States › North Carolina

Gary Shell Cross City Trail

Greenway in North Carolina · OpenStreetMap relation

Runs through Wilmington · New Hanover County

Conditions now

Loading the weather near Wilmington…

Forecast by the National Weather Service for Wilmington · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
13.0 mi 20.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Bethal Road mile 0 directions to trailhead 1
  2. Parking at Waltmoor Road mile 0.8 directions to trailhead 2
  3. Parking at Waltmoor Road mile 0.8 directions to trailhead 3
  4. Parking at South 17th Street mile 1 directions to trailhead 4
  5. Parking at Independence Boulevard mile 3 directions to trailhead 5
  6. Parking at Independence Boulevard mile 3.1 directions to trailhead 6
  7. Parking at South Canterbury Road mile 4.5 directions to trailhead 7
  8. Parking at South Canterbury Road mile 4.5 directions to trailhead 8
  9. Parking at South Canterbury Road mile 4.6 directions to trailhead 9
  10. Parking at Randall Parkway mile 6.9 directions to trailhead 10
  11. Lot B mile 8.4 directions to Lot B
  12. Lot K mile 8.7 directions to Lot K
  13. Parking at Seahawk Square mile 8.8 directions to trailhead 13
  14. Parking at Hamilton Drive mile 9 directions to trailhead 14
  15. Field Parking mile 9.3 directions to Field Parking
  16. Lot J mile 9.4 directions to Lot J
  17. Lot AA mile 9.6 directions to Lot AA
  18. Lot BB mile 9.6 directions to Lot BB
  19. Lot CC mile 9.7 directions to Lot CC
Wilmington, along the trail (opens in a new tab)
Wilmington, along the trail · Photo: Jason W. Smith · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Gary Shell Cross-City Trail is a 15-mile, primarily off-road multi-use trail across Wilmington, North Carolina, from James E. L. Wade Park in south Wilmington to the drawbridge at Wrightsville Beach. It was developed by the City of Wilmington with money from the 2006 Parks and Greenspace Bond, a $35.5 million joint bond with New Hanover County, along with federal, state and private funds. It is named for Gary Shell, the city's former Director of Parks and Recreation and Deputy Director of Community Services, who championed the bond and the trail and died on May 12, 2011. The trail carries a section of the East Coast Greenway.

In 2007 the city planned to link existing paths into one paved trail through city parks, school grounds, the Cameron Art Museum and the University of North Carolina Wilmington. A 3.4-mile third phase around the university was finished in October 2011, bringing more than 6 of the 15 miles into use. The last major section, a 1.3-mile path on 17th Street from John D. Barry Drive to Wade Park, with new sidewalks and bike lanes on Waltmoor and Bethel roads, opened in September 2015. Fourteen of the 15 miles were then complete; short pieces remained near the Wrightsville Beach drawbridge and at Kerr Avenue and Randall Parkway, the latter tied to the state's Kerr Avenue widening.

Blue Cross and Blue Shield of North Carolina gave $550,000 for mile markers, five bicycle fix-it stations, a kiosk at Wade Park and paving. This record maps about 13 miles in several pieces, from Wade Park north across the city and through the university campus to its eastern end near Wrightsville Beach; on-street bike-lane links are not all on its line.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

20% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Wilmington International Airport, 5.7 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F576066758187908884766760
Low °F363844536169737267564539
Precipitation, in3.83.543.14.55.76.98.28.74.73.63.7
Snow, in0.70.20000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1942 Wilmington sheet (1:62,500); the 1948 Wilmington sheet (1:62,500) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9721958, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Phase 3 of Gary Shell Cross-City Trail completes this week — WHQR · organization · checked Oct 16, 2026
    Supports: 3.4-mile Phase 3 around UNCW completed in October 2011; more than 6 of 15 miles finished; route from Wade Park to the drawbridge at Wrightsville Beach
  3. Wilmington plans Cross-City Trail — WHQR · organization · checked Oct 16, 2026
    Supports: 2007 plan linking existing paths into a single paved trail through city parks, school grounds, the Cameron Art Museum and UNCW
  4. Final major section of the Gary Shell Cross-City Trail opens to the public — Port City Daily · press · checked Oct 16, 2026
    Supports: 15-mile primarily off-road multi-use trail from J.E.L. Wade Park to Wrightsville Beach; 2006 Parks and Greenspace Bond, $35.5 million joint bond with the county; Gary Shell's roles; East Coast Greenway section; final 1.3-mile section from John D. Barry Drive to Wade Park
  5. Cross-City Trail nears completion as officials applaud latest phase — Port City Daily · press · checked Oct 16, 2026
    Supports: 17th Street path, sidewalks and bike lanes on Waltmoor and Bethel roads, opened in September 2015; federal, state and private funding; BCBSNC $550,000 for mile markers, five fix-it stations, a Wade Park kiosk and paving; 14 of 15 miles complete; remaining pieces near the drawbridge and at Kerr Avenue and Randall Parkway with the NCDOT Kerr Avenue widening; Gary Shell died May 12, 2011
  6. Gary Shell Cross City Trail (relation 9721958) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: this record's map line: about 13 miles in several pieces from Wade Park through the UNCW campus to its eastern end near Wrightsville Beach

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.