States › California

Foss Creek Pathway

Greenway in California

Runs through Healdsburg · Sonoma County

Conditions now

Loading the weather near Healdsburg…

Forecast by the National Weather Service for Healdsburg · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.5 mi 4.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Healdsburg Avenue mile 0.1 directions to trailhead 1
  2. Parking at Dry Creek Road mile 0.6 directions to trailhead 2
  3. Parking at Vine Street mile 1.7 · restrooms directions to trailhead 3
  4. Parking at Healdsburg Avenue mile 1.9 · water directions to trailhead 4
  5. Parking at Vine Street mile 1.9 directions to trailhead 5
  6. Parking at Healdsburg Avenue mile 2 directions to trailhead 6
  7. Parking at Mill Street mile 2 directions to trailhead 7
Foss Creek Pathway in Healdsburg, July 2022 (opens in a new tab)
Foss Creek Pathway in Healdsburg, July 2022 · Photo: Pi.1415926535 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Foss Creek Pathway is a paved, off-street (Class I) path for walking and cycling along Foss Creek in Healdsburg, Sonoma County, California. It follows the former Northwestern Pacific Railroad line. The Healdsburg Tribune reported in September 2023 that it runs from Front Street to the Healdsburg Community Center, passes through the former Healdsburg Depot on Hudson Street, and is 4.1 miles (6.6 km) long. The paper's November 2023 report described the pre-existing 2.4 miles (3.9 km) of the pathway, walked from City Hall at North and Grove streets south to its current end where the railroad tracks cross Front Street, and said the in-city pathway would total 2.58 miles (4.2 km) when finished. Construction began in the downtown area in 2006. By September 2023, $5.79 million had been spent on construction, with Sonoma County's Measure M paying $3.25 million.

The Tribune's April 2023 report called the pathway part of the SMART Pathways system and among the first completed legs of the Great Redwood Trail; in September 2023 it described that trail as a 320-mile bike path linking San Francisco and Arcata. In November 2023 the paper reported that recent grants had opened the way to rebuild the old railroad bridge over the Russian River with a parallel pedestrian-bicycle path, and that the SMART project would add more than four miles of designed pedestrian pathway alongside the rail line.

In September 2023 the Tribune reported a third of a mile under construction as part of private development at North Village, and a final half-mile to be built within the Healdsburg Avenue Complete Streets Project, scheduled for construction in 2026. This record maps about 2.5 miles (4.0 km), in several pieces. OpenStreetMap tags the mapped path as asphalt and designated for bicycles and pedestrians.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 97% of this route as an out-of-service rail line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Healdsburg, 1.4 km from the trail's middle, 19 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F586266727986898885776557
Low °F394143455054545452484339
Precipitation, in88.36.32.91.60.3000.12.24.58.5
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1920 Healdsburg sheet (1:62,500); the 1955 Healdsburg sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Foss Creek Pathway Wins Award from Bicycle Coalition — Healdsburg Tribune · press · checked Oct 31, 2026
    Supports: 4.1-mile mixed-use Class I path from Front Street to the Healdsburg Community Center; paved path along Foss Creek and the former Northwestern Pacific Railroad line; runs through the former Healdsburg Depot on Hudson Street; $5,788,000 spent on construction, $3,250,000 of it from Sonoma County Tax Measure M; a third of a mile under construction at North Village; final half-mile in the Healdsburg Avenue Complete Streets Project scheduled for construction in 2026; Great Redwood Trail described as a 320-mile bike path linking San Francisco and Arcata
  3. Healdsburg at the Crossroads as SMART Meets GRT — Healdsburg Tribune · press · checked Oct 31, 2026
    Supports: pre-existing 2.4 miles of the Foss Creek Pathway; walk from City Hall at North and Grove streets south to the trail's current end where the railroad tracks cross Front Street; in-city pathway to total 2.58 miles; grants for reconstructing the old railroad bridge over the Russian River with a parallel pedestrian-bicycle path; SMART project to add more than four miles of pedestrian pathway alongside the rail line
  4. Great Redwood Trail Heads for the Border — Healdsburg Tribune · press · checked Oct 31, 2026
    Supports: Foss Creek Pathway is part of the SMART Pathways and the Great Redwood Trail; one of the first completed legs of the Great Redwood Trail
  5. Healdsburg pathway set to grow — The Press Democrat · press · checked Oct 31, 2026
    Supports: construction of the trail began in 2006 in the downtown area
  6. Foss Creek Pathway — OpenStreetMap way 425239393 · web · checked Oct 31, 2026
    Supports: name Foss Creek Pathway; highway=cycleway, surface=asphalt, bicycle=designated, foot=designated

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.