States › Texas

Denton Creek Trail

Greenway in Texas · OpenStreetMap relation

Runs through Coppell · Dallas County

Conditions now

Loading the weather near Coppell…

Forecast by the National Weather Service for Coppell · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.0 mi 8.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 1.6 directions to trailhead 1
Coppell, along the trail (opens in a new tab)
Coppell, along the trail · Photo: Larry D. Moore · CC BY 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Denton Creek Trail is a paved hike-and-bike trail along Denton Creek in northern Coppell, Texas. Local press refers to it as the Denton Creek trail and to its levee section as the Denton Creek North Levee Trail; the trail name on the map comes from OpenStreetMap. This record maps about 5 miles of path, much of it on both banks of the creek.

On OpenStreetMap the trail runs from Denton Creek Park in the west past Magnolia Park and the West, Central and East sections of Andrew Brown Park, passes under Denton Tap Road, and continues east past Moore Road Park to North MacArthur Boulevard. The mapped path is concrete, with several bridges, some decked in wood, and a parking area near Andrew Brown Park West.

The City of Coppell has carried out repairs along the creek. From November 21, 2022, the stretch that follows Denton Creek under Denton Tap Road between Andrew Brown Park Central and Andrew Brown Park West was closed for six to eight weeks while crews placed gabion baskets, metal-and-rock structures, at the base of the creek to stop erosion and reduce the risk of flooding downstream. In April 2024 crews replaced the deck of a pedestrian bridge on the Denton Creek North Levee Trail, a bridge that carries both walkers and cyclists; the $87,410 project was paid for through the Coppell Recreation Development Corporation Fund, and city staff maintain the deck.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Grapevine Dam, 6.9 km from the trail's middle, 37 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566068758291959689786658
Low °F343845546371747467554536
Precipitation, in2.62.73.63.54.73.82.22.13.54.52.82.9
Snow, in00.10000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Dallas sheet (1:125,000); the 1959 Carrollton sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18468764, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Coppell bridge deck replacement underway along Denton Creek trail (April 5, 2024) — Community Impact · web · checked Oct 15, 2026
    Supports: trail name; Denton Creek North Levee Trail; April 2024 bridge deck replacement; bridge used by pedestrians and cyclists; $87,410; Coppell Recreation Development Corporation Fund; city staff maintenance
  3. Section of Coppell's Andrew Brown Park West Trail closed for construction (November 29, 2022) — Community Impact · web · checked Oct 15, 2026
    Supports: trail following Denton Creek under Denton Tap Road between Andrew Brown Park Central and West; closure from November 21, 2022 for six to eight weeks; gabion baskets against erosion and downstream flooding
  4. Denton Creek Trail (relation 18468764) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: name; route from Denton Creek Park past Magnolia Park, Andrew Brown Park West, Central and East, under Denton Tap Road, past Moore Road Park to North MacArthur Boulevard; concrete surface; bridges with wood decks; parking near Andrew Brown Park West; paths on both banks

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.