Dry Cedar Creek Trail
Greenway in Colorado · OpenStreetMap relation
Runs through Montrose · Montrose County
Conditions now
Loading the weather near Montrose…
Forecast by the National Weather Service for Montrose · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Odelle Road mile 0.6 directions to trailhead 1
- Parking at Woodgate Road mile 0.9 directions to trailhead 2
- Parking at Woodgate Road mile 0.9 · restrooms directions to trailhead 3
- Parking at Ogden Road mile 1 directions to trailhead 4
- Parking at Ogden Road mile 1 directions to trailhead 5
- Parking at Ogden Road mile 1 directions to trailhead 6
- Parking at Ogden Road mile 1 directions to trailhead 7
- Parking at Ogden Road mile 1 directions to trailhead 8
- Parking at Ogden Road mile 1 directions to trailhead 9
- Parking at Ogden Road mile 1.1 directions to trailhead 10
(opens in a new tab) About this trail
The Dry Cedar Creek Trail is a concrete path of about 1.3 miles on the south side of Montrose, Colorado, the southern leg of the trail the City of Montrose built under its Connect Initiative. The name comes from OpenStreetMap, which maps it as a local bicycle route from the Uncompahgre River Walk to the Montrose Recreation Center; the Montrose Recreation District describes the same corridor as part of its Uncompahgre River Trail project.
The city received a $2 million grant from Great Outdoors Colorado for the Connect Initiative, within a total budget of $3.25 million that included $550,000 from the city and $355,000 from the Montrose Recreation District. The project built 2.25 miles of 10-foot-wide concrete trail and was completed in August 2020 at a final construction cost of $2.7 million. Del-Mont Consultants designed it with Loris and Associates, Western Gravel Constructors built it, and it won a 2021 Starburst Award for its use of Lottery funds.
The trail runs from the Montrose Community Recreation Center to the Woodgate Road roundabout, then passes behind the post office and City Market along Dry Cedar Creek. An underpass at the U.S. 550 (Townsend Avenue) bridge over Dry Cedar Creek, just west of City Market, carries it beneath the highway, and it joins the Uncompahgre River Trail near Riverbottom Park. The Uncompahgre RiverWay through Montrose runs 7.1 miles from the north end of town to the south end. OpenStreetMap records trailhead parking off Ogden Road and Odelle Road.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Montrose #2, 3.9 km from the trail's middle, 28 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 40 46 57 64 74 86 90 87 79 66 52 41 Low °F 18 23 30 37 45 53 59 58 49 37 27 18 Precipitation, in 0.5 0.5 0.7 0.8 0.8 0.5 0.9 1.1 1.2 1 0.7 0.6 Snow, in 4.7 3.9 2.2 0.6 0 0 0 0 0 0.5 2.7 6.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1909 Montrose sheet (1:125,000); the 1962 Montrose East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesMontrose Recreation District: Uncompahgre River Trail
Nearby trails
- Uncompahgre Riverway Trail within 0.2 mi · 11.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 18135157, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Uncompahgre River Trail — Montrose Recreation District · organization · checked Oct 17, 2026 Supports: Connect Initiative, GOCO grant and budget shares, 2.25 miles of 10-foot concrete trail, August 2020 completion, $2.7 million cost, designers and contractor, 2021 Starburst Award, route from the Recreation Center past Woodgate Road, post office and City Market along Dry Cedar Creek, US 550 underpass, connection near Riverbottom Park
- The Connect Trail — Visit Montrose (City of Montrose Office of Business and Tourism) · web · checked Oct 17, 2026 Supports: 7.1-mile Uncompahgre RiverWay through Montrose, north end to south end
- Dry Cedar Creek Trail, relation 18135157 — OpenStreetMap · web · checked Oct 17, 2026 Supports: name, local bicycle route from the Uncompahgre River Walk to the Montrose Recreation Center, length, parking off Ogden Road and Odelle Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.