States › Texas

Culebra Creek Greenway

Greenway in Texas · OpenStreetMap relation

Runs through San Antonio · Bexar County

Conditions now

Loading the weather near San Antonio…

Forecast by the National Weather Service for San Antonio · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.5 mi 5.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Cathedral Rock Trailhead mile 1 · restrooms · water directions to Cathedral Rock Trailhead
  2. Terra Oak Trailhead mile 4.4 · restrooms · water directions to Terra Oak Trailhead
  3. Culebra Creek Park Trailhead mile 5.7 · restrooms · water directions to Culebra Creek Park Trailhead
  4. Parking mile 5.9 · restrooms directions to trailhead 4
Terra Oak Route (opens in a new tab)
Terra Oak Route · Photo: John Hayes (gravelboy) · CC BY-SA · Flickr

About this trail

The Culebra Creek Greenway is a paved hike-and-bike trail along Culebra Creek on the northwest side of San Antonio, Texas, part of the City of San Antonio's Howard W. Peak Greenway Trails System, which passed 100 miles in 2022. The system was first funded by a sales tax initiative in 2000, renewed in 2005, 2010 and 2015, and around 2020 moved to bond funding. The city's Parks and Recreation Department registered a Culebra Creek Hike & Bike Trail project at Grissom Road with the state: 1.25 miles of 10-foot-wide concrete trail for pedestrians and cyclists with a trailhead, estimated at $1.76 million and scheduled from January 2021 to June 2022. It is a creek greenway, not a rail-trail.

This record maps about 3.5 miles in two separate pieces. The western piece, about 2.3 miles, runs from Culebra Creek Park east and north to the Terra Oak trailhead and includes a short stretch that OpenStreetMap names the Helotes Creek Greenway Trail; both trailheads have parking, restrooms and water. The eastern piece, about 1.1 miles, runs east from the Cathedral Rock trailhead at Cathedral Rock Park, a 56-acre city park at 8002 Grissom Road. Most of the path is 8- to 10-foot concrete, with some asphalt stretches, bridges and a low-water crossing.

In July 2023 Bexar County commissioners approved $7.3 million for a 1.7-mile paved extension of the Culebra Creek trail between the Culebra Road and Grissom Road trailheads, then expected to start in late 2024 and finish in late 2026. A state registration filed in October 2025 for the Culebra Creek Grissom to Culebra Road trail lists construction from February 2026 to August 2027, at an estimated $1.46 million.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
San Antonio/Seaworld, 5.7 km from the trail's middle, 23 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F657076838995979893847466
Low °F434653606773747470625144
Precipitation, in21.82.32.443.42.42.53.13.81.91.9
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Helotes sheet (1:24,000); the 1966 Helotes sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5863048, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Culebra Creek Hike & Bike Trail (TABS2019018269) — Texas Department of Licensing and Regulation, TABS · government source · checked Oct 15, 2026
    Supports: Grissom Road project, 1.25 miles of 10-foot concrete trail with trailhead, $1,764,874 estimated, January 2021 to June 2022, owner City of San Antonio Parks and Recreation
  3. Culebra Creek Grissom to Culebra Rd Trail (TABS2026002906) — Texas Department of Licensing and Regulation, TABS · government source · checked Oct 15, 2026
    Supports: trail connecting existing trailheads from Grissom trailhead (9100 Grissom Road); registered October 2025; February 2026 to August 2027; estimated $1,462,000; owner City of San Antonio
  4. Construction of 1.7 mile Culebra Creek Trail extension to begin late next year — San Antonio Report (July 11, 2023) · organization · checked Oct 15, 2026
    Supports: Bexar County $7.3 million; 1.7-mile paved path between Culebra Road and Grissom Road trailheads; construction late 2024, completion late 2026; part of the Howard W. Peak Greenway Trails System
  5. The Trailist: Cathedral Rock Park is a natural limestone playground — San Antonio Report (December 6, 2020) · organization · checked Oct 15, 2026
    Supports: Cathedral Rock Park, 56-acre city park at 8002 Grissom Rd
  6. 103 miles and counting: local officials work to expand San Antonio's trail network — Community Impact (February 5, 2026) · web · checked Oct 15, 2026
    Supports: 100 miles completed in 2022; sales tax initiative in 2000, renewed 2005, 2010, 2015; shift to bonds around 2020
  7. Culebra Creek Greenway (relation 5863048) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped length in two pieces; Culebra Creek Park, Terra Oak and Cathedral Rock trailheads with parking, restrooms, water; Helotes Creek Greenway Trail link; concrete 8-10 ft with asphalt stretches, bridges, low-water crossing

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.