States › Kentucky

Dawkins Line Rail Trail

Rail-trail in Kentucky · OpenStreetMap relation

Runs through Paintsville · Johnson, Magoffin and Breathitt counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Dawkins Line Rail Trail is an 18-mile (29.0 km) rail trail in Johnson and Magoffin Counties in Kentucky. The multi-use trail, suitable for biking, walking, and horseback riding, occupies an abandoned rail corridor that was constructed in the early 20th century for the Dawkins Lumber Company. It is the longest rail trail in Kentucky.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
34.7 mi 55.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Jane Beshear Trailhead mile 17.5 directions to Jane Beshear Trailhead
  2. Parking mile 27.4 directions to trailhead 2
  3. Swamp Branch Trailhead mile 27.5 directions to Swamp Branch Trailhead
Johnson County, along the trail (opens in a new tab)
Johnson County, along the trail · Photo: J654567 · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Dawkins Line Rail Trail is a Kentucky State Parks trail in eastern Kentucky that the state calls the largest rail-to-trail in Kentucky. It runs 36 miles from Hagerhill in Johnson County through Magoffin County to Evanston in Breathitt County and is managed by the Kentucky Department of Parks in cooperation with the Kentucky Transportation Cabinet. The railroad was built from 1912 by the Big Sandy and Kentucky River Railroad, which the Dawkins Lumber Company incorporated to haul timber; the Chesapeake and Ohio acquired it in 1930 and extended it into Breathitt County after building a tunnel at Carver in 1949. The line later carried coal. R.J. Corman, which bought it from CSX in 2002, abandoned it in 2004; the state bought the right-of-way in 2011, and the first phase opened to the public on June 15, 2013.

The first 25 miles, from Hagerhill to Tip Top Tunnel, cross 24 trestles and pass through the 662-foot Gun Creek Tunnel. The final 11 miles to Evanston are complete, but Tip Top Tunnel is not open, so the Evanston end can be reached only from Breathitt County. Parking is at the Jenny's Creek, Swamp Branch, Royalton and Jane Beshear trailheads. The trail is open year-round to hikers, bicyclists and horseback riders.

In September 2022 the state announced a $4.1 million rehabilitation in two phases. The first phase was to pave 24 miles of gravel trail from Johnson County to Magoffin County, pave the Jenny's Creek and Jane Beshear trailhead lots and repair drainage, signs and bollards. The second, to be awarded in spring 2023, was to build a trail over the Carver Tunnel, also known as Tip Top, to join the two ends in Magoffin County, and pave the remaining 12 miles to Breathitt County.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 93% of this route as a trail on former railroad right-of-way.

Former CSX line. From Abandoned Railroad in Kentucky (Kentucky Transportation Cabinet, CC0).

Shade

43% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Paintsville 1e, 24.4 km from the trail's middle, 89 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444958707683868680705848
Low °F232632415160656356433228
Precipitation, in3.43.24.43.84.44.85.23.63.43.233.8
Old maps

USGS topographic maps of the trail's middle go back to the 1886 Prestonsburg sheet (1:125,000); the 1953 Ivyton sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 4504922, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Dawkins Line Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q14690292, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Explore | Dawkins Line Rail Trail - Kentucky State Parks · government source · checked Oct 15, 2026
    Supports: 36 miles Hagerhill to Evanston, 24 trestles, Gun Creek Tunnel 662 feet, Tip Top Tunnel not open, Evanston side reached from Breathitt County, trailheads, open year-round, largest rail-to-trail in the state, hikers, bikers and horseback riders
  5. Governor also announces Dawkins Line Rail Trail project to begin soon - Kentucky.gov (Sept. 19, 2022) · government source · checked Oct 15, 2026
    Supports: managed by Department of Parks with KYTC, timber then coal, opened 2013, $4.1 million two-phase project, Phase 1 paving and trailhead lots, Phase 2 trail over Carver (Tip Top) Tunnel and paving 12 miles
  6. Dawkins Line Rail Trail - Wikipedia · organization · checked Oct 15, 2026
    Supports: Big Sandy and Kentucky River Railroad 1912, Dawkins Lumber Company, C&O 1930, Carver tunnel 1949, R.J. Corman purchase 2002 and abandonment 2004, 2011 purchase, opening June 15, 2013

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.