States › Wisconsin

Flyway Trail

Rail-trail in Wisconsin, crossing into Minnesota · OpenStreetMap relation

Runs through Winona (MN) and Town of Buffalo (Buffalo County) · Winona County (MN) and Buffalo County

Conditions now

Loading the weather near Winona…

Forecast by the National Weather Service for Winona · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.4 mi 7.1 km1
On former railbed
3.6 mi 83%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. RIver Bottoms Trailhead mile 2.1 directions to RIver Bottoms Trailhead

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Main Channel Bridge, beside the trail (opens in a new tab)
Main Channel Bridge, beside the trail · Photo: Andrew Baugnet · Public domain · Wikimedia Commons

About this trail

The Flyway Trail is a trail that crosses the Mississippi River between Winona, Minnesota, and Buffalo County, Wisconsin, and continues in Wisconsin to Marshland, where it links to the Great River State Trail. It was built by Flyway Trail, a community nonprofit in Buffalo County formerly called the Buffalo County Land & Trails Trust. The group's long-term goal is a low-stress trail of about 50 miles along the Mississippi River Trail route through Buffalo County, reaching north toward Alma.

The trail starts in Winona at Highway 43 and West 4th Street, crosses the river on the Interstate Bridge and the historic John A. Latsch wagon bridge to Latsch Island, and passes Aghaming Park, about 1,950 acres of floodplain forest. It then rises over the BNSF Railway on a new 842-foot bridge and crosses wetlands on raised boardwalks to Buffalo Town Park on Wisconsin Highway 35 near Fountain City. This first phase, just over a mile from the wagon bridge to Highway 35, opened in June 2020. TrailLink lists asphalt, concrete, boardwalk and crushed stone surfaces. Parking is at the Latsch Island beach area in Winona and at Buffalo Town Park.

The second phase, a paved path from Buffalo Town Park to Marshland, was completed in August 2025. A planned crossing of the railroad near Marshland had not been approved by the Canadian National Railway, so the trail ends about 250 feet short of the tracks, where a wider roadway crosses them; an entrance to the Trempealeau National Wildlife Refuge is just across. The two phases cost $4.5 million, paid for by federal grants, other public funds and more than $1 million in private donations. The trail is not plowed or maintained in winter.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Winona Dam 5 A, 5.8 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F253042566978828173594431
Low °F81124364859636154412916
Precipitation, in1.111.93.64.14.84.14.53.62.51.91.2
Snow, in9.89.35.71.60.200000.11.49.5
Wildlife refuges

Passes beside Upper Mississippi River National Wildlife and Fish Refuge.

Passes beside Trempealeau National Wildlife Refuge.

Old maps

USGS topographic maps of the trail's middle go back to the 1929 Fountain City sheet (1:62,500); the 1953 Eau Claire sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12638941, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Flyway Bridge is open in Winona — News 8000 (WKBT) · press · checked Oct 15, 2026
    Supports: Flyway Bridge links Latsch Island with Buffalo Town Park in Buffalo County and carries the trail over the railway
  3. Flyway Trail — Community-Driven Non-Profit Startup in Buffalo County, WI · web · checked Oct 15, 2026
    Supports: trail paved and open to Marshland; ends 250 feet from the railroad tracks with a wider roadway across; Trempealeau National Wildlife Refuge entrance across the tracks; not plowed or maintained in winter
  4. About — Flyway Trail · web · checked Oct 15, 2026
    Supports: former name Buffalo County Land & Trails Trust; goal of a 50-mile low-stress trail through Buffalo County on the Mississippi River Trail; BNSF bridge and section to Buffalo Town Park funded by state and federal grants
  5. Directions — Flyway Trail · web · checked Oct 15, 2026
    Supports: parking at the Latsch Island beach area and route over the old wagon bridge past Aghaming Park; Buffalo Town Park trailhead at W301 Wis 35, Fountain City
  6. Flyway Trail Winona Connector — Visit Winona · web · checked Oct 15, 2026
    Supports: Interstate Bridge, John A. Latsch wagon bridge and new 842-foot bridge over the BNSF railroad; just over 1 mile from the wagon bridge to WI-35; opened June 2020; Aghaming Park 1,950 acres of floodplain forest; phase two completed August 2025 linking to the Great River State Trail; $4.5 million cost and funding sources; Canadian National crossing not approved; long-term goal toward Alma
  7. Flyway Trail — TrailLink · web · checked Oct 15, 2026
    Supports: southern endpoint at Hwy 43 and W 4th St in Winona; surfaces asphalt, boardwalk, concrete and crushed stone; raised boardwalks through wetlands

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.