States › South Carolina

Doodle Trail

Rail-trail in South Carolina · OpenStreetMap relation

Runs through Pickens, Arial and Easley · Pickens County

Conditions now

Loading the weather near Arial…

Forecast by the National Weather Service for Arial · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.7 mi 12.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Cedar Rock Street mile 0 · water directions to trailhead 1
  2. Parking at East Cedar Rock Street mile 0 · water directions to trailhead 2
  3. Parking at Railroad Street mile 0 · water directions to trailhead 3
  4. Parking at East Cedar Rock Street mile 0 · water directions to trailhead 4
  5. Parking at Rice Road mile 4.9 directions to trailhead 5
  6. Doodle Trail Parking mile 5.9 directions to Doodle Trail Parking
  7. Parking at Fleetwood Drive mile 7.5 · restrooms · water directions to trailhead 7
  8. Parking at West Main Street mile 7.5 · restrooms · water directions to trailhead 8
  9. West End Hall Parking mile 8.1 directions to West End Hall Parking
  10. Parking at Gulf Street mile 8.2 directions to trailhead 10
  11. Parking at Gulf Street mile 8.2 directions to trailhead 11
  12. Parking at South 5th Street mile 8.2 directions to trailhead 12
  13. Parking at North 1st Street mile 8.3 · water directions to trailhead 13
Pickens, along the trail (opens in a new tab)
Pickens, along the trail · Photo: Excel23 · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Doodle Trail is a paved rail-trail of about 8.5 miles in Pickens County, South Carolina, connecting the cities of Pickens and Easley. It is a partnership of the two cities and opened on Memorial Day weekend 2015. The trail follows the Doodle Line: in 1890 the state chartered a railroad from Easley to Oolenoy Gap by way of Pickens, and after eight years of construction the 8.5-mile section between Easley and Pickens began operating in 1898. Until 2013 the line carried food products, textiles and automobile parts. Residents called it the "Pickens Doodle" because the freight engine could not be turned and ran backward from Easley to Pickens, like a doodlebug.

In Pickens the trailhead is the city's Railroad Park on East Cedar Rock Street, a block from downtown, with a community building, shelter, restrooms, playground, bike station, renovated rail car, parking and a mural. The trail runs southeast, mostly away from traffic with only a few road crossings and several bridges, to Easley's Doodle Park at 514 Fleetwood Drive, about a mile from downtown Easley, which has a playground, workout equipment, picnic tables, restrooms, water fountains and a shelter. This record maps about 8.6 miles, including short links beyond Doodle Park toward downtown Easley.

The trail is paved for its whole length and open from dawn to dusk for biking, walking, running and rollerblading; mopeds and other unauthorized motor vehicles are not permitted. It includes two one-mile Kids in Parks TRACK Trails, one at each end. The City of Easley gives the length as 8.5 miles, while the SCTrails description says 7.5 miles.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 97% of this route as a trail on former railroad right-of-way.

Shade

40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pickens, 6.2 km from the trail's middle, 3 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525664738086908883736355
Low °F303339475765696862493833
Precipitation, in5.24.54.94.7454.85.14.54.14.25.7
Snow, in0.40.20000000000.4
On the National Register
  • Arial Mill, Easley · historic district, listed 2023
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Pickens sheet (1:125,000); the 1957 Easley sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • In March 2024, walkers described Sip and Ride, a new outdoor spot beside the trail in Easley with beer and wine on tap, a fire pit and weekend food trucks. r/greenville, Mar 2024
  • In October 2025, one commenter called the trail very flat, while another said some sections have bigger hills than other nearby paved paths and parks. r/greenville, Oct 2025
  • In late 2025, one person said the Southern Weaving Food Hall in Easley has ample parking and trail access; another mentioned railroad-themed sights at each end of the trail. r/greenville, Sep 2025 · r/greenville, Dec 2025
7 Reddit threads about this trail, Mar 2024 to Dec 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5207085, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Doodle Trail — City of Easley · government source · checked Oct 16, 2026
    Supports: 8.5-mile partnership of Easley and Pickens, opened Memorial Day weekend 2015, dawn to dusk, biking, walking, running and rollerblading; 1890 charter Easley to Oolenoy Gap via Pickens; 8.5-mile Easley-Pickens section operational 1898; freight until 2013 and commodities; Pickens Doodle nickname; trailhead at 514 Fleetwood Drive
  3. Doodle — SCTrails · web · checked Oct 16, 2026
    Supports: paved entire route; mostly away from traffic, few road crossings, bridges; Doodle Park amenities, one mile from downtown Easley; Pickens Railroad Park on East Cedar Rock Street and its amenities; no mopeds or motor vehicles; two one-mile Kids in Parks TRACK Trails; 7.5-mile figure; City of Pickens Recreation Department contact
  4. Doodle Trail — OpenStreetMap relation 5207085 · web · checked Oct 16, 2026
    Supports: mapped extent of this record (about 8.6 miles)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.