space Park opened in December 2018. On October 29, 2024, the city opened 0.7 miles of two-way bike lanes on the north side of Clement Avenue between Grand Street and Broadway, protected by parked cars and concrete curbs, with a bike signal at Park Street; the work removed railroad tracks, and the segment connects at Willow Street to the existing section along the Northern Waterfront. It brought the trail to about 90 percent complete.

Still under way then were a segment across the former Pennzoil property between Hibbard and Grand streets and the Clement Avenue and Tilden Way segment with a roundabout at Blanding Avenue, Tilden Way and Fernside Boulevard, funded in part by a $2.1 million BART grant; both were expected in 2025. Separate walking and cycling crossings of the estuary are a long-term plan. This record maps about 3.9 miles of asphalt and concrete cycleway, from Poggi Street and West Atlantic Avenue east to Tilden Way.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Oakland Museum, 2.1 km from the trail's middle, 3 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F606265676972727375736660
Low °F454749505355575857554945
Precipitation, in4.34.33.21.40.80.200.10.11.12.44.7
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1895 San Francisco sheet (1:62,500); the 1959 Oakland West sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Cross-Alameda Trail (opens in a new tab)
  1. 360° view 1 of 4, photo by avimentor
  2. 360° view 2 of 4, photo by avimentor
  3. 360° view 3 of 4, photo by avimentor
  4. 360° view 4 of 4, photo by avimentor
360° panorama · Photo: avimentor · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11630010, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Alameda Belt Line — Wikipedia · organization · checked Oct 16, 2026
    Supports: incorporated January 12, 1925 to take over track the city built on Clement Avenue in 1918, joint Western Pacific and Santa Fe ownership, last operated 1998, Union Pacific trains to one shipper until late 2001, land sold to a developer January 28, 1999, city's court-won right to repurchase for a public park, formally abandoned 2012
  4. Ribbon-Cutting Unveils New Segment of Cross Alameda Trail — Alameda Post (October 31, 2024) · press · checked Oct 16, 2026
    Supports: route from Seaplane Lagoon to the Miller-Sweeney (Fruitvale) Bridge with separated two-way bike lanes and paved trails, October 29, 2024 opening of 0.7 miles on Clement Avenue between Grand Street and Broadway, north side, parked cars and concrete curbs, bike signal at Park Street, connection at Willow Street to the Northern Waterfront section, about 90 percent complete, Pennzoil segment between Hibbard and Grand, Tilden Way segment and roundabout at Blanding/Tilden/Fernside, $2.1 million BART grant, both expected in 2025, estuary crossing a long-term project
  5. Alameda Advocates Celebrate Clement Bike Heaven — Streetsblog California (November 1, 2024) · press · checked Oct 16, 2026
    Supports: two-way separated bikeway with concrete curb protection on Clement, railroad track removal between Grand Street and Broadway, 2019 description by an advocate of over four miles of protected route, Jean Sweeney Park path opened in 2018
  6. Bike Advocates Mark Progress on Both Sides of the Bay — Streetsblog San Francisco (September 18, 2019) · press · checked Oct 16, 2026
    Supports: Jean Sweeney Park opened December 2018 with the completed section of path through the park
  7. Cross-Alameda Trail (relation 11630010) — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: mapped extent of about 3.9 miles from Poggi Street and West Atlantic Avenue to Tilden Way, cycleway, asphalt and concrete surface

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.