I-70 Genesee Bike Path
Greenway in Colorado
In Jefferson County
Conditions now
Loading the weather near Genesee…
Forecast by the National Weather Service for Genesee · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Beaver Brook mile 0.6 · restrooms directions to Beaver Brook
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The I-70 Genesee Bike Path is a concrete multi-use path on the north side of Interstate 70 in Genesee Park, in Jefferson County west of Denver. OpenStreetMap spells it "Gennessee Bike Trail". The Colorado Department of Transportation (CDOT) built it with Jefferson County, the City of Denver, the Denver Mountain Parks Foundation and other partners. Most of the path is on land owned by the City and County of Denver, and Denver Parks donated right-of-way. Construction began in October 2015, and the path opened on September 28, 2016. It cost $2.4 million.
CDOT gives the path's length as 2.4 miles, between mile points 251.4 and 253.8. It starts just west of the Genesee exit, near the Buffalo Herd Overlook, and runs to Evergreen Parkway; this record maps about 2.0 miles of it. Before the path opened, cyclists had to ride the shoulder of I-70 between Genesee and Evergreen Parkway. CDOT called it the final link in the "off I-70" bike route of about 150 miles, from the Denver area to a point west of Glenwood Springs.
The path is 10 feet wide and includes a 120-foot bridge over the buffalo crossing. Pull-outs sit on the steeper grades.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Gross Rsvr, 25.1 km from the trail's middle, 97 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 39 40 47 52 61 73 79 77 70 57 47 40 Low °F 17 17 22 27 35 44 50 48 41 31 24 18 Precipitation, in 0.7 0.9 1.9 2.7 2.9 1.9 2 2.1 2 1.4 1 0.8 Snow, in 9.4 14 21 19.8 3.9 0.1 0 0 0.9 6.9 12 11.1 - On the National Register
- Genesee Park, Golden · historic district, listed 1990 · nomination file for Genesee Park
- Old maps
USGS topographic maps of the trail's middle go back to the 1899 West Denver sheet (1:125,000); the 1957 Evergreen sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Pioneer Trail 2.0 mi away · 3.9 mi, paved
- Clear Creek Trail 2.5 mi away · 22.9 mi, paved
- Peaks to Plains Trail 2.8 mi away · 4.0 mi, paved
- 6th Avenue Trail 4.5 mi away · 4.4 mi, paved
- Highway 93 Trail 4.8 mi away · 1.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- "Final Link" Bike Path Opens through Genesee Park — Colorado Department of Transportation · government source · checked Oct 17, 2026 Supports: September 28, 2016 opening, 2.4 miles, concrete, 10 feet wide, 120-foot bridge over the buffalo crossing, route between the Genesee interchange and Evergreen Parkway, partners, Denver Parks right-of-way, $2.4 million, final link of the roughly 150-mile off-I-70 system, earlier shoulder riding
- I-70 Genesee Bike Path and Pedestrian Bridge — Colorado Department of Transportation · government source · checked Oct 17, 2026 Supports: project name, north side of I-70, mile points 251.4 to 253.8, mostly on City and County of Denver land, start just west of the Genesee exit near the Buffalo Herd Overlook
- Construction of final piece of Bike path begins this week in Genesee Park — Colorado Department of Transportation · government source · checked Oct 17, 2026 Supports: construction start in October 2015 (October 2015 news release)
- Way 520359822 (Gennessee Bike Trail) — OpenStreetMap · web · checked Oct 17, 2026 Supports: the OSM spelling, location north of I-70, mapped length about 2.0 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.