Cross Marin Trail
Rail-trail in California · OpenStreetMap relation
Runs through Lagunitas-Forest Knolls · Marin County
Conditions now
Loading the weather near Lagunitas-Forest Knolls…
Forecast by the National Weather Service for Lagunitas-Forest Knolls · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Sir Francis Drake Boulevard mile 5.3 directions to trailhead 1
Plan your visit
- National Park ServiceIn Golden Gate National Recreation Area · park maps
Links checked Oct 18, 2026. Sources: National Park Service boundaries.
About this trail
The Cross Marin Trail is a 5.3-mile multi-use trail in western Marin County, California, that follows the right-of-way of the North Pacific Coast Railroad beside Lagunitas Creek. It is designated part of Golden Gate National Recreation Area; Point Reyes National Seashore manages the northern 1.5 miles and Samuel P. Taylor State Park the southern 3.8 miles. The railroad was built in the 1870s between Cazadero and a pier at Sausalito, where passengers changed to ferries for San Francisco. It passed near the Pioneer Paper Mill that Samuel Penfield Taylor had built on Lagunitas Creek in 1856, and Taylor opened the Camp Taylor resort beside the tracks, with a hotel and tent camping.
The northern trailhead is at Sir Francis Drake Boulevard and Platform Bridge Road, 1.8 miles east of Olema. Parking is along the old, largely decommissioned alignment of Sir Francis Drake Boulevard and on the west side of Platform Bridge Road, from which the Old Tocaloma/Platform Bridge, closed to cars, leads to the trail. From there the trail runs southeast along the creek with little change in elevation, through the state park, to its southern end on the park's southeast border near Lagunitas, meeting the Jewell Trail, the Shafter Grade and other park trails along the way.
The northern part, through the state park campground and headquarters area, is paved; the southern stretch in the woods toward Lagunitas is gravel and dirt. Bicycles, horses and leashed dogs are permitted, and cyclists are asked to yield to hikers and riders. The state park is open from 8 a.m. to sunset and charges a vehicle day-use fee, and creek access in the park is closed from December 1 to June 15 each year.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
67% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
San Rafael Civic Ctr, 17.8 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 57 61 65 68 72 78 81 81 81 75 65 57 Low °F 43 44 46 48 51 54 55 56 54 51 46 42 Precipitation, in 7.1 6.9 4.4 2 0.9 0.1 0 0.1 0.1 1.5 3.5 7.8 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- Tocaloma Bridge, Tocaloma · structure, listed 2018
- Old maps
USGS topographic maps of the trail's middle go back to the 1914 Petaluma sheet (1:62,500); the 1954 San Geronimo sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in 2024, 2025 and 2026 described pavement near the campground giving way to light gravel or flat dirt farther on, and said slick tires coped with it. r/BAbike, Aug 2024 · r/BAbike, Mar 2025 · r/BAbike, Feb 2026
- Riders in 2025 recommended the trail over the parallel road through the park because it avoids cars and has bathrooms and water refills; one rider preferred the road for its smoother pavement. r/BAbike, Mar 2025 · r/BAbike, Nov 2025
- Riders in 2025 and 2026 said the hike-and-bike campsites sit right beside the trail; one rider in February 2026 found the bike corral empty. r/bicycletouring, Jun 2025 · r/BAbike, Feb 2026 · r/bicycletouring, Oct 2026
- Riders in 2025 and 2026 used Platform Bridge Road from the trail's north end to reach Point Reyes-Petaluma Road and skip the Olema climb, and one called the road recently repaved and quiet. r/BAbike, Nov 2025 · r/BAbike, Mar 2026
9 Reddit threads about this trail, Feb 2024 to Oct 2026
- 75 mile route from SF to Point Reyes station and back? r/BAbike · Nov 2025 · 36 comments
- Cruising through Samuel P. Taylor this morning r/BAbike · Mar 2025 · 32 comments
- advice on route r/BAbike · Feb 2026 · 15 comments
- Pt reyes loop r/BAbike · Mar 2026 · 16 comments
- Cycling to Muir Woods r/BAbike · Aug 2024 · 23 comments
- Looking to to my first 1-2 night bike camp trip northern ca r/bicycletouring · Jun 2025 · 7 comments
- Crescent City to San Francisco is July? r/bicycletouring · Oct 2026 · 13 comments
- Bike rides to rivers / swim spots in / from the east bay? r/BAbike · Jul 2025 · 23 comments
- This California city will issue fines for off-leash dogs Pasadena, $500 r/California · Feb 2024 · 130 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Old Railroad Grade 4.9 mi away · 26.6 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9759209, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Cross Marin Trailhead — U.S. National Park Service · government source · checked Oct 16, 2026 Supports: 5.3-mile length; follows the North Pacific Coast Railroad right-of-way along Lagunitas Creek; little elevation change; part of Golden Gate National Recreation Area; northern 1.5 miles managed by Point Reyes National Seashore, southern 3.8 miles by the state park; southern terminus on the park's southeast border; connections with the Jewell Trail and Shafter Grade; northern trailhead at Sir Francis Drake Blvd. and Platform Bridge Road, 1.8 miles east of Olema; parking on the decommissioned old road and on Platform Bridge Road; Old Tocaloma/Platform Bridge closed to cars; bicycles, horses and leashed dogs permitted; cyclists yield to hikers and horseback riders
- Samuel P. Taylor State Park — California State Parks · government source · checked Oct 16, 2026 Supports: park hours 8 a.m. to sunset; vehicle day-use fee; creek access closed December 1 to June 15; dogs allowed on the Cross Marin Trail
- Samuel P. Taylor State Park — Wikipedia · organization · checked Oct 16, 2026 Supports: Pioneer Paper Mill built by Samuel Penfield Taylor in 1856; North Pacific Coast Railroad built in the 1870s between Cazadero and a Sausalito ferry pier; railroad passed near the mill; Camp Taylor resort with hotel and tent camping beside the tracks
- Cross Marin Trail — TrailLink · web · checked Oct 16, 2026 Supports: surface: paved through the state park and at the north end, gravel and dirt on the southern stretch toward Lagunitas; southern end on Sir Francis Drake Boulevard near Lagunitas
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.