States › Indiana

East End Bridge Pedestrian Path

Greenway in Indiana

Runs through Utica · Clark County

Conditions now

Loading the weather near Utica…

Forecast by the National Weather Service for Utica · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Lewis and Clark Bridge 2025a (opens in a new tab)
Lewis and Clark Bridge 2025a · Photo: Antony-22 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The East End Bridge Pedestrian Path is the Indiana side of the shared path on the Lewis and Clark Bridge, the East End Crossing over the Ohio River between Utica, Indiana, and Prospect, Kentucky. The bridge opened to traffic on December 18, 2016. The project site says the path is reached in Indiana from Old Salem Road, with parking on the south side of Indiana SR 265 at Old Salem Road, and in Kentucky from River Road. There are no public restrooms along the path.

TrailLink describes the whole Lewis and Clark Bridge Trail as 2.5 miles of asphalt, starting 1.4 miles north of the river on Old Salem Road in Jeffersonville, paralleling IN-265 behind a split rail fence, and crossing the bridge to River Road. The Kentucky part is a separate record, east-end-bridge-pedestrian-path-ky.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April, June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Louisville Bowman Field, 13.5 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434857697785888781695746
Low °F273038485766696860483831
Precipitation, in3.33.34.44.75.24.74.63.53.63.63.43.9
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Prospect sheet (1:62,500); the 1955 Jeffersonville sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Lewis and Clark Bridge (Ohio River) - Wikipedia · organization · checked Oct 18, 2026
    Supports: opened December 18, 2016; Utica, Indiana and Prospect, Kentucky
  3. The Bridge Project - East End Crossing · web · checked Oct 18, 2026
    Supports: access from Old Salem Road and River Road, parking, no restrooms, opened December 2016, INDOT oversight and East End Crossing Partners operate and maintain
  4. Lewis and Clark Bridge Trail | Indiana Trails | TrailLink · web · checked Oct 18, 2026
    Supports: 2.5 miles, asphalt, starts on Old Salem Road, split rail fence, overlook

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.