Genesee Valley Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through Swartz Creek, Flint Township and Flint · Genesee County
Conditions now
Loading the weather near Flint…
Forecast by the National Weather Service for Flint · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Elms Road mile 0.5 · restrooms directions to trailhead 1
- Parking at Elms Road mile 0.6 · restrooms directions to trailhead 2
- Parking at Elms Road mile 0.6 · restrooms directions to trailhead 3
- Parking mile 0.7 · restrooms directions to trailhead 4
- Parking mile 0.8 directions to trailhead 5
- Parking at Miller Road mile 1.8 directions to trailhead 6
- Parking at Island Street mile 8.1 directions to trailhead 7
- Trailhead at West Water Street mile 8.3 directions to trailhead 8
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Genesee Valley Trail is a shared-use, non-motorized path in Genesee County, Michigan, that begins at the Genesee Valley Center in Flint Township and runs northeast into the city of Flint, where it follows a former railway corridor. It links Flint Township with the Flint River Trail and, through it, with the Iron Belle Trail.
The City of Flint completed its 1.5-mile leg in August 2015. That section meets the Flint Township portion of the trail at Corunna Road and follows the old railway corridor through the city toward Chevy Commons. It cost about $730,000: roughly $525,000 came from the Michigan Department of Transportation through the federal Transportation Alternatives Program, $193,000 from Community Development Block Grants and $11,000 from the city's Transportation Division. New crossing islands and signals were installed where streets cross the trail, including HAWK pedestrian signals at Corunna Road and Court Street.
In 2019 a 1-mile paved extension from Chevrolet Avenue to Factory One, through Chevy Commons, joined the Genesee Valley Trail to the Flint River Trail. It was built with the Genesee County Road Commission, the Metropolitan Planning Commission, the City of Flint and Kettering University, which donated the land, and was paid for with a $300,000 Michigan Natural Resources Trust Fund grant. Genesee County Parks' director said riders could then go from Genesee Valley through Flint to the end of the Iron Belle Trail on Vassar Road. The record maps about 8 miles, including short paths near Elms and Miller roads in Flint Township and the riverfront end near Water Street.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Flint Bishop International Airport, 3.1 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 33 43 57 69 78 82 80 73 60 47 35 Low °F 16 17 25 35 46 56 60 58 50 40 31 22 Precipitation, in 2 1.7 2 3.1 3.7 3.1 3.4 3.2 2.9 2.8 2.3 1.9 Snow, in 15.1 13 6.6 2.4 0 0 0 0 0 0.3 3.3 11.4 - On the National Register
- Glenwood Cemetery, Flint · historic district, listed 2010 · nomination file for Glenwood Cemetery
- Old maps
USGS topographic maps of the trail's middle go back to the 1922 Durand sheet (1:62,500); the 1969 Swartz Creek sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Flint River Trail within 0.2 mi · 20.6 mi, paved
- Applewood Trail 1.0 mi away · 1.5 mi, paved
- Bicentennial Park Pathway 4.7 mi away · 2.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15792121, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Genesee Valley Trail Now Connects Flint Township to the Flint River Bike Trail, Includes New Crossing Signals in the City — City of Flint (August 6, 2015) · government source · checked Oct 15, 2026 Supports: shared-use non-motorized path beginning at the Genesee Valley Center; Flint leg completed 2015, 1.5 miles; connects with Flint Township portion at Corunna Road; follows former railway corridor; links to the Flint River Trail near Chevy Commons; costs and funding sources; crossing islands, HAWK signals at Corunna Road and Court Street
- 1-mile extension bridges gap between Genesee Valley, Flint River trails — Flintside (May 1, 2019) · web · checked Oct 15, 2026 Supports: part of the trail network of Genesee County; 1-mile paved extension from Chevrolet Avenue to Factory One through Chevy Commons; partners and Kettering University land donation; $300,000 DNR Trust Fund grant; Flint River Trail connects to the Iron Belle Trail; Genesee County Parks director's quote about riding to Vassar Road
- Genesee Valley Trail — OpenStreetMap relation 15792121 · web · checked Oct 15, 2026 Supports: mapped length and pieces near Elms Road, Miller Road and Water Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.