Cross Vermont Trail
Rail-trail in Vermont · OpenStreetMap relation
Runs through Burlington, Williston, Waterbury, Berlin, Montpelier, Town of Marshfield, Groton, Town of Newbury and 12 more · Chittenden, Washington, Caledonia and Orange counties
All 20 towns and places
Burlington, South Burlington, Williston, Richmond, Bolton, Duxbury, Waterbury, Moretown, Middlesex, Berlin, Montpelier, East Montpelier, Plainfield, Village of Marshfield, Town of Marshfield, Peacham, Groton, Ryegate, Town of Newbury and Wells River
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Cross Vermont Trail is a project to build a multi-use, four season path across the width of Vermont; following the Winooski River and Wells River valleys. 87 miles are complete at this time, with a Mouth of River Loop route on the shore of Lake Champl
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at U.S. Route 302 mile 0 directions to trailhead 1
- Parking at U.S. Route 302 mile 1.7 directions to trailhead 2
- South Ryegate Park and Ride mile 4.2 directions to South Ryegate Park and Ride
- Ricker Pond State Park Parking mile 11.2 directions to Ricker Pond State Park Parking
- Ricker Pond State Park mile 12 directions to Ricker Pond State Park
- Parking mile 30.7 directions to trailhead 6
- Parking at Pioneer Center mile 33.3 directions to trailhead 7
- Parking at Main Street mile 34.4 · restrooms directions to trailhead 8
- Parking at Stone Cutters Way mile 34.4 directions to trailhead 9
- Parking at Stone Cutters Way mile 34.4 directions to trailhead 10
- Parking at Blanchard Court mile 34.4 directions to trailhead 11
- Accès vélo, rivière mile 42.5 directions to Accès vélo, rivière
- Parking at Arthur Buck River Access mile 42.5 directions to trailhead 13
- Parking at Batchelder Street mile 45.6 directions to trailhead 14
- Parking at State Drive mile 45.6 directions to trailhead 15
- Parking at State Drive mile 45.8 directions to trailhead 16
- Parking at State Drive mile 45.9 directions to trailhead 17
- Parking at State Drive mile 46 directions to trailhead 18
- Parking at River Road mile 46.7 directions to trailhead 19
- Duxbury Window Trail mile 53.3 directions to Duxbury Window Trail
- Parking mile 54.1 directions to trailhead 21
- Parking mile 54.4 directions to trailhead 22
- Parking at Wes White Hill mile 56.6 directions to trailhead 23
- Parking mile 58.2 directions to trailhead 24
- Parking mile 58.7 directions to trailhead 25
- Parking mile 58.7 directions to trailhead 26
- Parking mile 59 directions to trailhead 27
- Parking mile 65.7 directions to trailhead 28
- Parking at North Williston Road mile 67.2 directions to trailhead 29
- Parking mile 69.5 directions to trailhead 30
- Parking at Isham Circle mile 69.7 directions to trailhead 31
- Parking at Marshall Avenue mile 70.7 directions to trailhead 32
- Parking at Marshall Avenue mile 70.9 directions to trailhead 33
- Parking at Marshall Avenue mile 70.9 directions to trailhead 34
- Parking at Technology Park Way mile 72.2 directions to trailhead 35
- Parking at Shunpike Road mile 72.3 directions to trailhead 36
- Parking mile 72.6 directions to trailhead 37
- Parking mile 72.7 directions to trailhead 38
- Parking at Old Farm Road mile 72.9 directions to trailhead 39
- Parking at Kennedy Drive mile 73 directions to trailhead 40
- Parking at Dorset Street mile 74.2 directions to trailhead 41
- Parking at Kennedy Drive mile 74.3 directions to trailhead 42
- Parking at Dorset Street mile 74.6 directions to trailhead 43
- Parking at Swift Street mile 74.9 directions to trailhead 44
- Parking at Swift Street mile 75 directions to trailhead 45
- Parking at Ridgewood Drive mile 75 directions to trailhead 46
- Parking at Lexington Green mile 75.2 directions to trailhead 47
- Parking at Spear Street mile 75.5 directions to trailhead 48
- Parking at Swift Street mile 76.5 directions to trailhead 49
- Parking at Swift Street mile 76.5 directions to trailhead 50
- Parking at Queen City Park Road mile 76.9 directions to trailhead 51
- Parking at Queen City Park Road mile 76.9 directions to trailhead 52
- Parking at Kindness Court mile 77 directions to trailhead 53
- Parking at Church Street directions to trailhead 54
Plan your visit
- National Recreation TrailDesignated in 2003 National Recreation Trails database
- By trainAmtrak: Waterbury-Stowe, VT (WAB) 0.2 mi from the trail; Amtrak: Montpelier-Berlin, VT (MPR) 0.3 mi from the trail; Amtrak: Burlington, VT (BTN) 1.7 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
This entry maps about 8.3 miles of scattered off-road pieces of the Cross Vermont Trail, a planned 90-mile route from Burlington on Lake Champlain to Wells River on the Connecticut River, launched in 1992 and developed by the Cross Vermont Trail Association, a nonprofit incorporated in 1999. The pieces lie in Williston and Richmond, in East Montpelier and Plainfield, and in Groton State Forest, where the trail runs from Marshfield Pond to Ricker Pond on the bed of the Montpelier & Wells River Railroad (1873–1956) and crosses ponds and wetlands on a causeway. Much of the full route still uses roads, including Route 2 around a privately owned stretch of the railbed in Marshfield.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
49% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Montpelier 2, 9.6 km from the trail's middle, 21 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 28 31 40 53 67 76 82 80 73 58 45 32 Low °F 7 9 18 32 44 54 59 57 50 38 28 17 Precipitation, in 2.8 2.4 2.6 3.3 4.4 4.4 4.6 3.9 3.1 3.7 2.9 3.3 - On the National Register
- Middlesex--Winooski River Bridge, Middlesex · structure, listed 1991 · nomination file for Middlesex--Winooski River Bridge
- Bridge 31, Waterbury · structure, listed 2006 · nomination file for Bridge 31
- Winooski River Bridge, Richmond · structure, listed 1990 · nomination file for Winooski River Bridge
- Vermont State Hospital Historic District, Waterbury · historic district, listed 2016
- Waterbury Village Historic District, Waterbury · historic district, listed 1978 · nomination file for Waterbury Village Historic District
- Ricker Pond State Park, Groton · historic district, listed 2002 · nomination file for Ricker Pond State Park
- Montpelier Historic District (Boundary Increase), Montpelier · historic district, listed 1989 · nomination file for Montpelier Historic District (Boundary Increase)
- Montpelier Historic District, Montpelier · historic district, listed 1978
- Plainfield Village Historic District, Plainfield · historic district, listed 1983 · nomination file for Plainfield Village Historic District
- New Discovery State Park, Peacham · historic district, listed 2002 · nomination file for New Discovery State Park
- Preston--Lafreniere Farm, Bolton · historic district, listed 1999 · nomination file for Preston--Lafreniere Farm
- Chittenden, Giles, Farmstead, Williston · historic district, listed 1993 · nomination file for Chittenden, Giles, Farmstead
And 2 more within 100 m of the trail.
- Old maps
USGS topographic maps of the trail's middle go back to the 1919 Montpelier sheet (1:62,500); the 1968 Middlesex sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in February 2026 expected snow or ice on much of the trail into late April, especially through Groton State Forest, and several suggested waiting until May or later. r/vermont, Feb 2026
- Riders in May 2025, after heavy rain, said the Groton State Forest rail trail was passable with puddles expected, though one reported a tree down near Groton Lake and black flies. r/vermont, May 2025
- Riders in 2025 and 2026 described recent work on the trail: fresh gravel in Groton State Forest in fall 2024, a rebuild there in spring 2025, and a major rebuild east of the forest. r/vermont, May 2025 · r/vermont, Feb 2026
- Riders in 2024 and 2025 described the Ammonoosuc Rail Trail beyond Wells River: one found it good to Bath but rough after, shared with ATVs; another found it chunky in 2023, reportedly improved since. r/gravelcycling, May 2024 · r/bicycletouring, Apr 2025
6 Reddit threads about this trail, May 2024 to Mar 2026
- Thoughts on riding the Cross VT Trail around April 20th? r/vermont · Feb 2026 · 12 comments
- Bad Time for Bikepacking Trip? r/vermont · May 2025 · 29 comments
- Pics from a 56 mile ride through Vermont and a small bit of New Hampshire yesterday r/gravelcycling · May 2024 · 21 comments
- Best 7-14 day tour route (North America)? r/bicycletouring · Apr 2025 · 32 comments
- biking to richmond? r/burlington · Apr 2025 · 10 comments
- Winter/mud season Running r/vermont · Mar 2026 · 35 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationCross Vermont Trail Association
- FacebookCross Vermont Trail (Facebook)
- RedditSearch Reddit: r/vermont
Nearby trails
- Siboinebi Path within 0.2 mi · 3.3 mi, paved
- Railroad Bed East within 0.2 mi · 1.1 mi, surface unknown
- Island Line Trail within 0.2 mi · 12.0 mi, paved
- Ammonoosuc Recreational Trail 2.1 mi away · 21.3 mi, dirt · New Hampshire
- Blackmount Rail Trail 2.3 mi away · 3.6 mi, dirt · New Hampshire
- Route 127 Bike Path 2.7 mi away · 3.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 2750828, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- About Us — Cross Vermont Trail Association · organization · checked Oct 13, 2026 Supports: planned 90-mile route from Burlington on Lake Champlain to Wells River on the Connecticut River; towns including Williston, Richmond, East Montpelier, Plainfield, Marshfield and Groton; launched 1992; association incorporated 1999; Montpelier–Wells River Railroad 1873–1956; Groton State Forest railbed designated a rail trail; much of the route on roads, goal of moving it off state highways
- The story of the Montpelier & Wells River Railroad — Cross Vermont Trail Association · organization · checked Oct 13, 2026 Supports: railroad 1873–1956; Groton State Forest section from Marshfield Pond to Ricker Pond on the railbed with a causeway over ponds and wetlands; privately owned gap between John Fowler Road and Bemis Farm Road in Marshfield, with the official route on Route 2
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.