States › Indiana

Discovery Trail

Rail-trail in Indiana · OpenStreetMap relation

Runs through Clarksville · Clark County

Conditions now

Loading the weather near Clarksville…

Forecast by the National Weather Service for Clarksville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
On former railbed
0.6 mi 33%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Eastern Boulevard mile 0.6 directions to trailhead 1
  2. Parking at North Clark Boulevard mile 1.2 directions to trailhead 2
Clarksville, along the trail (opens in a new tab)
Clarksville, along the trail · Photo: William Alden · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Discovery Trail is a 1.9-mile asphalt multi-use trail in Clarksville, Indiana, built on a former CSX rail corridor. The Town of Clarksville acquired the corridor from CSX in 2018 and built the trail for bicycles, pedestrians and wheelchair users. Governor Eric Holcomb celebrated its completion on September 3, 2020.

The trail runs southwest through Clarksville from Applegate Lane to Silver Creek, where it merges with the Ohio River Greenway, giving uninterrupted trail connections to New Albany, Jeffersonville and Louisville. The town lists links to the Levee Trail, Heritage Trail and Lewis and Clark Trail and to nearby schools, neighborhoods and commercial corridors. The project built a trailhead on Eastern Boulevard near the Duke Energy property, where a crossing signal was also installed, and two pedestrian trailheads in Ray Lawrence Park and Beechwood Park.

The trail was one of 17 Next Level Trails grants awarded by the state in May 2019; the town received $840,800 from that program and another grant from the Southern Indiana Tourism Bureau, with the Clarksville Redevelopment Commission funding the rest. The total investment was more than $2,373,000. OpenStreetMap shows marked crossings at the streets along the way, a signal-controlled crossing, and one stretch that passes beneath a road in an underpass.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

20% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Louisville Mcalpine, 3.2 km from the trail's middle, 6 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434857697785898882705747
Low °F262937475866706962503831
Precipitation, in3.53.54.54.84.84.43.53.33.93.53.84.5
Snow, in2.30.30.3000000001.4
Old maps

USGS topographic maps of the trail's middle go back to the 1939 New Albany sheet (1:24,000); the 1955 New Albany sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12223408, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Gov. Holcomb celebrates completion of the Discovery Trail in Clarksville — State of Indiana Events · government source · checked Oct 15, 2026
    Supports: 1.9-mile asphalt multi-use trail, corridor acquired from CSX by the town in 2018, September 3, 2020 completion event, Applegate Lane to Silver Creek, merge with Ohio River Greenway and connections to New Albany, Jeffersonville and Louisville, Eastern Boulevard trailhead and crossing signal, one of 17 Next Level Trails grants in May 2019, total investment over $2,373,000
  3. Discovery Trail — Town of Clarksville, Indiana · government source · checked Oct 15, 2026
    Supports: former CSX rail corridor, bike, pedestrian and ADA accessible trail, Applegate Lane to Silver Creek, Eastern Boulevard trailhead near the Duke Energy property, pedestrian trailheads in Ray Lawrence Park and Beechwood Park, connections to Levee, Heritage and Lewis and Clark trails, schools and neighborhoods, $840,800 Next Level Trails grant, Southern Indiana Tourism Bureau grant, Clarksville Redevelopment Commission funding
  4. Discovery Trail (relation 12223408) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: marked street crossings, signal-controlled crossing, underpass segment

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.