Foothills Parkway Multi-Use Path
Greenway in Colorado
Runs through Boulder · Boulder County
Conditions now
Loading the weather near Boulder…
Forecast by the National Weather Service for Boulder · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Thunderbird Court East mile 0.8 directions to trailhead 1
- Parking at Manhattan Place mile 0.8 directions to trailhead 2
- Parking at Baseline Road mile 0.9 directions to trailhead 3
- Parking at The Meadows mile 0.9 directions to trailhead 4
- Parking at The Meadows mile 0.9 directions to trailhead 5
- Parking at Baseline Road mile 0.9 directions to trailhead 6
- Parking at The Meadows mile 0.9 · restrooms · water directions to trailhead 7
(opens in a new tab) About this trail
The Foothills Parkway Multi-Use Path is a paved path in east Boulder, Colorado, that runs beside Foothills Parkway from the Table Mesa Drive and Baseline Road area in the south, past Arapahoe and Colorado avenues, to Pearl Parkway in the north. It is not a rail-trail. The name comes from OpenStreetMap, which maps about 2.4 miles in a dozen pieces, so the route shown here is broken in places.
The path is concrete and mostly 10 feet wide, designated for both cyclists and pedestrians. It passes Bear Creek, Goose Creek and several irrigation ditches, including the Wellman Canal, and OpenStreetMap maps a series of bridges and underpasses that carry it past waterways and under cross streets.
One of those underpasses replaced a pedestrian overpass on the parkway south of Colorado Avenue. Construction began in September 2019; the city was replacing a bridge at the end of its service life that did not meet current ADA or bike facility guidelines, at a cost of $4.4 million, $3.2 million of it federal transportation funds and $1.2 million city transportation funds, and officials expected the work to take about a year. The old overpass was removed during a weekend closure of Foothills Parkway between Baseline Road and Arapahoe Avenue on November 2 and 3, 2019.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Boulder, 3 km from the trail's middle, 69 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 47 48 57 63 71 82 88 86 79 66 54 46 Low °F 22 22 29 34 43 51 57 56 48 37 28 21 Precipitation, in 0.8 1 2 3 3.2 1.9 1.8 1.7 2.1 1.6 1.2 0.8 Snow, in 11.3 15 15.7 14.7 2 0 0 0 1 7 13.1 13 - Old maps
USGS topographic maps of the trail's middle go back to the 1904 Niwot sheet (1:62,500); the 1951 Niwot sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Centennial Trail within 0.2 mi · 8.4 mi, paved
- Boulder Creek Path within 0.2 mi · 5.4 mi, paved
- Wellman Canal Path within 0.2 mi · 0.6 mi, paved
- Goose Creek Greenway within 0.2 mi · 2.3 mi, paved
- Bear Creek Greenway within 0.2 mi · 2.2 mi, paved
- Longmont-to-Boulder (LOBO) Regional Trail within 0.2 mi · 11.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Foothills Parkway to close this weekend for overpass removal — CU Boulder Today · organization · checked Oct 17, 2026 Supports: pedestrian overpass south of Colorado Avenue removed; parkway closed between Baseline Road and Arapahoe Avenue on November 2–3, 2019
- Construction Begins On Boulder's Foothills Parkway Underpass — Patch · press · checked Oct 17, 2026 Supports: construction began September 2019; bridge at end of service life, not meeting ADA or bike facility guidelines; $4.4 million cost; $3.2 million federal and $1.2 million city funds; about one year to complete
- Foothills Parkway Multi-Use Path (way 33869166) — OpenStreetMap · web · checked Oct 17, 2026 Supports: name; route beside Foothills Parkway from Table Mesa Drive and Baseline Road past Arapahoe and Colorado avenues to Pearl Parkway; about 2.4 miles in pieces; concrete, 10 feet wide; designated for cyclists and pedestrians; Bear Creek, Goose Creek, Wellman Canal and other ditches; bridges and underpasses
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.