States › New Hampshire

Granite Town Rail Trail

Rail-trail in New Hampshire

Runs through Milford · Hillsborough County

Conditions now

Loading the weather near Milford…

Forecast by the National Weather Service for Milford · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.0 mi 4.9 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Granite Rail Trail Parking mile 0 directions to Granite Rail Trail Parking
Granite Town Rail Trail, Milford NH.jpg (opens in a new tab)
Granite Town Rail Trail, Milford NH.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Granite Town Rail Trail is a trail of about 3 miles in Milford, New Hampshire, running from Route 13 south of downtown to Melendy Road, where it continues as the Brookline Rail Trail. For much of its length it follows a former railroad right-of-way, and the Milford Conservation Commission carries out improvements on it. The surface is mostly unpaved, with sand, gravel, dirt and cinders and short concrete sections, and the trail is used for walking, cycling, mountain biking, horseback riding and cross-country skiing.

The northern end is beside the Milford Department of Public Works on Route 13, where a small dirt lot serves the trail. Just beyond it the trail crosses Great Brook over an old dam, then crosses Union Street and the brook again on a concrete span. After about three-quarters of a mile it passes under Route 101 through a long tunnel that also serves as an overflow culvert for Great Brook. South of Armory Road, about 1.2 miles from the start, the trail leaves the railroad right-of-way and passes through private property, where users are asked to stay on the trail. At Melendy Road, which also has parking, a tunnel under the road leads onto the Brookline Rail Trail.

A bridge stood at Armory Road until the early to mid 1900s. Rather than replace it, the Conservation Commission chose to improve the road crossing, installing rectangular rapid flashing beacons and planning to regrade the approach from a 120 percent slope to 12 percent; the Milford Kaley Foundation bought the equipment. The site work, and the new tunnel under Melendy Road, were paid for with revenue from the Ghost Train Trail Races, an ultramarathon held on the trail each October. The 17th running is scheduled for October 17 and 18, 2026.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Brookline - Milford, Brookline Branch and Abandoned. From New Hampshire Railroads (NH GRANIT / NHDOT).

Shade

76% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Milford, 3.2 km from the trail's middle, 15 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333645586978838173604938
Low °F141524344555605850382820
Precipitation, in333.84.23.443.73.744.93.94.5
Snow, in15.411.514.42.3000000.11.112.6
Old maps

USGS topographic maps of the trail's middle go back to the 1906 Milford sheet (1:62,500); the 1968 Milford sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Town of Milford, NH - Conservation Commission · government source · checked Oct 13, 2026
    Supports: Armory Road crossing improvement project: beacons, bridge there until the early/mid 1900s, regrading from 120% to 12%, Milford Kaley Foundation equipment, site work paid from Ghost Train race savings; Melendy Road tunnel funded by race revenue; 17th Ghost Train race October 17–18, 2026
  3. Granite Town Rail-Trail — TrailLink · web · checked Oct 13, 2026
    Supports: 3 miles from Route 13 to the Brookline Rail Trail; surfaces; activities; DPW lot; Great Brook dam and concrete span; Route 101 tunnel and culvert use; private property south of Armory Road at about 1.2 miles; Melendy Road tunnel and parking; annual October race

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.