States › Wisconsin

East River Trail

Greenway in Wisconsin

Runs through Green Bay, Bellevue, Allouez, De Pere and Ledgeview · Brown County

Conditions now

Loading the weather near Allouez…

Forecast by the National Weather Service for Allouez · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
9.4 mi 15.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Creamery Road mile 0.4 directions to trailhead 1
  2. Parking at Creamery Road mile 0.4 directions to trailhead 2
  3. Parking at Creamery Road mile 0.4 directions to trailhead 3
  4. Parking at Dickinson Road mile 0.4 directions to trailhead 4
  5. Parking at Dickinson Road mile 0.4 directions to trailhead 5
  6. Parking at Dickinson Road mile 0.4 directions to trailhead 6
  7. Parking at Creamery Road mile 0.4 directions to trailhead 7
  8. Parking at Dickinson Road mile 0.4 directions to trailhead 8
  9. Parking at Dickinson Road mile 0.6 directions to trailhead 9
  10. Parking at Lebrun Street mile 2 directions to trailhead 10
  11. Parking at Hoffman Road mile 3 directions to trailhead 11
  12. Parking at Hoffman Road mile 3 directions to trailhead 12
  13. Parking at East River Drive mile 3 directions to trailhead 13
  14. Parking at Broadview Drive mile 3.5 directions to trailhead 14
  15. Parking mile 4 directions to trailhead 15
  16. Parking at Manderly Lane mile 4.2 · restrooms directions to trailhead 16
  17. Parking at Greene Avenue mile 4.3 directions to trailhead 17
  18. Parking at Greene Avenue mile 4.3 directions to trailhead 18
  19. Parking at East Allouez Avenue mile 5 directions to trailhead 19
  20. Parking at East Allouez Avenue mile 5 directions to trailhead 20
  21. Parking at East Allouez Avenue mile 5 directions to trailhead 21
  22. Parking at East Allouez Avenue mile 5.1 directions to trailhead 22
  23. Parking at East Allouez Avenue mile 5.1 directions to trailhead 23
  24. Parking at East Allouez Avenue mile 5.1 directions to trailhead 24
  25. Parking at East Allouez Avenue mile 5.2 directions to trailhead 25
  26. Parking at Bellevue Street mile 5.3 directions to trailhead 26
  27. Parking at Bellevue Street mile 5.4 directions to trailhead 27
  28. Parking at Bellevue Street mile 5.4 directions to trailhead 28
  29. Parking at Westminster Drive mile 6.2 directions to trailhead 29
East River in Green Bay (opens in a new tab)
East River in Green Bay · Photo: Rauglothgor · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The East River Trail is a paved trail along the East River in Brown County, Wisconsin, linking five communities from Ledgeview at its south end through De Pere, Allouez and Bellevue to Green Bay at its north end. It is a riverside greenway rather than a rail-trail. TrailLink gives its length as 6.5 miles of concrete between North Baird Street in Green Bay and Winding Waters Way, and notes that sections were added over the years, some not connected to the others. The Allouez and Bellevue sections carry the name Resch Family East River Trail.

In Allouez the trail runs 2.7 miles one way from east of the Green Isle tennis courts south to the village limit at Le Brun Road. The village says it was the first paved recreation trail in the greater Green Bay area when it was built in 1990. Bellevue's section, more than 2 miles long, runs from Manderly Way to Westminster Drive, with access off Westminster Drive, the west part of the Rite Place parking lot and the end of Manderly Way. Parking is also available at Joannes Park (205 South Baird Street) and Green Isle Park in Green Bay, Riverview Park and Wiese Park in Allouez, and Ledgeview Park on Dickinson Road; Green Isle and Riverview have restrooms.

The Allouez section is plowed in winter. Dogs must be on a 6-foot leash, and village trail rules allow e-bikes with working pedals at up to 10 mph. The Fox River State Trail runs a few blocks to the west; in 2015 Allouez built a half-mile link along Highway 172 from the Fox River Trail to Webster Avenue, with the aim of eventually connecting the two trails.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Green Bay, 8.9 km from the trail's middle, 30 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F262940546777817972584431
Low °F111324354656605850402918
Precipitation, in1.41.2233.44.13.63.43.22.721.8
Snow, in14.3128.14.7000000.33.113.1
Old maps

USGS topographic maps of the trail's middle go back to the 1954 De Pere sheet (1:24,000); the 1954 De Pere sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • One rider in 2024 said the confusing stretch was near the KI headquarters, where connecting meant taking Bellevue to Elkay Lane, which was not clearly marked when last checked. r/GreenBay, Jul 2024
  • In 2024, one commenter preferred the Green Isle Park stretch to the Fox River Trail, another found it quieter most days, and a third said emerald ash borer tree loss dulled some sections. r/GreenBay, Jan 2024 · r/GreenBay, Oct 2024
  • Commenters in April 2026 reported the East River spilling into Emilie Park in Green Bay and rising by the De Pere trail; one said the area had flooded three times in their life. r/GreenBay, Apr 2026
  • One rider in 2026 said the trail turns into the Baird Creek Trail and suggested starting from that end for variety. r/GreenBay, May 2026
7 Reddit threads about this trail, Jan 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Community Trails — Village of Allouez, WI · government source · checked Oct 15, 2026
    Supports: Resch Family East River Trail; 2.7 miles one way from east of the Green Isle tennis courts to the village limit at Le Brun Road; first paved recreation trail in the greater Green Bay area when built in 1990; plowed in winter; 6-foot leash rule; e-bike rule and 10 mph limit; 2015 half-mile Highway 172 link from the Fox River Trail to Webster Avenue aimed at connecting to the East River Trail
  3. Trails — Village of Bellevue · government source · checked Oct 15, 2026
    Supports: East River Resch Family Trail; over 2 miles from Manderly Way to Westminster Drive; access points; trail connects 5 communities from Ledgeview on the south end to Green Bay on the north end
  4. East River Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 15, 2026
    Supports: 6.5 miles; concrete; endpoints N. Baird St. and Winding Waters Way; Greenway/Non-RT; Green Bay, Bellevue, Allouez, De Pere and Ledgeview; sections added over the years, some disconnected; parking at Joannes, Green Isle, Riverview, Wiese and Ledgeview parks with addresses and restrooms; Fox River State Trail a few blocks west

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.