States › Ohio

Franklin Township Greenway Trail

Greenway in Ohio · OpenStreetMap relation

In Mercer County

Conditions now

Loading the weather near Montezuma…

Forecast by the National Weather Service for Montezuma · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.1 mi 8.2 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at County Road 219A mile 0.1 directions to trailhead 1
  2. Parking at Karafit Road mile 1.8 directions to trailhead 2
  3. Parking at Karafit Road mile 1.8 directions to trailhead 3
  4. Parking at Club Island Road mile 4.8 directions to trailhead 4
  5. Parking at Club Island Road mile 4.8 directions to trailhead 5
Franklin Township, along the trail (opens in a new tab)
Franklin Township, along the trail · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Franklin Township Greenway Trail is a paved path in Franklin Township, Mercer County, in western Ohio, on the south side of Grand Lake St. Marys. The township trustees built it in several sections beginning in 2003. The work grew out of a community land use plan drawn up around 1999, which found that residents wanted public natural areas and bicycle and pedestrian access around the south side of the lake. By 2008 the township had secured $3 million in state and federal grants and $500,000 in private contributions and had bought about 200 acres of greenspace.

As described in 2008, the path started at Zuma Park in Montezuma, just north of the Catholic church, and ran to State Route 219 and the old Franklin Elementary School, then turned north along Route 219 and followed Windy Point Road into the state park area. A spur ran east along Route 219 to Karafit Road and the 45-acre Franklin Township Nature Park. A $500,000 extension planned that year, paid for with grants, private contributions and township matching funds, was to run from the nature park east to Kittle Road, south across Route 219 and on to Strassburg Park at Club Island Road, for a total of 6 miles of paved path. The township also bought the 80-acre Franklin Township Nature Sanctuary in 2006 and 2007.

In 2012 The Daily Standard listed the trail at 6.5 paved miles and noted that it passes under a covered bridge along Route 219. Parking areas included Zuma Park and the former Franklin elementary school on Route 219 in Montezuma, Strassburg Park at Club Island Road, Gilliland Nature Sanctuary on Club Island Road, Harrison Road between Routes 219 and 219A, the nature park on Karafit Road and Windy Point state park. The record here maps about 5.1 miles from County Road 219A near Montezuma east to Club Island Road.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Celina 3 NE, 7.6 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343849637381848277655038
Low °F192230405160636154443324
Precipitation, in2.82.32.93.944.44.63.62.82.93.12.6
Snow, in10.87.14.10.5000000.11.34.9
Old maps

USGS topographic maps of the trail's middle go back to the 1914 Celina sheet (1:62,500); the 1960 Celina sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2552394, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Bike path extension and nature sanctuary planned — The Daily Standard (2008-03-31) · press · checked Oct 14, 2026
    Supports: built in sections from 2003 by township trustees, land use plan about nine years earlier, $3 million in grants, $500,000 private, about 200 acres, 2008 route (Zuma Park, Route 219, old Franklin Elementary, Windy Point Road, spur to Karafit Road and 45-acre nature park), $500,000 extension to Kittle Road and Strassburg Park, 6 miles total, 80-acre sanctuary bought 2006 and 2007
  3. Slowing it down — The Daily Standard (2012-07-31) · press · checked Oct 14, 2026
    Supports: 6.5 paved miles, south side of Grand Lake, covered bridge along Route 219, parking areas
  4. Franklin Township Greenway Trail — OpenStreetMap relation 2552394 · web · checked Oct 14, 2026
    Supports: record extent from County Road 219A to Club Island Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.