Florence Rail Trail
Rail-trail in South Carolina · OpenStreetMap relation
Runs through Florence · Florence County
Conditions now
Loading the weather near Florence…
Forecast by the National Weather Service for Florence · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Lowe's mile 0.2 directions to Lowe's
- Parking at Harvard Way mile 2 directions to trailhead 2
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Florence Rail Trail is a paved rail-trail in Florence, South Carolina, managed by the City of Florence Recreation Department. South Carolina's state tourism office identifies the line it follows as the Wilmington & Manchester railroad. The main trail is about 2 miles long, and SC Trails counts about 5 miles with its other sections and connectors; the city describes the wider Rail Trail system as more than 20 miles of trails.
The main trail starts in the Ebenezer Park neighborhood off Old Ebenezer Road and runs under tree cover, crossing Jeffries Creek, to the McLeod Health & Fitness Center, where a packed-dirt nature loop continues through the woods. Restrooms are at Ebenezer Park, just past the sharp curve on Old Ebenezer Road, and parking is at the trail's post-and-rail fence and at the McLeod Fitness Center. On September 4, 2025, the city opened an extension of about 1 mile that begins at the boardwalk beside the Florence Soccer Complex, 1000 Soccer Way, linking the Rail Trail with roughly 2.5 miles of trails at the complex. This record maps about 2.4 miles of the system as a single OpenStreetMap route.
SC Trails lists the surface as paved, with boardwalk and natural-surface sections, and the trail as open dawn to dusk for hiking and biking.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
67% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Florence Regional Airport, 9.9 km from the trail's middle, 10 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 57 61 68 77 84 89 92 90 85 77 67 59 Low °F 36 39 44 52 61 69 72 71 66 54 44 38 Precipitation, in 3.1 3 3.2 3 3.7 4.6 5.8 4.9 4.5 3.4 2.6 3.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1940 Florence West sheet (1:62,500); the 1945 Florence West sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Rail Trail within 0.2 mi · 0.9 mi, paved
- Veterans Park Trail within 0.2 mi · 1.3 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 16220579, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City of Florence to Host Ribbon-Cutting Ceremony for New Rail Trail Extension — City of Florence, SC (August 28, 2025) · government source · checked Oct 16, 2026 Supports: ribbon cutting September 4, 2025; extension about one mile, beginning at the boardwalk beside the Florence Soccer Complex, 1000 Soccer Way; links the Rail Trail's more than 20 miles of trails with roughly 2.5 miles at the Soccer Complex
- Florence Rail Trail — SC Trails (South Carolina Department of Parks, Recreation & Tourism) · web · checked Oct 16, 2026 Supports: 5.00 miles total, main trail about two miles with other sections and connectors; paved, boardwalk, natural; out-and-back hiking/biking rail trail; parking at the post-and-rail fence and McLeod Fitness Center; restrooms at Ebenezer Park past the sharp curve on Old Ebenezer Road; manager City of Florence Recreation Department; dawn to dusk
- 10 of the Best SC Rail Trails — Discover South Carolina (SC Department of Parks, Recreation & Tourism) · web · checked Oct 16, 2026 Supports: Wilmington & Manchester railroad line; 2 miles with a connecting nature loop; starts in the Ebenezer Park neighborhood, crosses Jeffries Creek to the McLeod Health & Fitness Center; packed-dirt loop through the woods
- Florence Rail Trail, relation 16220579 — OpenStreetMap · web · checked Oct 16, 2026 Supports: record length about 2.4 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.