States › Colorado

Firestone Trail

Rail-trail in Colorado

Runs through Firestone and Frederick · Weld County

Conditions now

Loading the weather near Firestone…

Forecast by the National Weather Service for Firestone · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.7 mi 7.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 1st Street mile 2.8 directions to trailhead 1
  2. Parking at 1st Street mile 2.8 directions to trailhead 2
  3. Parking at Colorado Boulevard mile 3 · restrooms directions to trailhead 3
  4. Parking at Colorado Boulevard mile 3 directions to trailhead 4
  5. Parking at West Grant Avenue mile 3.2 directions to trailhead 5
  6. Parking at Iris Parkway mile 3.5 directions to trailhead 6
  7. Parking at Colorado Boulevard mile 3.9 directions to trailhead 7
  8. Parking at Keyes Street mile 3.9 directions to trailhead 8
  9. Parking at Keyes Street mile 4 directions to trailhead 9
  10. Parking at Main Street mile 4.7 directions to trailhead 10
Frederick, along the trail (opens in a new tab)
Frederick, along the trail · Photo: Jared Winkler · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Firestone Trail is a paved path in Firestone, a statutory town in southwestern Weld County, Colorado. The town, named for landowner Jacob Firestone, opened its post office on August 30, 1907, and was incorporated on October 8, 1908. Wikipedia describes the Firestone/Legacy Trail as running for more than 12 miles, much of that distance along a railroad right-of-way that once served the coal industry; it does not name the railroad or give dates for the line.

This record covers about 4.7 miles of the trail as mapped in OpenStreetMap, running north and south through Firestone, with mapped parking areas off 1st Street and Colorado Boulevard near its middle.

HiiKER lists a Harney section of the trail at 8.9 km (about 5.5 miles), paved and point to point, rated easy and suited to road biking, running and walking. OpenStreetMap maps the path as an asphalt and concrete cycleway.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Longmont 2 ESE, 12.4 km from the trail's middle, 9 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444757637384918880665445
Low °F141726324150555446332414
Precipitation, in0.60.61.2221.81.71.91.310.80.5
Old maps

USGS topographic maps of the trail's middle go back to the 1902 Greeley sheet (1:125,000); the 1950 Gowanda sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Firestone, Colorado — Wikipedia · organization · checked Oct 17, 2026
    Supports: Weld County, town history and incorporation date, Firestone/Legacy Trail length over 12 miles along a former coal-industry railroad right-of-way
  3. Firestone Trail - Harney — HiiKER · web · checked Oct 17, 2026
    Supports: Harney section length, paved surface, point to point, uses
  4. Firestone Trail (way 48112689) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: mapped cycleway, asphalt and concrete surface, mapped length and parking

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.