Downtown Greenway
Rail-trail in Michigan · OpenStreetMap relation
Runs through Petoskey · Emmet County
Conditions now
Loading the weather near Petoskey…
Forecast by the National Weather Service for Petoskey · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Grove Street mile 0 directions to trailhead 1
- Parking at Grove Street mile 0 directions to trailhead 2
- Parking at Petoskey Street mile 0.1 directions to trailhead 3
- Parking at Michigan Street mile 0.2 directions to trailhead 4
- Parking at State Street mile 0.2 directions to trailhead 5
- Parking at Michigan Street mile 0.3 · restrooms · water directions to trailhead 6
- Parking at East Lake Street mile 0.4 directions to trailhead 7
- Parking at East Lake Street mile 0.5 directions to trailhead 8
- Parking at Bay Street mile 0.5 directions to trailhead 9
- Parking at Bay Street mile 0.5 directions to trailhead 10
- Parking at Macdonald Drive mile 1.1 directions to trailhead 11
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Downtown Greenway, also called the Petoskey Greenway, is a walking and biking route of about 1.1 miles through downtown Petoskey, Michigan, maintained by the City of Petoskey, which lists the Greenway Corridor among its parks. The Grand Rapids and Indiana Railroad reached Petoskey in 1874; in the Petoskey Downtown Historic District, which the route crosses, the railroad's old tracks run diagonally through the district and the open land beside them is landscaped as a park.
The route leads from the Old Town Emmet District through downtown's Pennsylvania Park and Arlington Park, runs parallel to Sunset Park along US 31, and ends across from Kilwins Chocolate Kitchen on MacDonald Drive in Bay View. Riders are asked to walk their bikes through Pennsylvania Park from East Mitchell Street to Bay Street.
Free parking is available at Arlington Park and Quarry Park, with paid parking on streets near Pennsylvania Park and in the Elks lot by City Park Grill.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 64% of this route as a trail on former railroad right-of-way.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Petoskey, 1.9 km from the trail's middle, 18 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 27 28 37 48 61 70 75 75 69 56 44 34 Low °F 15 14 20 32 43 53 59 59 51 41 32 23 Precipitation, in 2.4 1.7 1.9 2.9 3.1 2.9 2.5 3.2 3.5 4.5 3 2.4 Snow, in 39.3 27.2 12.2 4.5 0.1 0 0 0 0 0.3 9.4 30.6 - On the National Register
- East Mitchell Street Historic District, Petoskey · historic district, listed 1986 · nomination file for East Mitchell Street Historic District
- Petoskey Downtown Historic District, Petoskey · historic district, listed 1986 · nomination file for Petoskey Downtown Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1955 Cheboygan sheet (1:250,000); the 1958 Petoskey sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 2
Nearby trails
- Little Traverse Wheelway within 0.2 mi · 23.7 mi, paved
- North Western State Trail 2.0 mi away · 31.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14949172, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenway Corridor — City of Petoskey · government source · checked Oct 15, 2026 Supports: the city lists the Greenway Corridor among its parks
- Petoskey Downtown Historic District — Wikipedia · organization · checked Oct 15, 2026 Supports: Grand Rapids and Indiana Railroad began service to Petoskey in 1874; old tracks run diagonally through the district, bordering land landscaped as a park
- Petoskey Greenway — Petoskey Area Visitors Bureau · web · checked Oct 15, 2026 Supports: walking or biking route from the Old Town Emmet District through Pennsylvania Park and Arlington Park, parallel to Sunset Park along US 31, ending in Bay View on MacDonald Drive across from Kilwins; walk bikes through Pennsylvania Park from East Mitchell Street to Bay Street; parking; maintained by the City of Petoskey
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.

