States › Illinois

GM&O Heritage Trail

Rail-trail in Illinois

Runs through Columbia · Monroe County

Conditions now

Loading the weather near Columbia…

Forecast by the National Weather Service for Columbia · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Cherry Street mile 0 · restrooms directions to trailhead 1
  2. Parking at East Cherry Street mile 0.1 directions to trailhead 2
  3. Parking at East Cherry Street mile 0.1 directions to trailhead 3
Columbia, along the trail (opens in a new tab)
Columbia, along the trail · Photo: pasa47 · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The GM&O Heritage Trail is a rail-trail in Columbia, Illinois, on a former GM&O railroad line, which the City of Columbia describes as the railroad that connected Columbia to the outside world before cars and highways. Signs along the way show what train crews and passengers would have seen on the run between St. Louis and Columbia. The city welcomes walking and casual cycling.

The city reports 1.7 miles paved. The planned route runs from State Route 3 at South Main Street north to Quarry Road at Route 3, once called Millstadt Junction, and then on to the Union Pacific line under the Interstate 255 overpass, the former Bixby Junction. Completed, the trail would be more than 3 miles long, built in phases as funding allows. OpenStreetMap maps about 1.4 miles of asphalt along the old railbed, with parking off East Cherry Street, one lot with restrooms.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cahokia, 12.8 km from the trail's middle, 21 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414656687685888780705645
Low °F222635455665696759463527
Precipitation, in2.72.33.54.64.84.353.13.433.32.8
Snow, in4.93.71.20.30000000.82.9
Old maps

USGS topographic maps of the trail's middle go back to the 1910 Waterloo sheet (1:62,500); the 1955 Columbia sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. GM&O Heritage Trail — City of Columbia, Illinois · government source · checked Oct 17, 2026
    Supports: former railroad connecting Columbia to the outside world; interpretive signs of the St. Louis-Columbia run; walking and casual cycling; 1.7 miles paved; planned endpoints at Route 3/South Main Street, Quarry Road (Millstadt Junction) and the Union Pacific line under I-255 (Bixby Junction); over 3 miles when complete; phased construction as funding allows
  3. GM&O Heritage Trail — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: asphalt surface; mapped on the former railway (was:railway=rail); about 1.4 miles mapped; parking off East Cherry Street, one lot with restrooms

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.