Farmington Recreational Rail-Trail
Rail-trail in New Hampshire
Runs through Farmington and Rochester · Strafford County
Conditions now
Loading the weather near Rochester…
Forecast by the National Weather Service for Rochester · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Meetinghouse Hill Road mile 1.6 directions to trailhead 1
- Parking at Meetinghouse Hill Road mile 1.6 directions to trailhead 2
- Parking at State Route 153 mile 1.7 directions to trailhead 3
Plan your visit
- MapNew Hampshire rail trails pamphlet (PDF) New Hampshire State Parks
Links checked Oct 18, 2026. Sources: New Hampshire State Parks.
(opens in a new tab) About this trail
The Farmington Recreational Rail Trail is an unpaved state rail trail in Strafford County, New Hampshire, between Rochester and Farmington. It is managed by the New Hampshire Bureau of Trails and the New Hampshire Department of Transportation's Bureau of Rail and Transit, and the Powder Mill Snowmobile Club works with the Bureau of Trails to maintain it. Farmington was connected by railroad to Dover in 1849, and the line was extended to Alton Bay in 1851; this Cocheco Railroad line was leased by the Boston and Maine in 1863 and bought in 1892. An 1870 timetable of the Dover and Winnipiseogee Railroad lists stations at Rochester, Gonic and Farmington on its Dover–Alton Bay route. Train service to Alton Bay ended in 1935.
The state describes the trail as beginning at the intersection of Chestnut Hill Road and Route 125 in Rochester and running 6 miles to the former site of the Davidson Rubber Plant off Route 11 in Farmington, parallel to the Cocheco River and Route 11; the mapped trail is about 5.3 miles. Parking is at a small dirt pull-off at Hillsdale and Chestnut Hill Roads in Rochester and in a large lot beside the demolished rubber plant in Farmington. Near Rochester the trail passes under the Spaulding Turnpike, and a mill pond waterfall on the Rattlesnake River can be seen from it.
The surface is ballast and gravel, with loose stretches of sand and cinder. Listed uses are hiking, walking, bicycling and snowmobiling, and the trail is used mostly by snowmobiles in winter. A 2022 visit found it wide and clear of obstacles but with rocky and sandy sections suited to rugged bikes, and traffic noise from the adjacent roads for much of its length.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 96% of this route as a trail on former railroad right-of-way.
Farmington Branch and State of New Hampshire - Inactive. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
50% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Rochester Skyhaven Airport, 12.6 km from the trail's middle, 10 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 33 35 44 57 67 77 82 81 73 60 48 37 Low °F 15 17 25 35 45 54 60 58 50 39 31 22 Precipitation, in 2.5 2.2 3.7 3.7 3.5 3.9 3.5 3.2 3.4 4.4 3.9 3.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1919 Alton sheet (1:62,500); the 1957 Alton sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesNH Bureau of Trails — Trail Advisories and Closures
- RedditSearch Reddit: r/newhampshire
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Farmington Recreational Rail Trail — NH State Parks (NH Department of Natural and Cultural Resources) · government source · checked Oct 13, 2026 Supports: Chestnut Hill Road and Route 125 in Rochester to the former Davidson Rubber Plant off Route 11 in Farmington, 6 miles, parallels the Cocheco River and Route 11, Powder Mill Snowmobile Club works with the Bureau of Trails
- Farmington, New Hampshire — Wikipedia · organization · checked Oct 13, 2026 Supports: railroad to Dover 1849, extended to Alton Bay 1851
- Alton Bay station — Wikipedia · organization · checked Oct 13, 2026 Supports: Cocheco Railroad service to Alton Bay 1851, Boston and Maine lease 1863 and purchase 1892, train service to Alton Bay ended 1935
- Dover and Alton Bay — Nashua City Station Railroad History · organization · checked Oct 13, 2026 Supports: 1870 Dover and Winnipiseogee timetable with stations at Rochester, Gonic and Farmington
- Farmington Recreational Rail Trail — Trail Finder · web · checked Oct 13, 2026 Supports: managers (NH Bureau of Trails, NHDOT Bureau of Rail and Transit), ballast and gravel surface with sand and cinder, listed uses, snowmobile use in winter, trailhead parking at Hillsdale and Chestnut Hill Roads and beside the demolished Davidson Rubber Plant
- Rochester & Farmington Rail Trails, NH — Trailspotting (December 2022) · web · checked Oct 13, 2026 Supports: more popular as a snowmobile route, wide and clear but rocky and sandy sections, traffic noise, Rattlesnake River mill pond waterfall, passes under the Spaulding Turnpike
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.