States › Colorado

I-70 Genesee Bike Path

Greenway in Colorado

In Jefferson County

Conditions now

Loading the weather near Genesee…

Forecast by the National Weather Service for Genesee · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Beaver Brook mile 0.6 · restrooms directions to Beaver Brook
Genesee Park, beside the trail (opens in a new tab)
Genesee Park, beside the trail · Photo: Postdlf · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The I-70 Genesee Bike Path is a concrete multi-use path on the north side of Interstate 70 in Genesee Park, in Jefferson County west of Denver. OpenStreetMap spells it "Gennessee Bike Trail". The Colorado Department of Transportation (CDOT) built it with Jefferson County, the City of Denver, the Denver Mountain Parks Foundation and other partners. Most of the path is on land owned by the City and County of Denver, and Denver Parks donated right-of-way. Construction began in October 2015, and the path opened on September 28, 2016. It cost $2.4 million.

CDOT gives the path's length as 2.4 miles, between mile points 251.4 and 253.8. It starts just west of the Genesee exit, near the Buffalo Herd Overlook, and runs to Evergreen Parkway; this record maps about 2.0 miles of it. Before the path opened, cyclists had to ride the shoulder of I-70 between Genesee and Evergreen Parkway. CDOT called it the final link in the "off I-70" bike route of about 150 miles, from the Denver area to a point west of Glenwood Springs.

The path is 10 feet wide and includes a 120-foot bridge over the buffalo crossing. Pull-outs sit on the steeper grades.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: June to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Gross Rsvr, 25.1 km from the trail's middle, 97 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394047526173797770574740
Low °F171722273544504841312418
Precipitation, in0.70.91.92.72.91.922.121.410.8
Snow, in9.4142119.83.90.1000.96.91211.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1899 West Denver sheet (1:125,000); the 1957 Evergreen sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. "Final Link" Bike Path Opens through Genesee Park — Colorado Department of Transportation · government source · checked Oct 17, 2026
    Supports: September 28, 2016 opening, 2.4 miles, concrete, 10 feet wide, 120-foot bridge over the buffalo crossing, route between the Genesee interchange and Evergreen Parkway, partners, Denver Parks right-of-way, $2.4 million, final link of the roughly 150-mile off-I-70 system, earlier shoulder riding
  3. I-70 Genesee Bike Path and Pedestrian Bridge — Colorado Department of Transportation · government source · checked Oct 17, 2026
    Supports: project name, north side of I-70, mile points 251.4 to 253.8, mostly on City and County of Denver land, start just west of the Genesee exit near the Buffalo Herd Overlook
  4. Construction of final piece of Bike path begins this week in Genesee Park — Colorado Department of Transportation · government source · checked Oct 17, 2026
    Supports: construction start in October 2015 (October 2015 news release)
  5. Way 520359822 (Gennessee Bike Trail) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: the OSM spelling, location north of I-70, mapped length about 2.0 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.