Goose Creek Trail
Greenway in South Carolina · OpenStreetMap relation
Runs through Goose Creek · Berkeley County
Conditions now
Loading the weather near Goose Creek…
Forecast by the National Weather Service for Goose Creek · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 1.6 directions to trailhead 1
- Parking at Saint James Avenue mile 3.1 directions to trailhead 2
- Parking at Saint James Avenue mile 3.1 directions to trailhead 3
- Parking at Saint James Avenue mile 3.1 directions to trailhead 4
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Goose Creek Trail is a paved shared-use path along North Goose Creek Boulevard (US 52) in the city of Goose Creek, Berkeley County, South Carolina. The name comes from OpenStreetMap, which maps the path as an asphalt cycleway; the City of Goose Creek, which bids out work on it, refers to its paths along the boulevard simply as bike trails, and in 2011 Patch described a 10-foot-wide hiker/biker trail on the boulevard.
This record maps about 3.1 miles: about 2.5 miles running north from near St. James Avenue (US 176) through the Shannon Park and Colonial Heights areas to Boulder Bluff, and a separate path of about 0.6 mile beside Gainesborough Drive in the Stratford Forest neighborhood west of US 52. The path passes the city's municipal complex: in December 2011 the City Council approved a 1,650-foot extension of the trail from the complex parking lot around to the Goose Creek Community Center and on to the large pond behind the complex, at a cost of $199,572.30 paid with state and federal grant money.
The surface is asphalt, 10 feet wide. In March 2026 the city advertised for bids to mill and repave about 8,622 feet of 10-foot bike trails, including the North Goose Creek Boulevard path from City Hall to 503 North Goose Creek Boulevard and from Hollywood Drive to Seewee Drive. In October 2026 the city began building a 10-foot shared-use path of about 1,400 feet at Old Mount Holly Road and Highway 52, a $180,000 project paid mostly by Berkeley County, linking the Recreation Department entrance with existing paths as part of the city's Master Connectivity Plan; the Old Mount Holly Road connection was expected by January 6.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Charleston International Airport, 12.7 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 60 64 70 77 84 88 91 90 85 78 69 63 Low °F 39 42 47 54 63 70 74 73 68 58 47 42 Precipitation, in 3.4 3 3.4 3.3 3.3 6.2 6.6 7 6 4.3 2.7 3.4 Snow, in 0.2 0.1 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1919 Summerville sheet (1:48,000); the 1957 Mount Holly sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Crowfield Path 0.4 mi away · 2.1 mi, paved
- Westview Way 0.4 mi away · 1.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17411982, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Invitation for Bid: Plantation North and US-52 Bike Trail Resurfacing, City of Goose Creek — South Carolina Business Opportunities · government source · checked Oct 16, 2026 Supports: March 2026 bid; mill and pave about 8,622 feet of 10-foot-wide bike trails; segments on N Goose Creek Blvd from City Hall to 503 N Goose Creek Blvd and from Hollywood Drive to Seewee Drive
- Goose Creek breaks ground on pedestrian path project — Live 5 News (October 14, 2026) · press · checked Oct 16, 2026 Supports: 10-foot shared-use path at Old Mount Holly Road and Highway 52; about 1,400 feet; $180,000, mostly Berkeley County; connects to the Recreation Department entrance and existing paths; Master Connectivity Plan; Old Mount Holly Road connection expected by Jan. 6
- Walk/Bike Trail Extension Approved — Goose Creek Patch (December 15, 2011) · press · checked Oct 16, 2026 Supports: hiker/biker trail along North Goose Creek Boulevard ending at the municipal complex parking lot; 1,650-foot extension of the 10-foot-wide trail to the Community Center and the pond behind the complex; $199,572.30; state and federal grant money
- Goose Creek Trail, way 1538475683 — OpenStreetMap · web · checked Oct 16, 2026 Supports: name Goose Creek Trail; asphalt cycleway; route beside North Goose Creek Boulevard (US 52) from near St. James Avenue (US 176) north to Boulder Bluff; record length about 3.1 miles, including a separate 0.6-mile path of the same name (way 1272374303) beside Gainesborough Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.