States › Kansas

Flint Hills Trail

Rail-trail in Kansas · OpenStreetMap relation

Runs through Council Grove, Bushong, Allen, Admire, Osage City, Vassar, Ottawa, Osawatomie and 1 more · Morris, Lyon, Osage, Franklin and Miami counties

All 9 towns and places

Council Grove, Bushong, Allen, Admire, Osage City, Vassar, Ottawa, Rantoul and Osawatomie

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Flint Hills Trail is a hiking, biking, and equestrian trail in the Flint Hills region of eastern Kansas. The trail is 91 miles (146 km) long and reaches from the town of Osawatomie in the east to Council Grove in the west. A planned extension from Council Grove to Herington would make its length 118 miles (190 km).

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
92.5 mi 149 km1
On former railbed
87.8 mi 95%
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Flint Hills Nature Trail Osawatomie Parking mile 0 · restrooms directions to Flint Hills Nature Trail Osawatomie Parking
  2. Flint Hills Nature Trail Osawatomie Trailhead mile 0 · restrooms directions to Flint Hills Nature Trail Osawatomie Trailhead
  3. Parking mile 0 · restrooms directions to trailhead 3
  4. Flint Hills Nature Trail Rantoul Parking mile 9.1 directions to Flint Hills Nature Trail Rantoul Parking
  5. Flint Hills Nature Trail Rantoul Trailhead mile 9.1 directions to Flint Hills Nature Trail Rantoul Trailhead
  6. Parking at South Hickory Street mile 20 directions to trailhead 6
  7. Parking at South Hickory Street mile 20 directions to trailhead 7
  8. Parking at South Cedar Street mile 20 directions to trailhead 8
  9. Parking at West 1st Street mile 20.1 · restrooms · water directions to trailhead 9
  10. Parking at North Main Street mile 20.1 · restrooms · water directions to trailhead 10
  11. Parking at North Main Street mile 20.1 · restrooms · water directions to trailhead 11
  12. Parking at South Main Street mile 20.1 · restrooms · water directions to trailhead 12
  13. Parking at South Main Street mile 20.1 · restrooms · water directions to trailhead 13
  14. Flint Hills Trail Ottawa Trailhead mile 20.2 · restrooms · water directions to Flint Hills Trail Ottawa Trailhead
  15. Flint Hills Trail Pomona Trailhead mile 30.5 · restrooms directions to Flint Hills Trail Pomona Trailhead
  16. Flint Hills Trail Pomona Trailhead Parking mile 30.5 · restrooms directions to Flint Hills Trail Pomona Trailhead Parking
  17. Parking at Market Street mile 52.2 directions to trailhead 17
  18. Parking at North 5th Street mile 52.4 directions to trailhead 18
  19. Parking at Holliday Street mile 52.4 directions to trailhead 19
  20. Flint Hills Trail Miller Trailhead mile 61.8 · restrooms directions to Flint Hills Trail Miller Trailhead
  21. Flint Hills Trail Miller Trailhead Parking mile 61.8 · restrooms directions to Flint Hills Trail Miller Trailhead Parking
  22. Flint Hills Trail Admire Trailhead mile 68.1 · restrooms directions to Flint Hills Trail Admire Trailhead
  23. Flint Hills Trail Admire Trailhead Parking mile 68.1 · restrooms directions to Flint Hills Trail Admire Trailhead Parking
  24. Flint Hills Trail Allen Trailhead mile 72 directions to Flint Hills Trail Allen Trailhead
  25. Flint Hills Trail Allen Trailhead mile 72 directions to Flint Hills Trail Allen Trailhead
  26. Flint Hills Trail Bushong Trailhead Parking mile 77.2 · restrooms directions to Flint Hills Trail Bushong Trailhead Parking
  27. Flint Hills Trail Bushong Trailhead mile 77.3 directions to Flint Hills Trail Bushong Trailhead
  28. Flint Hills Trail Council Grove Trailhead mile 91.7 directions to Flint Hills Trail Council Grove Trailhead
  29. Flint Hills Trail Council Grove Trailhead Parking mile 91.7 directions to Flint Hills Trail Council Grove Trailhead Parking
  30. Parking at Wood Street mile 92.2 directions to trailhead 30
  31. Parking at Wood Street mile 92.3 directions to trailhead 31
  32. Parking at South Neosho Street mile 92.3 directions to trailhead 32
  33. Parking at South Neosho Street mile 92.3 directions to trailhead 33

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

Flint Hills Trail (opens in a new tab)
Photo: toebee · CC BY-SA 4.0 · Mapillary

About this trail

The Flint Hills Trail is a rail-trail across east-central Kansas, open from Osawatomie west to Council Grove, a distance of about 92 miles; an extension to Herington would bring it to 118 miles. The Kansas legislature designated it Flint Hills Trail State Park in 2018, and the Kansas Department of Wildlife and Parks now manages it; the U.S. Department of the Interior named it a National Recreation Trail in 2020, and Rails to Trails Conservancy added it to its Hall of Fame in 2025. It forms part of the American Discovery Trail and partly traces the Santa Fe National Historic Trail.

The corridor was developed in the late 1880s as the Council Grove, Osage City & Ottawa Railway and later became part of the Missouri Pacific Railroad, which ended service on the line in the 1980s. Rails to Trails Conservancy acquired and railbanked the corridor in 1995 and transferred it to the Kanza Rail-Trails Conservancy, whose volunteers built about 60 miles of trail in sections before the state took over completion. In 2022 Kansas received a $24.8 million federal RAISE grant to improve 40.5 miles of the trail and open the 27 miles from Council Grove to Herington.

From Osawatomie the trail follows the Marais des Cygnes River through Rantoul to Ottawa, where it meets the Prairie Spirit Trail at 1st and Walnut streets. It continues west through Pomona, Vassar, Osage City, Miller, Admire, Allen and Bushong to Council Grove, with parking at each town; the Council Grove access points include Allegawaho Heritage Memorial Park, which honors the history of the Kaw Nation. The surface is mostly crushed rock, with a short dirt section west of US 75 near milepost 44 that can turn muddy, and a busy crossing of K-68 near milepost 26.9. The trail is open to non-motorized users and horses from sunrise to sunset all year and is free.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 81% of this route as a trail on former railroad right-of-way.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April, June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Osage City, 6.6 km from the trail's middle, 8 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404556657484898880695443
Low °F182232425463676556443221
Precipitation, in0.81.72.645.64.94.24.33.53.22.41.6
Snow, in2.43.71.50.1000000.10.62
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1889 Burlingame sheet (1:125,000); the 1965 Lyndon NW sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in October 2025 said public camping is limited to town stops and parks, listing Pomona, Osage City, Admire, Allen, Allegawaho and Council Grove; a private campground sits in Allen. r/kansas, Oct 2025
  • Riders in late 2025 warned that water along the route can be scarce; one said Allegawaho has only a small creek, with Council Grove a few miles further for refills. r/kansas, Oct 2025
  • One rider in November 2026 described Ottawa as a good start for a short overnighter to Pomona Lake, with a free, covered, lit lot where a car can stay for days. r/bikepacking, Nov 2026
  • Riders in 2025 and 2026 singled out the stretch from Allegawaho Park toward Bushong as especially scenic, with long prairie sections away from roads and a long bridge over Rock Creek. r/kansas, Apr 2025 · r/kansas, Feb 2026
15 Reddit threads about this trail, May 2024 to Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1627174, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Flint Hills Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q141686731, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Davids, Miami County Community Celebrate $24 Million Federal Grant for Flint Hills Trail Expansion — Representative Sharice Davids · government source · checked Oct 18, 2026
    Supports: $24,821,705 RAISE grant (2022) to improve 40.5 miles and open 27 miles from Council Grove to Herington
  5. Flint Hills Trail — Kanza Trails (Kanza Rail-Trails Conservancy) · organization · checked Oct 18, 2026
    Supports: 118-mile planned length, Osawatomie to Herington, towns, state park designation and KDWP management, railroad history (Council Grove, Osage City & Ottawa Railway; Missouri Pacific; 1980s end of service; 1995 railbanking; transfer to KRTC; 60 miles built by volunteers), American Discovery Trail and Santa Fe Trail, Ottawa junction with Prairie Spirit Trail at 1st and Walnut, access points, condition report (milepost 44 dirt section, K-68 crossing, Council Grove to Herington undeveloped), sunrise-to-sunset hours, free, non-motorized and horses
  6. Kansas' Flint Hills Trail State Park Recognized as Hall of Fame Trail — Rails to Trails Conservancy · organization · checked Oct 18, 2026
    Supports: 2018 legislative state park designation, 2020 National Recreation Trail, 2025 Hall of Fame, Allegawaho Heritage Memorial Park and Kaw Nation, partial route of Santa Fe National Historic Trail
  7. Flint Hills Trail — Wikipedia · organization · checked Oct 18, 2026
    Supports: route along the Marais des Cygnes River from Osawatomie toward Ottawa, mostly crushed-rock surface with some dirt

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.