States › Colorado

Dry Cedar Creek Trail

Greenway in Colorado · OpenStreetMap relation

Runs through Montrose · Montrose County

Conditions now

Loading the weather near Montrose…

Forecast by the National Weather Service for Montrose · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Odelle Road mile 0.6 directions to trailhead 1
  2. Parking at Woodgate Road mile 0.9 directions to trailhead 2
  3. Parking at Woodgate Road mile 0.9 · restrooms directions to trailhead 3
  4. Parking at Ogden Road mile 1 directions to trailhead 4
  5. Parking at Ogden Road mile 1 directions to trailhead 5
  6. Parking at Ogden Road mile 1 directions to trailhead 6
  7. Parking at Ogden Road mile 1 directions to trailhead 7
  8. Parking at Ogden Road mile 1 directions to trailhead 8
  9. Parking at Ogden Road mile 1 directions to trailhead 9
  10. Parking at Ogden Road mile 1.1 directions to trailhead 10
Dry Cedar Creek Trail (opens in a new tab)
Photo: gary_garylancelot_com · CC BY-SA 4.0 · Mapillary

About this trail

The Dry Cedar Creek Trail is a concrete path of about 1.3 miles on the south side of Montrose, Colorado, the southern leg of the trail the City of Montrose built under its Connect Initiative. The name comes from OpenStreetMap, which maps it as a local bicycle route from the Uncompahgre River Walk to the Montrose Recreation Center; the Montrose Recreation District describes the same corridor as part of its Uncompahgre River Trail project.

The city received a $2 million grant from Great Outdoors Colorado for the Connect Initiative, within a total budget of $3.25 million that included $550,000 from the city and $355,000 from the Montrose Recreation District. The project built 2.25 miles of 10-foot-wide concrete trail and was completed in August 2020 at a final construction cost of $2.7 million. Del-Mont Consultants designed it with Loris and Associates, Western Gravel Constructors built it, and it won a 2021 Starburst Award for its use of Lottery funds.

The trail runs from the Montrose Community Recreation Center to the Woodgate Road roundabout, then passes behind the post office and City Market along Dry Cedar Creek. An underpass at the U.S. 550 (Townsend Avenue) bridge over Dry Cedar Creek, just west of City Market, carries it beneath the highway, and it joins the Uncompahgre River Trail near Riverbottom Park. The Uncompahgre RiverWay through Montrose runs 7.1 miles from the north end of town to the south end. OpenStreetMap records trailhead parking off Ogden Road and Odelle Road.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Montrose #2, 3.9 km from the trail's middle, 28 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404657647486908779665241
Low °F182330374553595849372718
Precipitation, in0.50.50.70.80.80.50.91.11.210.70.6
Snow, in4.73.92.20.6000000.52.76.9
Old maps

USGS topographic maps of the trail's middle go back to the 1909 Montrose sheet (1:125,000); the 1962 Montrose East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18135157, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Uncompahgre River Trail — Montrose Recreation District · organization · checked Oct 17, 2026
    Supports: Connect Initiative, GOCO grant and budget shares, 2.25 miles of 10-foot concrete trail, August 2020 completion, $2.7 million cost, designers and contractor, 2021 Starburst Award, route from the Recreation Center past Woodgate Road, post office and City Market along Dry Cedar Creek, US 550 underpass, connection near Riverbottom Park
  3. The Connect Trail — Visit Montrose (City of Montrose Office of Business and Tourism) · web · checked Oct 17, 2026
    Supports: 7.1-mile Uncompahgre RiverWay through Montrose, north end to south end
  4. Dry Cedar Creek Trail, relation 18135157 — OpenStreetMap · web · checked Oct 17, 2026
    Supports: name, local bicycle route from the Uncompahgre River Walk to the Montrose Recreation Center, length, parking off Ogden Road and Odelle Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.