States › New Hampshire

Goffstown Rail Trail

Rail-trail in New Hampshire · OpenStreetMap relation

Runs through Goffstown, Pinardville and Manchester · Hillsborough County

Conditions now

Loading the weather near Pinardville…

Forecast by the National Weather Service for Pinardville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.4 mi 8.6 km1
On former railbed
5.0 mi 92%
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Mill Street mile 0 directions to trailhead 1
  2. Parking at Flanders Court mile 0 directions to trailhead 2
  3. Parking at West Union Street mile 0 directions to trailhead 3
  4. Parking at Main Street mile 0 directions to trailhead 4
  5. Parking at East Union Street mile 0.1 directions to trailhead 5
  6. Parking at East Union Street mile 0.1 directions to trailhead 6
  7. Parking at East Union Street mile 0.1 directions to trailhead 7
  8. Parking at East Union Street mile 0.1 directions to trailhead 8
  9. Parking at Mill Street mile 0.1 directions to trailhead 9
  10. Parking at East Union Street mile 0.1 directions to trailhead 10
  11. Parking at East Union Street mile 0.1 directions to trailhead 11
  12. Parking at East Union Street mile 0.1 directions to trailhead 12
  13. Parking at East Union Street mile 0.1 directions to trailhead 13
  14. Parking at East Union Street mile 0.1 directions to trailhead 14
  15. Parking at East Union Street mile 0.1 directions to trailhead 15
  16. Parking at Sewage Disposal Road mile 0.2 directions to trailhead 16
  17. Parking at East Union Street mile 0.2 directions to trailhead 17
  18. Parking at Sewage Disposal Road mile 0.2 directions to trailhead 18
  19. Parking at South Mast Street mile 0.6 directions to trailhead 19
  20. Parking at South Mast Street mile 1 directions to trailhead 20
  21. Parking at Mast Road mile 1.5 directions to trailhead 21
  22. Parking at Mast Road mile 1.6 directions to trailhead 22
  23. Parking at Mast Road mile 3.3 directions to trailhead 23
  24. Parking at Danis Park Road mile 3.7 directions to trailhead 24
  25. Parking at Louis Street mile 5.2 directions to trailhead 25
  26. Parking at Electric Street mile 5.7 directions to trailhead 26
Goffstown Rail Trail, Goffstown NH.jpg (opens in a new tab)
Goffstown Rail Trail, Goffstown NH.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Goffstown Rail Trail is a 5.7-mile walking and cycling trail on the former railroad corridor between Goffstown village, New Hampshire, and the Manchester city line. The Goffstown and Manchester Railroad was incorporated in 1847; cars ran to Riverdale in February 1850, the line was consolidated with the Concord Railroad in 1853 as the North Weare Branch, and after the 1936 flood operation beyond Goffstown ceased. Regular use of the line stopped in 1981. The town agreed in 2004 to buy the corridor from the Boston and Maine Railroad. The town owns the trail; Public Works manages construction and Parks and Recreation maintains finished sections, assisted by the Friends of the Goffstown Rail Trail, formed in 2000 as Friends of the Greenway.

The trail runs from the Piscataquog River near the Main Street bridge in Goffstown village east through Grasmere and past the county complex, roughly parallel to Mast Road and the river, to the city line near Sarette Field in Pinardville. A bridge over the Piscataquog River, dedicated in October 2015, links it to Manchester's Piscataquog Trail, which continues about 2 miles into downtown Manchester. Parking includes the Mast Road lot with a trail kiosk, a lot near the Goffstown Junior Baseball fields, and eight spaces for trail users at the Residence at Hadley Falls.

Construction proceeded in stages from 2008, largely with Recreational Trails Program grants; crossing realignments and beacons were finished in January 2016. Town standards call for a 10-foot gravel surface with 3-foot shoulders. In 2026 the friends group reported the trail 97.3 percent complete, with a 250-foot section near the Shell station on Mast Road under contract for 2026 and a final 400 feet still to be built. Walking, running, cycling, skiing and snowshoeing are allowed and dogs must be leashed; motor vehicles, including snowmobiles, horses, inline skates and scooters are banned.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Manchester - N. Weare and Goffstown Branch. From New Hampshire Railroads (NH GRANIT / NHDOT).

Shade

47% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Massabesic Lake, 12.5 km from the trail's middle, 10 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323543566776818073604838
Low °F131524354656615952403021
Precipitation, in2.72.73.23.53.44.33.63.73.94.43.53.8
Snow, in15.917.66.70.90000001.110.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1927 Concord sheet (1:62,500); the 1969 Goffstown sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Goffstown, c. 1912: B&M Station with train
Goffstown, c. 1912: B&M Station with trainPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

1 Reddit thread about this trail, Sep 2024

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Goffstown Rail Trail (opens in a new tab)
  1. 360° view 1 of 6, photo by Lanka6359
  2. 360° view 2 of 6, photo by Lanka6359
  3. 360° view 3 of 6, photo by Lanka6359
  4. 360° view 4 of 6, photo by Lanka6359
  5. 360° view 5 of 6, photo by Lanka6359
  6. 360° view 6 of 6, photo by Lanka6359
360° panorama · Photo: Lanka6359 · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12680354, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. History of the Railroad — Goffstown Rail Trail · organization · checked Oct 13, 2026
    Supports: Goffstown and Manchester Railroad incorporated 1847, cars to Riverdale February 1850, consolidation with the Concord Railroad 1853 as the North Weare Branch, operation beyond Goffstown ceased after the 1936 flood, regular use stopped 1981
  3. History of the Trail — Goffstown Rail Trail · organization · checked Oct 13, 2026
    Supports: Friends of the Greenway formed December 2000 and renamed 2007; 2001 warrant article; March 2004 agreement with the Boston and Maine Railroad to buy the corridor; construction from 2008 with Recreational Trails Program grants; Transportation Enhancement crossing project completed January 2016; Piscataquog River Trail Bridge dedicated October 26, 2015
  4. Frequently Asked Questions — Goffstown Rail Trail · organization · checked Oct 13, 2026
    Supports: endpoints at the Main Street bridge and near Sarette Field, route through Grasmere and the county complex parallel to Mast Road, bridge to the Piscataquog Trail which continues about 2 miles into Manchester, 10-foot gravel with 3-foot shoulders and no plans to pave, town ownership, Public Works and Parks and Recreation roles, permitted and prohibited uses, leashed dogs
  5. Goffstown Rail Trail — Friends of the Goffstown Rail Trail · organization · checked Oct 13, 2026
    Supports: 97.3 percent complete, 250-foot Mast Road section under contract for 2026, final 400 feet to be built, parking at Mast Road, the baseball fields and the Residence at Hadley Falls

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.