States › Delaware

Georgetown/Lewes Trail

Rail-trail in Delaware · OpenStreetMap relation

Runs through Georgetown and Lewes · Sussex County

Conditions now

Loading the weather near Milton…

Forecast by the National Weather Service for Milton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Lewes-Georgetown Trail is an 11 mile long rail trail built on the right-of-way of the abandoned portion of the Junction and Breakwater Railroad between Georgetown, Delaware and Lewes, Delaware. It currently exists in three segments: a 0.7 mile rail-with-trail section between Parsons Lane and Airport Road in Georgetown, a 7.5 mile rail-to-trail section from Fisher Road on the east side of Cool Spring, Delaware, to the Lewes and Rehoboth Canal in Lewes, and a 1.6 mile rail-to-trail section from the canal to Cape Henlopen State Park in Lewes.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Managed by DelDOT.

Length
9.0 mi 14.5 km1
On former railbed
6.7 mi 74%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Booker Street mile 0.1 directions to trailhead 1
  2. Parking at Janice Road mile 10.8 directions to trailhead 2
  3. Parking at Adams Avenue mile 13.8 · restrooms directions to trailhead 3
  4. Parking at Monroe Avenue mile 13.9 · restrooms directions to trailhead 4
  5. Parking at Schley Avenue mile 14.1 directions to trailhead 5
SwingBridge (opens in a new tab)
SwingBridge · Photo: Nolabob · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Georgetown–Lewes Trail is a rail-trail in Sussex County, Delaware, built by the Delaware Department of Transportation (DelDOT) on the right-of-way of the former Junction and Breakwater Railroad between Georgetown and Lewes. The line later became part of the Pennsylvania Railroad and was last run by the Delaware Coast Line Railroad; after the railroad bridge over the Lewes and Rehoboth Canal was judged unsafe in 2016, operations were shut down, the last train ran in 2017, and the rails were removed in 2018. Planning began with a 2006 statewide rails-to-trails master plan. The first section, from Gills Neck Road to Savannah Road in Lewes, opened in October 2016; later phases reached Route 9/Cool Spring Road in 2020 and Fisher Road in September 2022, and a 0.7-mile section between Parsons Lane and Airport Road in Georgetown opened on November 19, 2021.

The Lewes section begins at Gills Neck Road, where it shares a terminus with the Junction & Breakwater Trail to Rehoboth Beach, and runs past the Lewes Public Library, across Kings Highway and Savannah Road and under Route 1, then west through fields and woods to Fisher Road east of Cool Spring. A park beside the library has parking, restrooms, a water bottle–filling station, preserved rails, a replica station and a restored caboose. The Lewes section has 12 at-grade road crossings. A separate section runs from the canal to Cape Henlopen State Park.

The trail is paved with asphalt. The remaining gap of about 6 miles between Airport Road and Fisher Road is under construction: DelDOT broke ground in December 2024, began building the multi-use trail along the state-owned rail line in September 2025, and in February 2026 anticipated completion by spring 2027, when the trail will run 17 miles. This record maps about 9 miles, including the Georgetown section.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 29% of this route as a trail on former railroad right-of-way and 57% as an out-of-service rail line, naming the line Lewes Running.

Shade

38% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lewes, 6.7 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F464855667583888680695950
Low °F303238465666716964524235
Precipitation, in3.43.24.23.53.43.854.34.54.43.64.2
Snow, in26.51000000001
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1918 Rehoboth sheet (1:62,500); the 1954 Fairmount sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9722229, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Georgetown–Lewes Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q131425666, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Delaware Bicycle Council Meeting Minutes, February 4, 2026 — DelDOT · government source · checked Oct 14, 2026
    Supports: Fisher Road to Airport Road began construction September 2025; anticipated completion spring 2027
  5. DelDOT Bike Program Project Updates (2025) — DelDOT · government source · checked Oct 14, 2026
    Supports: Cool Spring Road to Fisher Road completed September 2022; final phase Fisher Road to Airport Road is a multi-use trail along the state-owned railroad
  6. Georgetown–Lewes Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: Junction and Breakwater Railroad right-of-way; Pennsylvania Railroad; canal bridge deemed unsafe 2016; last train 2017; rails removed 2018; 2006 master plan; first phase Gills Neck Road to Savannah Road October 2016; Route 9/Cool Spring Road 2020; Parsons Lane to Airport Road 0.7 mile opened November 19, 2021; Fisher Road September 2022; section from the canal to Cape Henlopen State Park; library park with parking, restrooms, bottle filler, preserved rails, replica station and Delaware Coast Line Railroad caboose; fields and tree tunnel; groundbreaking December 2024
  7. Georgetown-Lewes Trail — Delaware Greenways · organization · checked Oct 14, 2026
    Supports: former Delaware Coast Line Railroad rail bed; shared terminus with the Junction & Breakwater Trail on Gills Neck Road; Lewes Library, Kings Highway and Savannah Road crossings, underpass of Route 1; 12 at-grade road crossings; Sussex County; asphalt surface; 17 miles when complete; remaining 6 miles Airport Road to Fisher Road
  8. DelDOT is beginning the final phase of the Georgetown to Lewes Trail — 47abc (WMDT) · web · checked Oct 14, 2026
    Supports: December 2024 start of the final six-mile section from Airport Road in Georgetown to Fisher Road, completing the 17-mile trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.