Goose Creek Connector Trail
Greenway in Iowa
Runs through Davenport · Scott County
Conditions now
Loading the weather near Davenport…
Forecast by the National Weather Service for Davenport · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Goose Creek Bike Path, as OpenStreetMap names it, is a multi-use trail in north Davenport, Iowa, that the City of Davenport calls the Goose Creek Connector Trail. The city has been building it in phases to link the Veterans Memorial Multi-Use Trail with the Duck Creek Multi-Use Trail, giving access to the city's active transportation and recreation network, arterial roads, and collector streets with dedicated bike lanes. It is a greenway, not a rail-trail.
In 2023, together with improvements to East 53rd Street, the city extended the trail from 59th Street to 53rd Street, with a passage underneath East 53rd Street; KWQC reported the completion of that phase in October 2023. A city notice in March 2024 set out the next work: a connector between Goose Creek and 59th Street near Brady, the corridor from 59th Street to the Veterans Memorial trail, rehabilitation of the existing section between 46th and 53rd Streets, and a new section between 46th Street and the Duck Creek trail.
The mapped route is about 2.2 miles and reaches East 39th Street at its south end. No source found confirms whether all of the 2024 work has been finished, and the surface is not recorded.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Davenport, 4.8 km from the trail's middle, 31 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 34 48 61 72 81 84 82 76 63 48 35 Low °F 14 18 29 39 51 61 64 62 53 42 30 20 Precipitation, in 1.1 1.4 2.3 3.6 4.8 4.7 4.1 4 3.5 2.7 2.2 1.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Davenport sheet (1:62,500); the 1953 Davenport East sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Duck Creek Parkway Trail 0.5 mi away · 11.2 mi, surface unknown
- Riverfront Trail 2.1 mi away · 21.4 mi, paved
- Eldridge/Long Grove Trail 3.1 mi away · 4.9 mi, paved
- Great River Trail 3.4 mi away · 44.6 mi, paved · Illinois
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Goose Creek Connector Trail in the Works (March 28, 2024) — City of Davenport · web · checked Oct 15, 2026 Supports: name Goose Creek Connector Trail; purpose and connections; 59th to 53rd Street extension under E 53rd St; 2024 work: Goose Creek to 59th St near Brady, 59th St to Veterans Memorial trail, rehabilitation 46th-53rd, new section 46th St to Duck Creek trail
- Davenport extends Goose Creek Connector Trail (October 25, 2023) — KWQC · web · checked Oct 15, 2026 Supports: phase completion reported October 2023; link between Veterans Memorial Parkway and Duck Creek path
- Way: Goose Creek Bike Path — OpenStreetMap · web · checked Oct 15, 2026 Supports: OpenStreetMap name 'Goose Creek Bike Path'; mapped route reaching East 39th Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.