States › Michigan

Grand Rapids Township Trails

Greenway in Michigan

Runs through Grand Rapids Township · Kent County

Conditions now

Loading the weather near Forest Hills…

Forecast by the National Weather Service for Forest Hills · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Knapp Street Northeast mile 0 directions to trailhead 1
  2. Parking at Knapp Street Northeast mile 0 directions to trailhead 2
  3. Parking at Knapp Street Northeast mile 0 directions to trailhead 3
Grand Rapids Township Trails drawn on the 1967 USGS topographic map of Rockford, Michigan
Then: the 1967 USGS Rockford sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Grand Rapids Township Trails is the name OpenStreetMap gives to a paved path in Grand Rapids Charter Township, Kent County, Michigan. The township's existing and future non-motorized recreational trail map shows an existing non-motorized trail running east from East Beltline Avenue along Knapp Street, and gives it no name of its own; the mapped line follows Knapp Street Northeast for much of its length. The line covers about 2.0 miles (3.3 km) in four pieces, tagged asphalt or concrete, with bicycles designated on most of them. Fox 17 reports that a new pedestrian bridge over the Grand River on Knapp Street, part of the Grand River Greenway, would provide access to Grand Rapids Township via Knapp Street, and that county leaders expect it to be finished by August 2027.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

27% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Grand Rapids, 12.3 km from the trail's middle, 3 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313444587079838174614736
Low °F192027374958626153423325
Precipitation, in2.52.12.4443.93.93.53.443.12.5
Snow, in22.617.27.62000000.37.120.8
Old maps

USGS topographic maps of the trail's middle go back to the 1918 Cedar Springs sheet (1:62,500); the 1967 Rockford sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Existing & Future Non Motorized Recreational Trail Map — Grand Rapids Charter Township · web · checked Oct 31, 2026
    Supports: legend entries Existing Non-Motorized Trail, Existing Major Street Sidewalk and Future Non-Motorized Paths; an existing non-motorized trail drawn along Knapp Street east of East Beltline Avenue; street names only, no trail names
  3. New pedestrian bridge planned to connect trails across the Grand River in Ada — FOX 17 (undated page) · web · checked Oct 31, 2026
    Supports: pedestrian bridge over the Grand River on Knapp Street; part of the Grand River Greenway; lets residents access Grand Rapids Township via Knapp Street; county leaders project completion by August 2027
  4. Grand Rapids Township Trails — OpenStreetMap way 490427987 · web · checked Oct 31, 2026
    Supports: name Grand Rapids Township Trails; highway=path, surface=asphalt, bicycle=designated, foot=designated
  5. Grand Rapids Township Trails — OpenStreetMap way 553419579 · web · checked Oct 31, 2026
    Supports: highway=path, surface=concrete, bicycle=designated, foot=designated
  6. Knapp Street Northeast — OpenStreetMap way 727409085 · web · checked Oct 31, 2026
    Supports: road named Knapp Street Northeast, highway=tertiary; the mapped line lies within about 30 m of this street for most of its length

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.