States › Florida

El Rio Trail

Greenway in Florida

Runs through Boca Raton · Palm Beach County

Conditions now

Loading the weather near Boca Raton…

Forecast by the National Weather Service for Boca Raton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.7 mi 7.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East University Drive mile 0.4 directions to trailhead 1
  2. Parking at Northwest 6th Avenue mile 1.1 directions to trailhead 2
  3. Parking at Northwest 53rd Street mile 2.4 directions to trailhead 3
  4. Parking at Northwest 53rd Street mile 2.5 directions to trailhead 4
  5. Parking at Park of Commerce Boulevard mile 2.6 directions to trailhead 5
Train Tracks Over El Rio Canal Boca Raton (opens in a new tab)
Train Tracks Over El Rio Canal Boca Raton · Photo: Phillip Pessar · CC BY · Flickr

About this trail

The El Rio Trail is a paved walking and biking path of 4.8 miles in Boca Raton, Palm Beach County, Florida, that follows the El Rio Canal. The City of Boca Raton lists it among its park trails, open from sunrise to sunset, with city park rangers as the contact. It runs mostly along the canal and a power line, away from roads except at crossings, and links Florida Atlantic University, neighborhoods, businesses and the Boca Raton Tri-Rail station. It is not a rail-trail.

From Glades Road at the south end, the trail runs along the west side of the canal beside the university, crosses to the east side, and crosses Northwest 20th Street. At Spanish River Boulevard (Northwest 40th Street) a 2024 guide describes the route as rerouted east to Northwest 6th Street to cross. North of there it passes under Interstate 95, the railroad and Yamato Road. At the Tri-Rail station a side path crosses the canal on a bridge, with benches and a bicycle repair station; the station's free parking lies on the far side of the tracks, reached by elevator and overpass. The trail crosses Park of Commerce Boulevard and Clint Moore Road, passes the Yamato Scrub Natural Area, where bicycles are not allowed, and crosses Congress Avenue. It follows the El Rio Canal to the Gulfstream Canal (C-15) at the Delray Beach line, then turns along that canal for 0.4 mile back to Congress Avenue.

The surface is asphalt, with benches and water fountains at intervals. City rules bar pets, smoking, alcohol and drones in city parks. The map line for this record measures about 4.7 miles in five pieces between the Glades Road end and Congress Avenue.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pompano Beach Airpark, 16.2 km from the trail's middle, 3 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F767880848689909189868178
Low °F606265707376787877746864
Precipitation, in1.922.93.45.58.15.36.37.66.73.72.5
Old maps

USGS topographic maps of the trail's middle go back to the 1950 Delray Beach sheet (1:24,000); the 1962 Delray Beach sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. El Rio Trail — City of Boca Raton, FL · government source · checked Oct 16, 2026
    Supports: paved path along the El Rio Canal for walking and biking, 4.8 miles, city park trail, sunrise to sunset hours, park rangers, free parking at the Tri-Rail station, prohibition of pets, smoking, alcohol and drones in city parks
  3. El Rio Trail, Boca Raton — 100 Florida Trails (updated February 2024) · web · checked Oct 16, 2026
    Supports: runs along El Rio Canal and a power line, links FAU, neighborhoods, businesses and Tri-Rail station, end points Glades Road and Congress Avenue, section-by-section route, Spanish River Blvd. reroute to NW 6th St., underpasses at I-95, the railroad and Yamato Road, Tri-Rail side path bridge, fix-it station and parking reached by elevator and overpass, Park of Commerce Blvd. and Clint Moore Rd. crossings, Yamato Scrub Natural Area with bikes not allowed, Gulfstream Canal (C-15) at the Delray Beach line and final 0.4 mile, asphalt surface, benches and water fountains
  4. OpenStreetMap ways named El Rio Trail — OpenStreetMap · web · checked Oct 16, 2026
    Supports: the record's map line, its length and five pieces (end points located by reverse geocoding with OpenStreetMap Nominatim)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.