Dry Creek Parkway Trail
Greenway in California · OpenStreetMap relation
Runs through Rio Linda and Elverta · Sacramento County
Conditions now
Loading the weather near Rio Linda…
Forecast by the National Weather Service for Rio Linda · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Dry Creek Road mile 0 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Dry Creek Parkway Trail is a paved path along Dry Creek in Rio Linda, Sacramento County, California, in the county's Dry Creek Parkway. Sacramento County, whose Department of Regional Parks is extending the trail, also calls the existing section the Dry Creek Bikeway. OpenStreetMap maps it as a local bicycle route.
In OpenStreetMap the trail starts at Dry Creek Road near Curved Bridge Road and runs northeast along Dry Creek to 24th and U streets in Rio Linda, the point where the county says the existing Dry Creek Bikeway ends. This record maps about 2.1 miles.
In October 2023 Sacramento County announced that a $7,704,000 recommendation from the Sacramento Area Council of Governments had been adopted in the California Transportation Commission's 2023 Active Transportation Program, funding Regional Parks to build a paved Class I multi-use trail in the Dry Creek area. The county's January 2024 environmental filing for Dry Creek Trail Phase II describes two new segments: about 2.6 miles of paved trail from the Cherry Island Sports Complex north to the Placer County line in Gibson Ranch Park, and 0.7 mile connecting the Sacramento Northern Bikeway Trail to the existing trail along Dry Creek Road, with a parallel equestrian trail, crossing signals and bridges over Dry Creek and an unnamed tributary. The county called the work a connection to the American River Parkway and a step toward a 70-mile regional loop trail, and expected construction to begin in 2025; Rio Linda Online reported that it would be built in phases. Whether construction has started was not confirmed.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sacramento Metro Airport, 14.3 km from the trail's middle, 12 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 55 60 66 72 81 88 94 92 88 79 64 55 Low °F 38 40 43 46 52 56 59 58 55 48 41 37 Precipitation, in 3.7 3.5 2.6 1.2 0.6 0.2 0 0.1 0.1 0.8 1.8 3.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1951 Rio Linda sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Sacramento Northern Bike Trail 0.5 mi away · 10.1 mi, paved
- Walter S. Ueda Parkway Trail 3.0 mi away · 3.7 mi, paved
- Jackrabbit Trail 3.7 mi away · 5.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 20307608, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Dry Creek Parkway Trail – Breaking Ground in 2025 — County of Sacramento (October 26, 2023) · government source · checked Oct 16, 2026 Supports: Department of Regional Parks project; $7,704,000 SACOG recommendation adopted in the CTC's 2023 Active Transportation Program; paved Class I multi-use trail; existing Dry Creek Bikeway ends at 24th and U streets in Rio Linda; section north along Dry Creek to the Placer County line; section southwest to the Sacramento Northern Trail near Elkhorn Blvd; connection to the American River Parkway; 70-mile loop; construction expected to begin in 2025
- PLER2020-00110 Dry Creek Trail Phase II (SCH 2024010313) — CEQAnet, State of California · government source · checked Oct 16, 2026 Supports: Sacramento County MND received January 12, 2024; existing Dry Creek Parkway Trail; northern segment about 2.6 miles from the Cherry Island Sports Complex at 28th and U streets to the Placer County line in Gibson Ranch Park; southern segment 0.7 mile connecting the Sacramento Northern Bikeway Trail to the existing Dry Creek Bikeway Trail along Dry Creek Road; parallel equestrian trail; crossing signals; bridges over Dry Creek and an unnamed tributary; Dry Creek Parkway
- Dry Creek Bikeway extension — Rio Linda Online (January 31, 2024) · web · checked Oct 16, 2026 Supports: construction to be executed in phases
- OpenStreetMap relation 20307608 — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: local bicycle route; route from Dry Creek Road near Curved Bridge Road along Dry Creek to 24th and U streets; paved; record length about 2.1 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.