Friendly City Trail
Greenway in Virginia · OpenStreetMap relation
Runs through Harrisonburg
Conditions now
Loading the weather near Harrisonburg…
Forecast by the National Weather Service for Harrisonburg · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Harrisonburg Department of Public Works.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Friendly City Trail is a 2.2-mile shared-use path on the west side of Harrisonburg, Virginia, built by the City of Harrisonburg. It connects three schools, two parks and several residential neighborhoods, and the city describes it as used by walkers, joggers and bicyclists for both transportation and recreation. This record maps about 2.6 miles.
The project began in 2015, when Christopher Jones was mayor, and after seven years of meetings and construction delays the trail officially opened in late May 2022, when Mayor Deanna Reed and members of City Council cut a ribbon on a new bridge in Hillandale Park. The new trail extended an existing path at Westover Park. In 2023 it won the American Public Works Association Mid-Atlantic Chapter's Project of the Year award for transportation projects under $5 million, an award accepted by the city's Public Works department.
The trail links Harrisonburg High School and Bluestone Elementary School with Thomas Harrison Middle School and Westover Park. South of the middle school it runs between Heritage Oaks Golf Course on the west and Rocktown Trails and Hillandale Park on the east, then reaches the high school and elementary school campuses. The city rates it easy, with a hard surface, short on-street connections, 280 feet of elevation change and grades of up to 6 percent. Parking is at Hillandale Park and Westover Park.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
27% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Dale Enterprise, 3.6 km from the trail's middle, 10 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 42 46 54 65 74 82 86 84 78 67 56 46 Low °F 23 24 30 40 50 60 64 62 55 43 32 26 Precipitation, in 2.7 2.2 3.2 3.3 4 3.9 4.1 3.8 3.7 2.5 2.6 2.9 Snow, in 4.2 6.2 4.5 0.1 0 0 0 0 0 0.2 0.6 3.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1892 Harrisonburg sheet (1:125,000); the 1964 Bridgewater sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesBiking and Walking Paths — City of Harrisonburg
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13437196, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Biking and Walking Paths — City of Harrisonburg · government source · checked Oct 14, 2026 Supports: 2.2-mile shared-use path, schools and parks connected, Heritage Oaks Golf Course and Hillandale Park, hard surface with short on-street connections, users, difficulty, elevation change and grades, parking
- Opening of new trail marks milestone in city's recreation transformation — The Harrisonburg Citizen (May 26, 2022) · web · checked Oct 14, 2026 Supports: official opening, ribbon cutting on a new bridge in Hillandale Park, seven years of meetings and construction delays, project begun in 2015 under Mayor Christopher Jones, Mayor Deanna Reed, extension of the existing Westover Park trail, route between Heritage Oaks and Rocktown Trails and Hillandale Park to the high school and Bluestone Elementary
- Harrisonburg's Friendly City Trail awarded Project of the Year — WHSV (February 1, 2023) · web · checked Oct 14, 2026 Supports: 2023 APWA Mid-Atlantic Chapter Project of the Year award (Transportation Less than $5 Million), three schools, two parks and neighborhoods on the west side, Public Works department
- Friendly City Trail — OpenStreetMap relation 13437196 · web · checked Oct 14, 2026 Supports: record extent
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.