Fruita West Bikepath
Greenway in Colorado
Runs through Fruita · Mesa County
Conditions now
Loading the weather near Fruita…
Forecast by the National Weather Service for Fruita · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0 directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Fruita West Bikepath is a paved bike path of about 1.4 miles west of Fruita, Mesa County, Colorado, in the Loma area. The name comes from OpenStreetMap, which maps it as a single cycleway running roughly east to west beside Interstate 70, north of the highway, with the Colorado River on its far side, and passing near a wastewater reclamation facility. At its west end it continues as a path OpenStreetMap names the Fruita-Loma Bikepath. OpenStreetMap also places it on the American Discovery Trail's Colorado route.
The path lies in the corridor where Mesa County's Riverfront program aims to complete a trail network along the Colorado River from Loma in the west to Palisade in the east. In 2018 the City of Fruita was finishing a 4.5-mile concrete extension of the Riverfront trail from Fruita toward Loma and the Kokopelli trailhead, with a ribbon cutting planned for that August; no source found confirms whether this path is part of that extension. No City of Fruita or Mesa County page naming the Fruita West Bikepath was found, so its manager is not given here.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Fruita, 6 km from the trail's middle, 13 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 39 47 59 67 78 89 95 92 83 69 54 40 Low °F 15 21 29 35 45 52 60 58 48 36 25 16 Precipitation, in 0.8 0.8 0.9 0.9 0.8 0.6 0.7 0.8 1.1 1.2 0.7 0.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1956 Grand Junction sheet (1:250,000); the 1962 Mack sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Riverfront Trail 1.4 mi away · 21.4 mi, paved
- Fruita Trail 1.5 mi away · 2.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- One Riverfront Trail System — Mesa County · government source · checked Oct 17, 2026 Supports: aim to complete the Riverfront Trail network from Loma on the west to Palisade on the east along the Colorado River
- Trail to connect Grand Junction, Fruita to Kokopelli trailhead — KJCT8 (June 18, 2018) · web · checked Oct 17, 2026 Supports: City of Fruita's 4.5-mile concrete extension toward Loma and the Kokopelli trailhead, ribbon cutting planned for August 2018
- OpenStreetMap ways 618071896 and 618071897 (Fruita West Bikepath) — OpenStreetMap · web · checked Oct 17, 2026 Supports: name, paved cycleway, position north of I-70 with the Colorado River south of the highway, wastewater reclamation facility nearby, continuation as the Fruita-Loma Bikepath (way 1283422211), American Discovery Trail route relation 9109178
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.