States › Texas

Edible Arbor Trail

Greenway in Texas

Runs through Missouri City · Fort Bend County

Conditions now

Loading the weather near Missouri City…

Forecast by the National Weather Service for Missouri City · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.4 mi 3.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Murphy Road mile 0.1 directions to trailhead 1
Sugar Land, along the trail (opens in a new tab)
Sugar Land, along the trail · Photo: Ed Schipul (https://www.flickr.com/people/eschipul/) · CC BY-SA 2.5 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Edible Arbor Trail is a paved path along Oyster Creek in Missouri City, Texas, beside which the city has planted groves of fruit and nut trees that the public may pick from. The name on this record comes from OpenStreetMap, which tags the path as a concrete cycleway called the Edible Arbor Trail; press reports place the edible arbor along the city's Oyster Creek Trail.

Missouri City created the nearly two-mile edible trail in 2010 as a way to connect residents with nature, according to a 2019 ABC13 report that quoted Randy Troxell, the city's assistant parks and recreation director. In an earlier report, city forester Paul Wierzbicki said the eight species then planted were drought resistant and relatively pest-free, needing little irrigation and no spraying, and that volunteers, grants and corporate donations had paid for the plantings rather than taxpayers. The blooms are staggered so that something flowers for most of the year. Many of the trees were destroyed during Hurricane Harvey, but in 2019 dozens of kinds of nuts and fruits, among them plums, figs and persimmons, were still growing along the trail.

This record maps about 2.4 miles of path in two connected pieces, running northwest along the creek from Murphy Road, where OpenStreetMap shows a parking area.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Houston Sugarland Memorial, 9.3 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F646874808792959490837466
Low °F455055606974767672625346
Precipitation, in3.62.83.54.35.24.24.25.34.44.73.83.8
Old maps

USGS topographic maps of the trail's middle go back to the 1950 Houston sheet (1:250,000); the 1955 Sugar Land sheet (1:62,500) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Edible trail in Missouri City offers taste of nature through most of the year — ABC7 (KGO-TV archive) · press · checked Oct 15, 2026
    Supports: edible arbor trail along the Oyster Creek Trail in Missouri City; forester Paul Wierzbicki; eight drought-resistant, relatively pest-free species; minimal irrigation, no spraying; paid for by volunteers, grants and corporate donations at no taxpayer cost; staggered blooms
  3. Missouri City's edible arbor trail: Pick fruit right off trees! — ABC13 Houston (September 30, 2019) · web · checked Oct 15, 2026
    Supports: nearly two-mile edible trail created in 2010 to connect residents with nature; Randy Troxell, assistant parks and recreation director; many trees destroyed during Hurricane Harvey; dozens of nuts and fruits such as plums, figs and persimmons still growing; picking fruit off the trees
  4. OpenStreetMap ways for this trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: name Edible Arbor Trail on the path (concrete cycleway); path along Oyster Creek; mapped extent of about 2.4 miles in two pieces; parking at Murphy Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.