States › Iowa

E P True Parkway Trail

Greenway in Iowa · OpenStreetMap relation

Runs through West Des Moines · Dallas County

Conditions now

Loading the weather near West Des Moines…

Forecast by the National Weather Service for West Des Moines · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.5 mi 4.0 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at E P True Parkway mile 0.1 directions to trailhead 1
  2. Parking at E P True Parkway mile 0.2 directions to trailhead 2
  3. Parking at E P True Parkway mile 0.2 directions to trailhead 3
  4. Parking at E P True Parkway mile 0.4 directions to trailhead 4
  5. Parking at E P True Parkway mile 0.4 directions to trailhead 5
  6. Parking at E P True Parkway mile 0.5 directions to trailhead 6
E P True Parkway Trail (opens in a new tab)
Photo: Hopen111 · CC BY-SA 4.0 · Mapillary

About this trail

The E.P. True Parkway Trail is a shared-use path along E.P. True Parkway on the west side of West Des Moines, Iowa. It is a roadside greenway, not a rail-trail. OpenStreetMap carries it as a regional bicycle route in the Des Moines-area network, citing the Des Moines Area MPO trail map; no City of West Des Moines page about the trail could be read for this article.

The route mapped here is about 2.5 miles long. Its east end meets the Jordan Creek Trail, which the Iowa Natural Heritage Foundation describes as the main east-west spine of the West Des Moines trail system, and it runs west and southwest along the parkway to Grand Prairie Parkway, with several mapped parking areas off E.P. True Parkway. The Jordan Creek Trail itself also follows E.P. True Parkway for a stretch before leaving it at Grand Avenue.

In September 2014 WHO 13 reported that city officials would close a half-mile section of the E.P. True Parkway trail, from South 26th Street to Jordan Creek, for four to six weeks of renovation: asphalt recycling, crack sealing, asphalt overlays and rebuilt pedestrian ramps. The surface of the western part of the route was not confirmed.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Des Moines International Airport, 15.8 km from the trail's middle, 3 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313649627282868477634836
Low °F141830415262666455433020
Precipitation, in1.11.32.245.25.33.84.23.22.81.91.6
Snow, in9.410.24.41.20.200000.52.77.9
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Waukee sheet (1:62,500); the 1965 Commerce sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18214595, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Popular West Des Moines Trail Closing for Maintenance — WHO 13 (September 29, 2014) · web · checked Oct 15, 2026
    Supports: name 'E.P. True Parkway trail'; 2014 closure of a half-mile section from South 26th Street to Jordan Creek for four to six weeks; asphalt recycling, crack sealing, overlays, pedestrian ramps
  3. Jordan Creek Greenway Trail — Iowa By Trail (Iowa Natural Heritage Foundation) · web · checked Oct 15, 2026
    Supports: Jordan Creek Trail as main east-west spine of the West Des Moines trail system; Jordan Creek Trail leaves EP True Parkway at Grand Avenue
  4. E P True Parkway Trail — OpenStreetMap relation 18214595 · web · checked Oct 15, 2026
    Supports: regional bicycle route citing the Des Moines Area MPO trail map; mapped line of about 2.5 miles from the Jordan Creek Trail west to Grand Prairie Parkway; parking areas off E.P. True Parkway

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.